Excavator Commissioning Report

1、General situation:
Manufacture Manufacture Commissioning
Equipment Type
Code Date Date
Customer
Worksite
contactor Tel Engineer Tel

2 Check parameter
Engine
Engine speed
curb idling
Engine speed normal Snormal(S-mode) Lnormal(L-mode) normal(B-mode) normal(H-mode)
720±50rpm 1950±50rpm 1800±50rpm 1650±50rpm 2100±50rpm

Combination
bucket bucket rod Reinforced boom
Working equip performance
ok□ not□ ok□ not□ ok□ not□ ok□ not□
Reverse in Forward in Reverse in
Travelling Forward in low speed
low speed high speed high speed
ok□ not□ ok□ not□ ok□ not□ ok□ not□
Bottom roof joint Rotor joint Door joint Top cover joint Balancer joint
Fastening belt □ □ □ □ □ □ □ □ □ □
tight loose tight loose tight loose tight loose tight loose

Hydraulic Hydraulic oil Joint leakage


system ok□ not□ Yes □ No □
Electrical Indication
Lighting system Acoustics equipment A/C
Electrical control system instrument
system ok□ not□ ok□ not□ ok□ not□ ok□ not□ ok□ not□

3 result

Customer Advise: Supplier representation Advise:

Signature & Stamp: Signature:

Date : Date:

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

Rotary Drilling Rig Commissioning Report

Manufacture
area Customer
Code
Equipment Manufacture
Name Date
Equipment boot-strap
Type Machine runtime Customer
working site information Commissioning Date information Contactor

Geological
situation of
Tel
construction
site
engine rev. at
engine rev. of each gear (rpm)
idle speed
normal value 1 2 3 4 5 6 7 8 9 10
950±50rpm
N Reasons of disqualification
Inspection Items result
O
1 Coating and coverings of upper/under-carriage working Qualified □
device unqualified □
2 Hydraulic system hose arrangement & surface texture Qualified □
unqualified □
3 Bolt-on quality of overall vehicle & working device Qualified □
unqualified □
4 Surface texture of main/auxiliary winch wire cable Qualified □
unqualified □
5 Connecting performance of hoses Qualified □
unqualified □
6 Oil volume of reducers Qualified □
unqualified □
7 Drill pipe/following skeleton/ elevator inspection Qualified □
unqualified □
8 Inspection of electrical system Qualified □
unqualified □
9 Adjustment of engine Qualified □
unqualified □
10 Inspection of system pressure Qualified □
unqualified □
11 Adjustment of upper/under-carriage operation Qualified □
unqualified □

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers
12 Adjustment of running mechanism Qualified □
unqualified □
13 Adjustment of main/auxiliary winch Qualified □
unqualified □
14 Adjustment of unit head Qualified □
unqualified □
15 Mast standing/ reset adjustment Qualified □
unqualified □
16 Adjustment of luffing mechanism Qualified □
unqualified □
17 Others

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

Mobile Pump Commissioning Report

1、 general situation
manufactory Commissioni
model manufacture date
No. ng date

customer company working site

contact
customer Engineer & phone
phone

concrete volume concrete high for


slump
for test grader pump
chassis traveling
engine No.
No. distance

2、running parameter
main system hydraulic Boom system
engine speed
pressure hydraulic pressure
pump time temperature of
agitate pressure
per minute hydraulic oil
boom action:
outrigger action: normal□ abnormal□
normal □ abnormal□

3、operator training record

recruiting person operator signature

training content : □ produce information □ operation skill


□ maintenance

4、result

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Truck Pump Commissioning Report


1、 general situation
model manufactory No. manufacture Commission
Notice: 1, This report is made in duplicate, each party keeps one.
2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

date ing date

customer company Working site

customer contact phone Engineer & phone

Chasiss NO Engine NO Travel Km

2、running parameter
Main system
Temperature of
engine speed hydraulic
hydraulic oil
pressure
pump times per
agitate pressure outrigger action normal□ abnormal□
minute
3、proportion: concrete grader:
concrete
proportion cement water sand stone mixture slump sand percentage
3
kg/m

