CHECKLIST BASED ON SCHEDULE OF COMPLIANCE FOR PRE-DELIVERY INSPECTION (PDI)


FAST INTERCEPTOR BOAT (FIB)

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
CHAPTER 1 - SCOPE
1 Scope

1.1 There is an operational requirement for Armed Forces personnel to


be equipped with the FIB to be used in the intercept Contact of
Interest (COI) that have been detected in Area of Operation (AO).

1
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
CHAPTER 2 - REQUIREMENT

2 Requirement

2.1 General Characteristics. The boat that will be known as Fast ☐ High speed
Interceptor Boat (FIB) will be a high speed, agile and manoeuvrable ☐ Agile
boat that to be used to intercept Contact of Interest (COI) that have ☐ Manoeuvrable
been detected in Area of Operation (AO).

2.2 Functional Characteristics. The requirement of this boat to Role:


conduct role as interceptor, patrol, ship or vessel boarding and ☐ Interceptor
search and rescue (SAR). Specifically, they will be designed and ☐ Patrol
built as: ☐ Boarding
☐ SAR

2.2.1 a. High speed pursuit boat to carry out anti-smuggling ☐ High speed pursuit
surveillance and operations against maritime vessels or ☐ High surveillance
installations at anchor or at sea, or against land installations with
water borders.

2.2.2 b. High Speed ferrying boat to transport small detachments of ☐ Ferrying


men between the AO.

2
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.3 Performance Characteristics.
2.3.1 Mobility:
a. Mobility. The FIB shall be able to be transported to the AO ☐ Towed with trailer
by land (towed trailer) and sea (ship) hoisted up by 5 tones crane. ☐ Hoisted with 5 Tonne Crane
The boat shall be a well proven hull design, constructed,
equipped, and fitted out to meet the above tasks.

2.3.2 b. Robustness. It shall be able to withstand rough handling in ☐ Rough handling


extreme conditions.

2.3.4 c. Simplicity.
☐ Simple to handle
2.3.4.1 (1) The FIB shall be able to be used without major
adjustment and alteration.

2.3.4.2 (2) It shall be simple to operate without much special ☐ Simple to operate
training.
2.3.5 ☐ Sea state 3
d. Climatic Condition. It shall be able to operate in all type of ☐ Anti fouling
tropical weather conditions. ☐ Water resistant

2.3.6 e. Reliability. The FIB shall be highly reliable in any operating ☐ Long range operation
conditions and environments. It also shall be able to operate long
range over rough sea conditions.
2.3.7 ☐ Wave 0.5 m
☐ Wave 1.0 m
f. Sea State. Up to sea state 3 (withstand wave height from 0.5
☐ Wave 1.5 m
to 1.5 metres).
☐ Wave 2.0 m

3
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.3.8 g. Economic Life. The FIB body/hull shall have a minimum ☐ 10 years life
economic life of 10 years.

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.4 Technical Characteristics.
2.4.1
a. Physical aspect. Each FIB shall be complete with the
following sub-assemblies and components:

2.4.1.1 (1) Boat.


2.4.1.2 (2) Structures and Fittings.
2.4.1.3 (3) Machinery and Equipment.
2.4.1.4 (4) Electrical System and Associated Equipment.
2.4.1.5 (5) Navigation and Communication System.
2.4.1.6 (6) Safety and Emergency Equipment.

2.5 Technical.
It shall be fitted with but not limited to the following requirement and
specifications:
2.5.1 a. Boat.
2.5.1.1 (1) Dimensions.
(a) Length (Overall) - Minimum 10.0 meters. ☐ Length ≥10.0 meters
(b) Width (Overall) - 2.7 – 3.0 meters. ☐ Width ≥ 2.7 meters ≤ 3.0 meters
(c) Draught - Not more than 0.6 meters. ☐ Draught ≤ 0.6 meters.
2.5.1.2 (2) Weight.
(a) Without fuel - Not more than 3000 kg. ☐ ≤ 3000 kg. Berat kosong
(b) With Fuel - Not more than 4000 kg. ☐ ≤ 4000 kg. + minyak
2.5.1.3 (3) Capacity.
(a) Complements - 12 persons (incl 2 x crew) ☐ Capable 12 pax

4
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
(b) With Fuel & Payload not more than 5000 kg. ☐ ≤ 5000 kg. + fuel & load
2.5.1.4 (4) Speed.

