RSG-CN-FRM-0004
AMAALA
General Information
Program Name Wellness Core Project Code 1TB03300 Project Name TB-Wellness Core Wide
Contract ref. 300C04 Package Mechanical
1TB03300-300C04-
WIR No. Version 2 Date 10-August-23
STC-WIR-ME-0014
Required Date Required Time of
11-August-23 11:00 AM
of Inspection Inspection
Inspection Details
Works to be Inspected Installation of HDPE, SDR11 Pipe for Irrigation Network
QA/QC Engineer
Comments
Recommendation
Ready for Supervision Consultant’s/Client Inspection and/or Testing: ☒ Yes ☐ No
RSG-CN-FRM-0004
Rev. 00, 16 Nov 2022 Page 1 of 3
Work Inspection Request
RSG-CN-FRM-0004
Supervision Consultant/Client
Inspection Comments
REF ER T O T H E C OMMENT S
Approval
☐ Rejected
1 6 .0 8 .2 3
EMERSON
Inspector Name Signature Date
Attachments
1. Red Line Markup Drawings (for accepted or accepted with comments inspections only)
2. Photos (For Revise and resubmit or Rejected inspections only, showing incomplete or incorrect works)
RSG-CN-FRM-0004
Rev. 00, 16 Nov 2022 Page 2 of 3
Work Inspection Request
RSG-CN-FRM-0004
Annexure
Contractors Clearances (No Objection)
Package 01 Date
Package 02 Date
Package 03 Date
Package 04 Date
Package 05 Date
Package 06 Date
Package 07 Date
Package 08 Date
Package 09 Date
Package 10 Date
RSG-CN-FRM-0004
Rev. 00, 16 Nov 2022 Page 3 of 3
THE CONTRACTOR THE OWNER THE ENGINEER
Subcontractor: Element:
Item
No. Description YES NO NA Remarks
3.0 Ensure that the pipe and fittings are clean. Yes
17
AMAALA WELLNESS CORE SECONDARY INFRASTRUCTURE
QA/QC Department
IRRIGATION NETWORK
1.1 Approval of Shop Drawing 1TB03300-008D02-DSA-SPC-ME-0002 Prior to work start Approved SDR R RH All documents must be approved before commencement of activity
1.2 Approval of Material Submittal, Test Report 1TB03300-008D02-DSA-SPC-ME-0002 Prior to work start MAR R RH All documents must be approved before commencement of activity
1.3 Method Statement & Risk Assessment 1TB03300-008D02-DSA-SPC-ME-0002 Prior to work start MS R RH
2.2 HDPE, PN16 Fittings Receiving Inspection 1TB03300-008D02-DSA-SPC-ME-0002 See Remarks 1TB03300-300C04-STC-MIR-ME- H/ R/I W / A / RH 1st delivery lot, Check in detail and after randomly witness
2.3 Duct, uPVC For Road Crossing 1TB03300-008D02-DSA-SPC-ME-0002 See Remarks 1TB03300-300C04-STC-MIR-ME- H/ R/I W / A / RH Contractor QCI to perform weekly Inspection
2.4 Control Cable 1TB03300-008D02-DSA-SPC-ME-0002 See Remarks 1TB03300-300C04-STC-MIR-ME- H/ R/I W / A / RH 1st delivery lot, Check in detail and after randomly witness
3.0 Installation
3.1 Excavation, Trench & Sand Bedding Inspection 1TB03300-008D02-DSA-SPC-ME-0002 Each Activity 1TB03300-300C04-STC-WIR-ME- H/I W/S Section 221116, Earth work
3.2 HDPE, PN16 (DIN 8074) Irrigation pipes Installation IFC & Shop Drawings Every Completed Portion 1TB03300-300C04-STC-WIR-ME- H/I W/A/S
3.3 Joint / Welding Specs, IFC & Shop Drawings Every Completed Portion 1TB03300-300C04-STC-WIR-ME- H/I W/A/S
3.4 Thrust Blocks 1TB03300-008D02-DSA-SPC-ME-0002 Every Completed Portion 1TB03300-300C04-STC-WIR-ME- H/I W/A/S
3.5 Cable Conduit for Control Cable 1TB03300-008D02-DSA-SPC-ME-0002 Every Completed Portion 1TB03300-300C04-STC-WIR-ME- H/I W/A Separate inspection for control cable installation
Remarks :
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
A Approval
01231245ÿ4789ÿ
ÿ $55 9$
%&'(ÿ,@(ÿ7&;
"ÿÿÿ@ÿÿÿA48818345"14 ÿ-ÿ&&6ÿ(&ÿ78 $ÿAÿ(&'(ÿ(ÿÿ'(6ÿ&ÿ7
BCDEÿGHIJEKDGGILÿMIEÿINGOKIGDPILLQÿRSJSHIGSTU
71111 12
01231245ÿ4789ÿ
ÿÿÿÿ!
