TEST REPORT

Date Of Inspection :09/12/2015


Customer JKPDD,Bemina,Jammu & Kashmir(J&K)
Contract No. SE-1/S&0/3 of 2015 dt 06-07-2015
Equipment Name 132kV C & R Feeder Panel, Simplex Type
Quantity 4 Nos
Equipment Sr. No. NICPL-CP-15-(278-281)
This is to certify that above mentioned Products/System have been inspected & functionally tested for following
Acceptance test as per GA & Scheme Drawing and found working schematically.

1) Refernce Documents
a) General Arrangements Drawing NICPL-155-02-105
b) BOM Drawing No. NICPL-155-02-106
c) Schematic Drawing No. NICPL-155-02-107
2) Visual Inspection OK
3) Insulation Resistance Test >lOOMega Ohm @ 2.5kVDC
4) Dielectric Test @ 2kV for lmin OK
5) Functional Test
a) Checking of Control And Relay Circuits Checked and found OK
Checking of Auxiliary Supply (llOVDC and
Checked and found OK
b) 230VAC) Circuits
c) Checking Of Annunciation Circuits. Checked and found OK
Secondary Injection test of CT and PT
Checked and found OK
d) Circuits.
Functioning Of Semaphore, Indication
Checked and found OK
e) Lamps, Lamp Test Circuits.
Functioning Of Annunciator,11ooter and
Checked and found OK
f) Bell.
6) Dimensional Check Checked and found OK
7) Painting Thickness Checked and found OK
8) Any other functional Test. Not Appilcable.