Awal impounding 22-Sep-21

DATA OPERASI BENDUNGAN GONGSENG


PENGISIAN AWAL
1 Hari ke - 69 Senin 29 November 2021 12:00:00 WIB BOBOT
2 Volume Total EL.+ 93.00 22,346,000.00 m3
Volume Efektif 14,413,000.00 m3
3 MAW EL. + 80.90 m
4 Volume saat ini 2,321,933.05 m3 16.11 %
Luas Genangan 65.61 Ha 22.86 %
Sebelumnya hari ke- 69 Senin 29 November 2021 8:00:00 wib
5 MAW EL. + 80.88 m3
Volume 2,309,806.62 m3
Kenaikan Elevasi 0.02 m

6 Q-Outflow
Drop Inlet Elv +86.05 0.00 m3/det

7 Penguapan 0.00 mm/hari 0.00 m3/det


8 Q-Inflow 0.84 m3/det 4

Dam Instruments
9 Rembesan di waduk (mm)
V-notch 1 (kanan) 0.05 liter/det
V-notch 2 (kiri) 0.47 liter/det
V-notch 3 (pondasi) 0.85 liter/det
TOTAL 1.37 liter/det
14 Curah Hujan Sta. Gongseng 0.00 mm

15 Temperature max 40.60 °C


16 Temperature min 34.80 °C
17 Wind Run 3.14 m/s
18 Barrometer 196.00 mb

Keterangan: v-notch dilaporkan pada jam 12:00 wib