ÿ"
71111 212
01231245ÿ78977ÿ
ÿ #33 9#
$ %&'ÿ+>'ÿ?%8
ÿÿ ÿ>ÿ ÿÿB488/8323 /2 ÿ4ÿ ÿ3ÿ5ÿ"%6ÿ78ÿ"Bÿ' %&'ÿ'ÿ
&'@ÿ%ÿ9
9117 11 712
01231245ÿ78977ÿ
!ÿ#$%&!'##%(ÿ)%!ÿ%*#+'%#,%((-ÿ./&/$%#/01
ÿ #33 5#
$ %&'ÿ+;'ÿ<%7
ÿÿ ÿ;ÿ ÿÿ>488/8323 /2 ÿ4ÿ %ÿ3ÿ3>ÿ' %&'ÿ'ÿÿ&'=ÿ%ÿ9
?@ABÿDEFGBHADDFIÿJFBÿFKDLHFDAMFIINÿOPGPEFDPQR
SOLENOID VALVE-DRIP
IRRIGATION CONTROLLER
PULL BOX
CLIENT
ISOLATION VALVE
A
ISOLATION VALVE & ELECTRICALLY
OPERATED BUTTERFLY VALVE WITH
ACTUATOR
DV56 B
2" 4.11
DV55 B
2" 3.90
ELECTROMAGNETIC FLOW METER
DV54 B
MOISTURE SENSOR
2" 2.96
DV58 B
2" 5.17
THRUST BLOCK
VALVE NO. CONTROLLER No.
Sv1 A
2" 4.5
SIZE IN INCHES FLOW IN LPS
DV60 B
2" 3.56
LEAD CONSULTANT
IRRIGATION DUCTS SCHEDULE
DV74 B
2" 5.95
1.21
B
B
1.72
DV61 B
DV63
DV52
2"
2" 2.26
2"
1" 3"
DV62 B
2" 2.10
1.5" 3"
2" 4"
4.12
B
DV73
STAMP SIGNATURE
2"
4" 8"
B
9
1.8
51
DV
2"
6" 12"
B
1
2.4
DV50
2"
IRRIGATION WATER
INDICATIVE LOCATION OF RETAINING WALL AOR
TANK
2.09
B
DV64
2"
2.08
9 B
DV4
2"
1.51
NOTES
B
DV53
2"
DV 75 B
2" 5.80
2.08
76 5.
DV 2"
B
2"
2"
91
DV
DV69 B
2" 3.19
DV68 B
DV70 B
2" 2.36
SPECIFICATIONS
2" 1.63
DV80
C
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SIGNATURE / DESIGN ARCHITECT
2.08
2" 3.57
2"
93
DV
SHOP DRAWINGS FOR ALL ELEMENTS OF THE
A
Heah & Co
1 72
5.
DV8 DV67 B
2"
DV 77 C
2" 2.84
2" 4.2
B
DV94
LANDSCAPE CONSULTANT
5.
6. CONTRACTOR TO PRODUCE A REPRESENTATIVE
DV785a C
2" 4.34 SAMPLE FOR THE ENGINEER'S APPROVAL FOR EACH
DV48 B
2" 4.47 ELEMENT, TO WHICH THE WORKS ON SITE MUST
CONFORM
A
DV82a C
7. THRESHOLDS TO CHANGES IN LEVEL, BUILDINGS,
ETC. TO BE FLUSH WITH NOMINAL FALLS AWAY
2" 3.63
31
4.
C
2"
2
C
DV8
DV86
2" 6.75
CONSTRUCTION DOCUMENTS
DV85 A
2" 4.2
A
6.94 2"
DV94
C
DV83
3.20
A
ENGINEER. VALVE BOXES / MANHOLES IN HARD
DV33
2"
DV35 A
DV36
2"
A
2.31
11. SINGLE PHASE POWER SUPPLY TO BE PROVIDED
AT EACH CONTROLLER LOCATION.
N
A
DV25
2"
A
2.93
N Q
N1
2023.03.30
N0
2023.01.23 VP ISSUED FOR CONSTRUCTION TLA
A
0
4.0
32
DV
2"
GENERAL NOTES
DV31
A
1. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE REFERRED
2" 6.06
TO THE RELEVANT CONSULTANT DRAWINGS, SPECIFICATIONS AND DETAILS.
2. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE REGULATIONS AND
LOCAL AUTHORITY REQUIREMENTS
3. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL DIMENSIONS AND
DV37 A
2" 5.03
LEVELS ON THE BUILDING SITE BEFORE COMMENCING WITH ANY WORK
DV30
A
DV
89
3"
A
7.61
2" 4.09
4. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS ARE TO BE
DV38 A
2" 6.85
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY WORK
BEING PUT IN HAND
DV88
A
2" 4.43
A
5. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OF
42
DV24 A
2" 4.60
A
6
DV2
5.68
2"
DV
29
2" A
8.3
7
DV10
A
2"
4.60
4.16
A
DV90
2"
DV39 A
A
DV27 2" 5.03
DV23 A DV40 A
2" 5.05
DV28 2" 4.26 2" 2.72
A
2" 6.59
DV41 A
2" 3.89
DV22 A
2" 4.26
DV43 A
2" 1.91
DV44 A
2" 2.36
DV14 A
2" 4.74
OR
DV19 A
DV9 DV1 A
2" 4.24
RR R
A
2" 2" 4.09
5.43 DV11 DV21 A
A
ID
CO IDO
2" 2" 4.72
4.69
DV20 A
2" 3.21
IC RR
DV13 A
2" 3.85 DV2 A
RV CO
2" 3.48
E
SE EE
TR
DV17 A
DV12 A
DV16 A
2" 4.97
DV18 A
DV3 A
2" 4.41 REV. DATE REASON FOR ISSUE CHK
2" 5.82 2" 5.60
2" 3.36 DV4 A
2" 6.16
DV5
2"
A
4.18
DV3A A
2" 3.68
DV45 A
2" 3.37 PROJECT
Z:\1202-THE WELLNESS CORE\M-MISC\2023-06-21_IRRIGATION LAYOUT\IRRIGATION LAYOUT.DWG
DV8 A
DV6 A
DV15 A
3" 6.74
DV7 A
2" 4.64
BUILDING NAME
MASTER PLAN
BUILDING NUMBER
00
PLOT NUMBER
TB-09
DRAWING TITLE
1.80 m
1.20 m
0.17 m Ø80 CWS Ø80 CHWR
0.32 m 0.22 m WARNING TAPE
0.46 m
0.32 m WARNING TAPE CLIENT
1.20 m
1.20 m
1.20 m
1.80 m
1.80 m
1.80 m
0.62 m 0.26 m 0.31 m 0.21 m
2.01 m
0.60 m 1.16 m 0.18 m 0.74 m
1.44 m
0.45 m 0.70 m
2.87 m
1.28 m 0.73 m 0.38 m
0.55 m 0.45 m 0.96 m IL: -8.99 m IL: -7.82 m IL: -7.98 m
0.81 m IL: 3.65 m IL: -7.83 m
1.98 m
MEP_SHEET-3_ACCESSWAY-P_SEC A-A MEP_SHEET-4_ACCESSWAY-P_SEC B-B MEP_SHEET-4_ACCESSWAY-P_SEC C-C MEP_SHEET-4_ACCESSWAY-P_SEC D-D LEAD CONSULTANT
1 1 : 50 2 1 : 50 4 5 1 : 50
1 : 50
STAMP SIGNATURE
AOR
Ø160 PWP
Ø200 FM NOTE: UNDER THE ROAD ALL THE MEP SERVICES RUNNING BETWEEN 1.2M TO 1.8M
Ø160 PWP Ø140 SPR
Ø65 CHWS
Ø200 FM Ø160 PWP Ø65 CWS
Ø65 CHWS Ø65 CHWR Consolidated Consultants for Engineering and Environment
Ø200 FM
Ø140 SPR Ø140 SPR STAMP SIGNATURE
Ø65 CWS Ø65 CHWR
Ø65 CWS
Ø65 CHWS WARNING TAPE
Ø65 CHWR
1.20 m
WARNING TAPE 0.18 m SIGNATURE/DESIGN ARCHITECT
1.80 m
0.37 m 0.25 m 0.33 m
1.20 m
1.80 m
0.19 m
1.20 m
0.23 m 0.25 m
0.25 m 0.45 m 0.26 m 0.36 m 0.68 m 1.18 m 0.63 m
Heah & Co
1.80 m
2.03 m
WARNING TAPE
Ø110 IRR IL: -8.94 m
0.56 m 1.30 m 0.70 m MAIN CONTRACTOR
IL: -9.11 m
1.94 m
FD
FD
FD
FD
FD
FD
FD
FD
FD
F
D
DF
FH
C
C
FH
FD
C
FH
C
FH
C
FH
C
FH
C
FH
FD
FD
B
A E
W
3 R
E
WR O
D
O
H
S
4
2
1
5
0
. 7
5
1
0
.2
1
5
3
0
74
.
-7
8
1
0
5
d
UP
Od
C
1 1
0
5 U
D
-.R
Y
A
T
2
3
4
0
5
7
1
.