(a) Maximum speed - Not less than 50 knots ☐ ≥ 50 knots (5000 kg)
(Full Loaded 5000 kg). ☐ Sea state 1
☐ Sea state 2
☐ Sea state 3

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)

(b) Cruising speed - Not less than 35 knots (Full Loaded ☐ ≥ 35 knots (5000 kg)
5000 kg). ☐ Sea state 1
☐ Sea state 2
☐ Sea state 3
2.5.1.5 (5) Range and Endurance with Full Load.

(a) At maximum speed not less than 150 nm. ☐ ≥ 50 knots, ≥ 5000kg, ≥150 nm, 3 hrs

(b) At cruising speed not less than 200 nm. ☐ ≥ 35 knots, ≥ 5000kg, ≥ 150 nm, 5.75 hrs
(6) Manoeuvrability. The FIB shall able to perform the
2.5.1.6
requirement as but not limited to the following:

(a) Turning circle of Port and Starboard within 50% full RPM
a radius of not more than six (6) boat lengths when ☐ Figure of “O”
proceeding at 50% of full engine r.p.m (continuous) ☐ Figure of “8”
and within a radius of not more than ten (10) boat
length when proceeding at 100% of full engine 100% full RPM
r.p.m. ☐ Figure of “O”
☐ Figure of “8”

5
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
(b) The astern turning circles to Port and ☐ < 4 boat length
Starboard shall be less than 4 boat length in
diameter.

(c) Low profile when planning at full speed and ☐ Low profile when planning at full speed
highly stable in sharps turns to port and starboard. ☐ Highly stable in sharps turns to port
☐ Highly stable in sharps turns to stbd

(d) Able to float when fully swamped and have ☐ To float when fully swamped
ample strength to withstand up to Sea State 3 and ☐ To withstand up to sea state 3
shall be able to maintain stability without capsizing. ☐ To maintain stability without capsizing

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.2 b. Structures and Fittings.
2.5.2.1 (1) Hull.
(a) Design of the FIB hull shall be deep ‘V’ hull
shape that durable and able to withstand repeated ☐ Deep ‘v’ hull shape design
use in rough condition not less than Sea State 3. ☐ Withstands ≥ sea state 3

(b) Design of the FIB hull shall be able to


withstand the maximum speed not less than 50 ☐ to withstand ≥ 50 knots (full load)
knots (full load) and fuel efficiency is achieved. ☐ to achieved fuel efficiency
(c) Hull construction shall be fibreglass or ☐ Fibreglass or better material
better material and the collar construction is made ☐ Collar, EVA foam (d type) with PU foam).
of EVA foam (D type) with Polyurethane Foam (PU
foam).
(d) The hull shall be designed and meet the Hull shall be designed and meet the
requirement of classification bodies such as requirement of classification bodies:
Bureau Veritas, Germanischer Lloyd, ABS, DNV
and etc. ☐ Bureau Veritas
☐ Germanischer Lloyd
☐ ABS

6
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
☐ DNV
☐ Others: (please stated) _____________

(e) The hull design also shall include boat ☐ Hull design include boat transom
transom that able to withstand 1.5 of the maximum ☐ To withstand 1.5 of max OBM weight
OBM weight and capability (horsepower). ☐ To withstand 1.5 of the max HP

2.5.2.2 (2) Deck. The FIB shall have a high quality, ☐ High quality
immensely strong, wear resistant, anti-skid, robust and ☐ strong, wear resistant deck
durable deck floor suitable for rough use. It shall be ☐ rough use
unaffected by weather (and excesses of heat, cold or
☐ Anti-skid
humidity).
☐ Unaffected by weather

