SCHEDULE 2

PROJECT NAME : GIEM ACADEMY - RENOVATION & ID WORKS @ECO SKY, JALAN KUCHING
PROJECT TIMELINE 2023 - 2024
UPDATED: 10 NOVEMBER 2023

Month NOVEMBER'23 DECEMBER'23 JANUARY FEBRUARY MAC

Required:
Item Description of Works Date 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No of Days

No of Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 CRMS 25 26 27 28 29 NY 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 T 50 51 52 53 54 KL 55 56 57 58 59 60 61 CNY 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 - PRELIMINARIES

1.01 Building & Work Permits 5

1.02 Work Mobilization - Equipments and 5


Materials

2 - CIVIL WORKS Phase 1

2.01 Patching all cracks 2

2.02 Conceal GI/PVC conduit pipe-coway 2

3 - ELECTRICAL WORKS Phase 1

3.01 Incomming Power Supply, Internet & 5


Telephone

3.02 DB Board 11

3.03 Installation & Fitting Metal Cable Tray & 11


Accessories

3.04 Wiring for Lighting, Elc Accessories, 11


Emgcy Light & A/C (Conceal)

Lay up Cat 6 data cable, HDMI and other


3.05 accessories for CCTV, Access Door, 11
Security System, PABX Phone, ICT &
other networking

3.06 Wiring for PA System 5

4 - CIVIL & FLOOR FINISHES Phase 2

4.01 To lift up floor 5

4.02 Providing Counter Top - Double Wash 10


Basin

4.03 Construct a counter 8

4.04 To install Porcelain tile, Matte Cement 12


Looks

4.05 To install Porcelain tile, Mattee Wood 5


Grain

5 - WALL PARTITION

5.01 Gypsum Board (10 mm thick) to wall/ 10


partition

5.02 To install tempered glass partition and 10


glass door

5.03 Folding Doors Partition Acoustic Interior 6


Room Dividers'

6 - CEILING FINISHES

6.01 To install Plaster Ceiling Board 10

6.02 Toilet maintenance and repair of Plaster 5


Ceiling Board

7 - PAINTING

7.01 Painting the walls 5

7.02 Painting the exposed ceiling slab 5

7.03 Painting the toilet walls, doors & door 5


frames

7.04 Installation of decorative panel with 3


Brick Veneer Collection

7.05 Installation of Powder Wooded Coated 3


Fluted Wall Panel (PWC)

8 - CUSTOM FURNITURE

8.01 Installation Main Cabinet - Office 8 Pax 2

8.02 Installation Counter Rack 2

8.03 Installation Custom Platform 7

8.04 Installation Custom Bench 5


Month NOVEMBER'23 DECEMBER'23 JANUARY FEBRUARY MAC

Required:
Item Description of Works Date 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No of Days

No of Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 CRMS 25 26 27 28 29 NY 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 T 50 51 52 53 54 KL 55 56 57 58 59 60 61 CNY 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

9 - ELECTRICAL WORKS Phase 2

9.01 Installation & Fitting Lighting, Elc 8


Accessories, Emgcy Light & A/C

9.02 Installation of CCTV 8

9.03 Installation of Access Control System 8

9.04 Installation & Fitting Network 6

9.05 Installation & Fitting for PABX Telephone 6

9.06 Installation & Fitting PA System 6

9.07 Applying texture paint (cement effect) 8

10 - FINISHING WORK

10.01 Installation of double layer Acrylic Poster 3


Frame

10.02 Installation of Expanded Metal Mesh and 3


Steel Frame

10.03 Installation of Decorative Frosted Privacy 3


Film

10.04 Installation of Reflective UV Film 3

10.05 Installation of CUSTOM 3D LOGO SIGNS 3

10.06 Installation of 3D FONT LOGO 3

10.07 Installation of 3D FONT LOGO 3

10.08 Installation of Roller Blinds & Window 3


Blinds

10.09 Installation of Bathroom Mirror 3

10.10 Installation of Wall Mirror 3

10.11 Installation of Cabinet Mirror 3

10.12 Custome Installation for Bronze Stainless 3


Steel Plate Mirror Finish

10.13 To supply and install Glass Whiteboard 3

10.14 To supply and install Raintree Wood Slab 3


Counter Top

11 - OTHERS

11.01 To supply and install Custom Tables 5

11.02 To supply and install Other Furnitures 5

11.03 To install ICT Equipments 5

11.04 Decoration 5
SCHEDULE 2
PROJECT NAME : GIEM ACADEMY - RENOVATION & ID WORKS @ECO SKY, JALAN KUCHING
PROJECT TIMELINE 2023 - 2024
UPDATED: 21 DECEMBER 2023