WC
IR R
2
1
0
5
d
-.
O
3 D
3
4
2
1
5
6
0
7
6
1
0
.
O
C
SPR SPRINKLER PIPE
4
2
1
5
8
0
7
8
1
0
.
H
N
TC
K
IE
1
5
0
2 7 4
.3
3
1
5
d
-.
D
3 R
A
-2
4
1
5
d
L Md -8
9
1
0
5
U
Y
T
4
.
O
C
4
3
5
0
1
.2 7
2
1
5
9
0
7
9
1
0
.
G
O
N
R
IV
0
1
-9
1
0
5
d.
FD
R
C
N
A
E
T
4
0
1
73
2
1
-3
1
5
d
F
=
0
L
-0
2
1
5
d
.
.
-9
1
0
5
d.
.
IR R
-8
6
1
0
5
d.
3 C
O
1 D
W
N
U
S
A
E M C O
6
0
1
73
4
.2
5
-. 75
2
0
14
2
1
.4
3
0
5
7
12
.
8
1
5
d
7
1
5
d
-.
4 M
-2
1
0
5
d
-3
9
1
0
5
d
-2
1
0
5
d
.
.
O
R
H
B
A
O
S R
T
5
12
.3
5
0
1
7
PART PLAN - 4
MA G
D
1 R
-6
2
1
0
5
d
.2
5
4
0
1
7 3
-2
6
1
5
d
U
Y
A
T
.
.
O
C
.5
0
8
7
12
3
4
4 R d-2
1
0
5.
-2
3
1
5
d.
O
C O
IR
3 D
-2
4
1
5
d
2
5
0
1
7
7
1
.
.
FD
UP
FD
ZONE - 03
FD
PART PLAN - 3
1
2 1
PART PLAN - 5
2
1
WP WASTE PIPE
Q
Ø200 CHWR PWP PUMPED WASTE PIPE
Ø200 SPR GENERAL NOTES
1. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BEREFERRED
Ø160 PWP Ø200 CHWS Ø280 FM TO THE RELEVANT CONSULTANT DRAWINGS, SPECIFICATIONS AND DETAILS.
Ø200 FM Ø160 PWP SP SOIL PIPE 2. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE REGULATIONS AND
Ø200 CWS LOCAL AUTHORITY REQUIREMENTS
Ø140 SPR Ø200 FM 3. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL DIMENSIONS AND
Ø50 CWS Ø100 SPR LPG LIQUEFIED PETROLEUM GAS LEVELS ON THE BUILDING SITE BEFORE COMMENCING WITH ANY WORK
Ø65 CHWS 4. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS ARE TO BE
1.20 m
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY WORK
Ø50 CWS WARNING TAPE
BEING PUT IN HAND
1.80 m
Ø65 CHWR IRR IRRIGATION PIPE
5. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OF
DRAWINGS WILL NOT BE PERMITTED
6. ALL THE LEVELS MEASURED ARE IN METER.
7. ALL THE LEVELS MEASURED FROM BENCHMARK LEVEL (+12.644M)
03
0.32 m 0.32 m 0.22 m 0.36 m
1.20 m
1.80 m
0.28 m
1.80 m
TB-09
WARNING TAPE
1.80 m
0.79 m
0.68 m WARNING TAPE DRAWING TITLE
1.04 m 0.29 m 0.81 m 1.34 m HOUSE CHAMBER (HC)
0.60 m
0.20 m IL: 9.16 m 0.64 m 0.39 m 1.39 m 0.27 m 0.27 m 0.50 m
0.39 m IL: 9.17 m AMAALA WELLNESS CORE
IL: 9.12 m FIRE CHAMBER (FLC)
0.39 m IL: 9.01 m ACCESSWAY_P & O
IL: -5.68 m
R OED IG ER
VACUUM CHAMBER
IL: -1.34 m
IL: -5.77 m
IL: -5.58 m IL: -1.51 m IL: -1.54 m PRESSURE BREAKING CHAMBER MODEL FILE REFERENCE
IL: -1.50 m 1TB03300-300C04-STC-00-ZZ-MOD-ME-50001
IL: -1.33 m FIC-MANHOLE
DRAWN BY CHECKED BY APPROVED BY
VACUUM STATION MR MA PD
MEP_SHEET-4_ACCESSWAY-O_SEC K-K MEP_SHEET-4_ACCESSWAY-O_SEC L-L MEP_SHEET-4_ACCESSWAY-O_SEC M-M SEWER MANHOLE PROJECT NO. ISSUE DATE SCALE @ A0
11 1 : 50 13 1 : 50 12 1 : 25 BACKDROP MANHOLE
1TB03300 25-06-2023 As indicated