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.2.3 (3) Seats. Ten (10) jockey style suspension seats with ☐ 10 jockey style suspension seats
footrest, hand grips for every seat, and adequate shock ☐ Footrest
absorption for comfort located at the rear of boat crew and ☐ Hand grips
two (2) stand up seats for the boat crew are to be
☐ Shock absorption for comfort located at
provided making a total of twelve (12) complements. All seats
the rear of boat crew
are to be provided with adequate holding strap/rail and bolted
on the deck. ☐ 2 stand up seats for the boat crew
☐ All seats provided with adequate holding
strap/rail
☐ All seats bolted on the deck

2.5.2.4 (4) Fuel Cells/Tanks. It shall consist as follows:


(a) Fuel cells/tank shall be removable and ☐ Removable
attached to the hull structure, with opening for easy ☐ Attached to the hull structure
access. ☐ Opening for easy access.

7
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
(b) The tank shall be housed in a National ☐ Housed in a vapour tight compartment
Standard for Commercial Vessels (NSCV) approved
vapour tight compartment according to NSCV Part
C Section 5 Subsection 5A Chapter 4 or equivalent.

(c) The tank shall be vapour - fuel separation ☐ Vapour - fuel unit discharge
unit discharge below the tubes, and no fumes find ☐ No fumes at rest
their way aboard at rest or when moving. ☐ No fumes when moving
(d) It shall be fitted with:
I. Emergency fuel shut-off valves. ☐ fuel shut-off valves
II. Individual water separator filter. ☐ Individual water separator filter
III. Fire rated flexible fuel hoses. ☐ Fire rated flexible fuel hoses
☐ Appropriate fillers
IV. Appropriate fillers and breathers.
☐ Appropriate breathers
(e) The fuel tank capacity shall be not less than ☐ Capacity ≥ 800 liter
800 liter and full engine bay splash well. ☐ Full engine bay splash well
(f) It shall be fitted with fuel level indicator at ☐ Fuel level indicator at the tank
the tank and the control console. ☐ Fuel level indicator at the control console

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
(5) Fittings. Each FIB shall consist of but not limited
2.5.2.5
to the following:
(a) Not less than ten (10) eye plates are to be ☐ ≥ 10 eye plates on transverse frame
integrated on the transverse frames for securing
loose gears.
(b) Not less than three (3) lashing eyes to be ☐ ≥ 3 lashing eyes on each side of boat
fitted on each side.
(c) Three (3) towing eyes, one (1) at forward ☐ Fitted with 2 towing eyes at aft section
hull and two (2) at aft section. ☐ Fitted with 1 towing eyes at fwd hull

(d) Two (2) forward and two (2) aft lifting eyes. ☐ Fitted with 2 fwd lifting eyes
☐ Fitted with 2 aft lifting eyes
8
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)

(e) Self-draining system for the deck. ☐ Fitted with self-draining system
*Additional from staf observation ☐ Fwd bollard
☐ Rear bollard
☐ Dark grey colour
(6) Colour. Colour of the FIB (including all fittings) shall
2.5.2.6 ☐ All fittings painted with dark grey colour
be painted with dark grey non-reflective paint.
☐ Non-reflective paint
2.5.2.7 (7) Markings. All FIB shall be marked as follows:
(a) Manufacturer. ☐ Manufacturer marking
(b) Manufacturing date. ☐ Manufacturing date marking
(c) Capacity. ☐ Capacity marking
(d) JTF 2 (ATB 2) logo. ☐ JTF 2 (ATB 2) logo

