T&C For Split System-1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Airconditioning System Testing and Commissioning Record

Project name: Date:


Project Engineer/Owner:
Location /Floor/Zone
Project Engineer/Installer:
Brand Name:

Project Detail
Types Of Indoor units
No. of indoor unit: ____ Wallmounted Floor stand Low Static Duct
No. of outdoor unit: ____ Ceiling Cssette Floor Ceiling High Static Duct
Power System:

Notes:

T&C Checklists
Room Name/No. Pressure Ampere Drain Condensation Remarks
‐1
‐2
‐3
‐4
‐5
‐6
‐7
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15
Note : Running time must be within 30mins to 60 mins.

Installation Team Projective representative

You might also like