Month NOVEMBER'23 DECEMBER'23 JANUARY FEBRUARY MAC

Required:
Item Description of Works Date 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No of Days

No of Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 CRMS 25 26 27 28 29 NY 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 T 50 51 52 53 54 KL 55 56 57 58 59 60 61 CNY 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 - PRELIMINARIES

1.01 Building & Work Permits 5

1.02 Work Mobilization - Equipments and 5


Materials

1.03 Site Preparation - Clearing & layout 5


Preparation

2 - CIVIL WORKS Phase 1

2.01 Patching all cracks 2

2.02 Conceal GI/PVC conduit pipe-coway 2

2.03 VO - Toilet Maintenance (Water leaking) 2

3 - ELECTRICAL WORKS Phase 1

3.01 Incomming Power Supply, Internet & 5


Telephone

3.02 DB Board 11

3.03 Installation & Fitting Metal Cable Tray & 11


Accessories

3.04 Wiring for Lighting, Elc Accessories, 11


Emgcy Light & A/C (Conceal)

Lay up Cat 6 data cable, HDMI and other


3.05 accessories for CCTV, Access Door, 11
Security System, PABX Phone, ICT &
other networking

3.06 Wiring for PA System 5

4 - CIVIL & FLOOR FINISHES Phase 2

4.01 To lift up floor 5

4.02 Providing Counter Top - Double Wash 10


Basin

4.03 Construct a counter 8

4.04 To install Porcelain tile, Matte Cement 12


Looks

4.05 To install Porcelain tile, Mattee Wood 5


Grain

5 - WALL PARTITION

5.01 Gypsum Board (10 mm thick) to wall/ 10


partition

5.02 To install tempered glass partition and 10


glass door

5.03 Folding Doors Partition Acoustic Interior 6


Room Dividers'

6 - CEILING FINISHES

6.01 To install Plaster Ceiling Board 10

6.02 Toilet maintenance and repair of Plaster 5


Ceiling Board

7 - PAINTING

7.01 Painting the walls 5

7.02 Painting the exposed ceiling slab 5

7.03 Painting the toilet walls, doors & door 5


frames

7.04 Installation of decorative panel with 3


Brick Veneer Collection

7.05 Installation of Powder Wooded Coated 3


Fluted Wall Panel (PWC)

8 - CUSTOM FURNITURE

8.01 Installation Main Cabinet - Office 8 Pax 2

8.02 Installation Counter Rack 2

8.03 Installation Custom Platform 7

8.04 Installation Custom Bench 5


Month NOVEMBER'23 DECEMBER'23 JANUARY FEBRUARY MAC

Required:
Item Description of Works Date 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No of Days

No of Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 CRMS 25 26 27 28 29 NY 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 T 50 51 52 53 54 KL 55 56 57 58 59 60 61 CNY 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

9 - ELECTRICAL WORKS Phase 2

9.01 Installation & Fitting Lighting, Elc 8


Accessories, Emgcy Light & A/C

9.02 Installation of CCTV 8

9.03 Installation of Access Control System 8

9.04 Installation & Fitting Network 6

9.05 Installation & Fitting for PABX Telephone 6

9.06 Installation & Fitting PA System 6

9.07 Applying texture paint (cement effect) 8

10 - FINISHING WORK

10.01 Installation of double layer Acrylic Poster 3


Frame

10.02 Installation of Expanded Metal Mesh and 3


Steel Frame

10.03 Installation of Decorative Frosted Privacy 3


Film

10.04 Installation of Reflective UV Film 3

10.05 Installation of CUSTOM 3D LOGO SIGNS 3

10.06 Installation of 3D FONT LOGO 3

10.07 Installation of 3D FONT LOGO 3

10.08 Installation of Roller Blinds & Window 3


Blinds

10.09 Installation of Bathroom Mirror 3

10.10 Installation of Wall Mirror 3

10.11 Installation of Cabinet Mirror 3

10.12 Custome Installation for Bronze Stainless 3


Steel Plate Mirror Finish

10.13 To supply and install Glass Whiteboard 3

10.14 To supply and install Raintree Wood Slab 3


Counter Top

11 - OTHERS

11.01 To supply and install Custom Tables 5

11.02 To supply and install Other Furnitures 5

11.03 To install ICT Equipments 5

11.04 Decoration 5

Status Indicator Progress Indicator

Pre-execution Original Gantt Chart

In-progress Task Completed

100% Completed Planning for Next Phase