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.3 c. Machinery and Equipment.
2.5.3.1 ☐ ≥ 2 OBM
(1) Engine and Propulsion. The FIB shall have two (2) ☐ ≥ 50 knots (5000 kg)
minimum OBM engine capable of generating speeds in ☐ Electrically started with key engine
excess of 50 knots when the FIB is fully laden. Engine shall
☐ High reliability engine
be electrically started with key and of high reliability. The
engine controls, instrumentations and switches are laid out ☐ Engine control, instruments and switches
on the console for the safety and ease of operation of the on the console
coxswain and navigator (boat crew). Each engine system
includes the following:
9
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
(a) 12V electrical system c/w alternator. ☐ 12v electrical system c/w alternator
(b) Remote starting control. ☐ Remote starting control
(c) Emergency cut off. ☐ Emergency cut off
(d) Standard power trim and tilt system with trim ☐ Standard power trim
gauges at console. ☐ Tilt system with trim gauges at console
(e) Stainless steel propeller. ☐ Stainless steel propeller
(f) Variable oil injection system. ☐ Variable oil injection system
(g) Engine tie bar with each pair of engines ☐ Engine tie bar with each pair of engines
supplied. supplied
(h) Fuel lines. ☐ Fuel lines
☐ Overheat protection system
(i) Overheat protection system, with audio and
☐ audio warnings at console
visual warnings at console.
☐ visual warnings at console
2.5.3.2 (2) Steering System. The steering system shall be ☐ hand hydraulic system
fitted with a hand hydraulic system and emergency hand ☐ Emergency hand steering system
steering system in order to provide optimum control in all
weather conditions.

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.4 d. Electrical System and Associated Equipments.
2.5.4.1 ☐ maintenance free batteries
(1) Batteries. Power supply shall be from sufficient ☐ ≥ 12 hours of usage
number of maintenance free batteries capable of at least 12
☐ Waterproof casing
hours of usage with waterproof casing and onboard charging
facilities. The battery shall be based from normal, off-the- ☐ Onboard charging facilities
☐ off-the-shelf type commercial channels
10
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
shelf type and available through normal commercial
channels.
2.5.4.2 ☐ Fitted electrical horn
(2) Horn, Siren and PA system. The boat shall be
☐ Fitted siren
fitted with an electrical horn, a siren and PA system in order
to alert other boats for safety and interception. ☐ Fitted PA system

2.5.4.3 (3) Strobe Light. The boat shall be fitted with with a ☐ Fitted blue strobe light
blue strobe light
2.5.4.4 (4) Search Light. Each FIB shall be supplied with one ☐ 1 unit portable searchlight
(1) unit portable searchlight and one (1) unit fix searchlight ☐ 1unit fix searchlight with 1 million cd
with 1 million candela.
2.5.4.5 ☐ Standard navigation lights (port)
(5) Navigation Lights. Standard navigation lights (port,
☐ Standard navigation lights (starboard)
starboard and mast light).
☐ Standard navigation lights (mast light)
2.5.4.6 (6) Bilge Pumps and Alarm System. The FIB shall be ☐ Hand operated and electric bilge pump
equipped with hand operated and electric bilge pump complete with alarm system
complete with alarm system. The pumps shall be fitted in the ☐ complete with alarm system
bilges.

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.5 e. Navigation and Communication System.

11
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.5.1 (1) Navigation Radar. The boat shall be fitted with one ☐ detection 10 – 24 nm range
(1) navigation radar capable of detection 10 – 24 nautical ☐ display monitor not less than 10 inches
miles range with display monitor not less than 10 inches ☐ Radar integrated with GPS
integrated with Global Positioning System (GPS), Automatic ☐ Radar integrated with AIS
Identification System (AIS) and Electronic Chart complete ☐ electronic chart complete with chart card
with chart card covering Malacca Strait, South China Sea covering Malacca Strait, South China Sea
and Sulu Sea. and Sulu Sea
2.5.5.2 (2) Global Positioning System (GPS). The boat shall ☐ GPS integrated with nav radar
be fitted with one (1) GPS that integrated with Navigation
Radar.
2.5.5.3 (3) Automatic Identification System (AIS). The boat ☐ AIS integrated with nav radar
shall be fitted with one (1) AIS that integrated with
Navigation Radar.
2.5.5.4 (4) Echo Sounder. The boat shall be fitted with one (1) ☐ Echo sounder c/w monitor
Echo Sounder complete with monitor.
2.5.5.5 (5) Magnetic Compass. The boat shall be fitted with ☐ Magnetic compass
one (1) magnetic compass for references and in case of
GPS failure.
2.5.5.6 (6) Boat Tracker. The boat shall be fitted with boat ☐ Boat tracker system
tracker system for the purpose of boat tracking, tactical and
operational usage.
2.5.5.7 (7) VHF Maritime Radio. The boat shall be fitted with ☐ VHF maritime radio
VHF radio for communication purposes in accordance with
IMO standard.
2.5.5.8 (8) GIRN Marine Kit. The boat must have enough ☐ Space for installation girn on console
space on the console and able to fit GIRN Marine Kit ☐ Able to fit GIRN marine kit
communication system.
2.5.5.9 (9) FLIR. The boat must have enough space and able ☐ FLIR (space for installation)
to fit FLIR when there is new requirement. ☐ able to fit FLIR

Ser Compliance

12
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
Requirements & Specification PDI’s Checklist Yes No Remarks
(a) (b) (c) (f) (g)
2.5.6 f. Safety and Emergency Equipment.
2.5.6.1 (1) Oars. Each FIB shall be equipped with minimum ☐ ≥ 4 lightweight foldable oars for rowing CES
four (4) lightweight foldable oars for emergency rowing in
case of engine failure.
2.5.6.2 (2) Fire Extinguisher. Each FIB shall be equipped with ☐ 1 unit 2 kg co2 fire extinguishers CES
one (1) unit 2 kg CO2 fire extinguishers and one (1) unit 2 ☐ 1 unit 2 kg dry powder
kg dry powder fire extinguisher suitable for sea operations.
2.5.6.3 (3) First Aid Kit. Each FIB shall be equipped with first ☐ First aid kit with usable medical supplies CES
aid kit complete with usable medical supplies that are related ☐ First aid kit related to sea rescue
to sea rescue medications. medications
2.5.6.4 ☐ 12 automatic inflatable life jackets
(4) Automatic Inflatable Life Jackets. Each FIB shall ☐ Comply SOLAS standard
be equipped with twelve (12) automatic inflatable life jackets
☐ Complete with pressurized air bottle
suitable for sea operations. Inflatable life jackets shall meet
the SOLAS standards complete with pressurized air bottle, ☐ Whistle
whistle, emergency light and others deemed necessary to ☐ Emergency light
serve its purpose. ☐ Others:

2.5.6.5 (5) Tactical Helmets. Each FIB shall be equipped with ☐ 12 light tactical helmets
twelve (12) light weight helmets suitable for sea operations. ☐ Lightweight

13
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.7 g. Miscellaneous Equipment. Other miscellaneous
equipment to be supplied shall consist of but not limited to the
following:
2.5.7.1 (1) Fender. The FIB shall have minimum two (2) rubber ☐ ≥ 2 rubber fenders
fenders for the purpose of alongside to protect the hull.

2.5.7.2 (2) Anchor and Lines. Each FIB shall have one (1) unit ☐ 1 unit 8 kg folding anchor
8 kg folding anchor complete with 50 meters mooring lines, ☐ 50 meters mooring lines, 13 mm dia.
13 mm diameter. The anchor is deployed by manual ☐ Anchor is deployed by manual operation
operation.

2.5.7.3 (3) Boat Hook. Each FIB shall be equipped with two (2) ☐ Two (2) units telescopic hook
units telescopic hook. The item shall be stowed within and
easily accessible when needed.
2.5.7.4 (4) Gauges. Each FIB shall be equipped with the ☐ Gauges to monitor engine performance
necessary gauges to monitor engine performance, ☐ Gauges to monitor speedometer
speedometer, fuel quantity indicator, oil quantity indicator, ☐ Gauges to monitor fuel quantity indicator
temperature, battery voltmeter, hour meter, tilt meter and
☐ Gauges to monitor temperature
others deemed necessary for the safe operations of the
FIB. ☐ Gauges to monitor, battery voltmeter
☐ Gauges to monitor hour meter
☐ Gauges to monitor tilt meter
☐ Others gauges deemed necessary for the
safe operations of the FIB
☐ Fuel level indicator at the tank
☐ Fuel level indicator at the control console
2.5.7.5 (5) Non-Slip. The deck and gun whale shall be ☐ The deck covered with non-slip material.
covered with non-slip material. Grab rails and life lines all ☐ Gun whale covered with non-slip
around boat. material.
☐ Grab rails all around boat.
☐ Life lines all around boat.

14
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.7.6 (6) GPMG Mounting and Shield Plate. Each FIB shall ☐ GPMG (7.62mm) mounts at foredeck
be fitted with General Purpose Machine Gun (7.62mm) ☐ Bullet Proof Plate Level 2 And Above
mounts at foredeck with bullet proof plate Standard NATO ☐ Complete with Ammo Casing
Agreement (STANAG) minimum of level 2 and above
☐ Plate easily removed for storage
complete with ammo casing. The plate shall be easily
removed for storage.
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.5.7.7 ☐ Compartment for battery
(7) Compartment. Each FIB shall have compartment
☐ Compartment for anchor chain
for battery, anchor chain and tools.
☐ Compartment for tools
2.5.7.8 (8) Helm Console. The helm console shall be mounted ☐ Helm console mounted forward FIB
forward in the FIB and shall be made from fibreglass or ☐ Made from fibreglass or better material
better material.
2.5.7.9 (9) Water Proof Stowage. The FIB shall be fitted with ☐ waterproof stowage with safety clips
a waterproof stowage with safety clips for the storage of first
aid kit, flares, torch, small arms and any other items that
needed to be kept dry.
2.5.7.1 (10) Slings. The FIB shall come with slings complete with ☐ Lifting sling
0 it accessories in order to lift the boat in case of emergency
or to transport the boat by ship or shore.
2.6 Associated Equipment. Each FIB should be provided with ☐ Provided with galvanized steel trailer
galvanized steel trailer for land transportation that can be towed by ☐ Can be towed by suitable vehicle
suitable vehicle approved by department of transport with capacity of approved by department of transport
at least 5 tonnes. ☐ Trailer capacity ≥ 5 tonnes
2.7 Technical Publication. The manufacturer or supplier shall supply
the required number of Operating and Maintenance Manual,
Maintenance Allocation Chart and Parts Catalogue covering System
as confirmed at time of contract. The following publications in English
and Bahasa Malaysia shall be provided by the manufacturer/supplier
in hard copy and soft copy (CD). Such manuals are as follows:

2.7.1 a. Operator’s Operating Manual. The quantity of one ☐ Operator’s operating manual
(1) book shall be provided for each FIB.

15
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.7.2 b. Operator’s Maintenance Manual. The quantity of ☐ Operator’s maintenance manual
one (1) book shall be provided for each FIB.
2.7.3 c. Technical and Repair Manual. The quantity of one ☐ Technical and repair manual
(1) book shall be provided for each FIB.
2.7.4 d. Illustrated Spare Parts Catalogue. The quantity of ☐ Illustrated spare parts catalogue
one (1) book shall be provided for each FIB.

Ser Requirements & Specification PDI’s Checklist


Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
2.8 Standard Malaysia Codification. Shall provide the following
codification details:
2.8.1 a. North Atlantic Treaty Organization (NATO) stock ☐ NATO stock number (if applicable)
number (if applicable).
2.8.2 b. The manufacturer’s part number. ☐ The manufacturer’s part number

CHAPTER 3

3.2.2.3 (3) Any related document certified by the manufacturer ☐ Certified document
of the product.
3.2.2.4 (4) A certified letter by the tenderer for local product. ☐ Certified letter
3.3.2.5 (5) Engineering drawing certified by the manufacturer. ☐ Certified drawing
3.6
3.7 Special Tools. The manufacturer/supplier shall provide the list of ☐ List of special tools for maint and repair
special tools for maintenance and repair and guarantee that special ☐ guarantee that special tools can be
tools can be supplied together with the FIB (if any). supplied together with the FIB

CHAPTER 4
4.3 Complete Equipment Schedule (CES). The manufacturer/supplier ☐ Provided
shall provide the CES for the FIB.

16
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)

CHAPTER 5
5.1 MAINTENANCE
5.2 The supplier shall perform all maintenance required during the ☐ The supplier shall perform all
contract period of the equipment/system inclusive of spares maintenance required during the contract
provision. period of the equipment/system inclusive of
spares provision
5.3 The maintenance of the FIB should be based on the manufacture/ ☐ The maintenance of the fib should be
supplier guidance. based on the manufacture/supplier
guidance
5.4.1 a. To ensure all parts are genuine, updated, new, free of ☐ All parts are genuine
defects, suitable for the purpose and to comply all contract ☐ All parts updated
terms. ☐ All parts are new
☐ All parts are free of defects
☐ All parts are suitable
☐ All parts are complying all contract terms
5.4.2 b. To provide Planned Maintenance Schedule (PMS) including ☐ PMS provided
Preventive Maintenance, Corrective Maintenance and as When ☐ Preventive maintenance
Required Only. All maintenance performed shall be documented ☐ Corrective maintenance Schedule
and presented to the user periodically.
☐ All maintenance performed documented
and presented to the user periodically.
5.4.3 c. To ensure continuous service and does not interfere with ☐ Continuous service
Armed Forces readiness at all times.
17
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
5.4.4 d. To ensure maintenance level of all the FIB always exceed ☐ Maintenance level of all the FIB always
the minimum requirements specified in the contract. exceed the minimum requirements specified
in the contract
5.4.5 e. To ensure all FIB and OBMs supplied according to ☐ All FIB and OBM supplied according to
specification. specification
5.4.6 f. To provide a replacement FIB and OBMs if the availability ☐ A replacement boat
and readiness of the FIB does not meet contract requirement.
5.4.7 ☐ Skilled local workers to carry out
g. To provide skilled local workers to carry out maintenance and
maintenance and repair of boats and OBMs
repair of boats and OBMs along with the recovery in the event of
along with the recovery in the event of an
an emergency.
emergency
5.4.8 h. Boats must be built in Malaysia by boat manufacturer ☐ Boat manufacturer company registered
company registered with Ministry of Finance with ministry of finance

CHAPTER 6
6.1 INTEGRATED LOGISTIC SUPPORT (ILS)
6.2 This part covers the ILS requirements that are vital to ensure the ☐ Able to provide a direction on the ILS
effective and efficient support of the FIB throughout its programmed programmed support analysis as required
life cycle. The manufacturer/supplier shall be able to provide a by the user
direction on the ILS programmed support analysis as required by
the user
CHAPTER 7
7.1 DELIVERY
7.2 ☐ Deliver the FIB to pre-determined
The supplier shall deliver the FIB to pre-determined location by
user. location by user

7.3 ☐ Provide all necessary arrangement for


The supplier should provide all necessary arrangement for
government representatives or Subject Matter Expert (SME) to government representatives or Subject
Matter Expert (SME) to conduct the delivery
conduct the delivery inspection
inspection
CHAPTER 8
8.1 TRAINING
8.2 Continuous Training as and when required for boat crew will be
provided by the manufacturer/supplier. Training shall encompass:

18
TERHAD
TERHAD
Ser Requirements & Specification PDI’s Checklist
Compliance Remarks
Yes No
(a) (b) (c) (f) (g)
8.2.1 a. Boat handling. ☐ Boat handling
8.2.3 b. Basic trouble shooting. ☐ Basic trouble shooting
8.2.4 a. Navigation and communication equipment. ☐ Navigation and comm equipment

19