4、operator training record


recruiting person operator signature

training content : □ produce information □ operation skill □ maintenance

5、result
Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Harbor Machinery Commissioning Report

1、General situation:
Equip Manufacture Commissioning
Equip No
type Date date

Customer company

Customer Tel Engineer Tel

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers
Rated lifing Max.lifing Container Total
load floors standard weight
Engine Driving Gearbox Spreader
type axle type type type

2、Test parameter

Engine System Spreader


Speed Pressure performance

Boom Travelling
Break Traveilling
performance
Performance speed
Parking

3、Training Record of Customer


Trainee No Trainee Signature
□Product knowledge □Operation
TraineeContent
□ maintenance □Safety Regulation

4、Test Result

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Concrete Batching Plant Commissioning Report


1、General Information
manufactory
Equip No
date
manufacture Commissioning
No. date
The Company of Customer

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers
Working
working site
Situation
Customer Service Engineer
Tel Tel

2、Debug Parameter
Mix machine no-load current electric lamp circuit、lamp
main
mix normal value 35A±5A control normal □
mixer
system abnormal □

control measuring
Stable □
system Stable □ unstable □ indicator
Unstable □
function instrument

aggregate discharge power lot discharge


door performance door performance
Flexible □ not flexible □ Flexible □ not flexible □

waiting- for –feed hopper discharge door performance


movement Flexible □ not flexible □
function
spiral conveyor operation belt conveyor operation
Flexible □ flexible □
not flexible □ not flexible □

air compressor operation flexible □ not flexible □

connections of belt support bolt


normal □ abnormal □

connections of structural parts of main stairs bolt


normal □ abnormal □

Other
Are paint and shape of power lot can good or not ?
normal □ abnormal □

Are pipe distribution of air, water circuit and air circuit,


water circuit in order or not ?
aggregate measurement errors powder lot measurement errors
normal □ abnormal □
Flexible □ Flexible □
3、 operator training record not flexible □ not flexible □
recruiting person operator signature
Training additive measurement errors
Context: □ product knowledge □ operation skill □ maintenance:
measure- water weighting errors
ment Flexible □ Flexible □
4、system
inspection result not flexible □ not flexible □
Customer Advise: Supplier representation Advise:
indicator parameter
Notice: 1, This report is made in duplicate, each party keeps one.
Flexible
2, Supplier representation is the engineer or sales, not flexible
□and the report □ must be delivered to SANY.
of supplier
Signature&Stamp: Signature:

Date: Date:
All for customers
Motor Grade Commissioning Report

1、General situation
Equip type Equip No Manufacture Date
Customer company
Working site Working status
Customer Contact Engineer Contact

2、Test parameter
Cooling Motor oil Motor oil Idea Others
hydraulic level level pressure Speed
Engine
Ok □ Ok □ Ok □ Ok □ Ok □
Not □ Not □ Not □ Not □ Not □
Steering Break
Tyre Front tyre Rear tyre Traveling distance
pressure Ok □ Ok □ System Ok □ Ok □
Not □ Not □ Not □ Not □
Deceleration Turbine Hydraulic
Oil light Gauge
balancing box box oil Electrical
level
Ok □ Ok □ Ok □ system Ok □ Ok □
Not □ Not □ Not □ Not □ Not □
Hydraulic Hydraulic oil level Seal performance Others
system Ok □ Abnormality□ Ok □ Abnormality □ Ok □
Working Shovel Blade board Ripper Others
performance Ok □ Ok □ Ok □
Ok □
device Abnormality □ Abnormality □ Abnormality □

3、Training Record of Customer


recruiting person operator signature
Trainee Content □ Product knowledge □ Operation □ Maintenance

4、Test Result

Customer Advise: Supplier representation Advise:

Signature & Stamp: Signature:

Date: Date:

Crane Commissioning Report

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

1、General situation Service Order NO


Manufacture Manufacture Commissioning
Equip type
NO Date Date
Customer company Working site
Customer & Tel Engineer & Tel
Rated lifting Max.lifting Max.lifting Slewing
capacity height speed speed
Front/rear axle Transmission Chassis
Engine type
type type brake

2、Test parameter
Outrigger
Engine speed System pressure
performance
Main hook Slewing
Boom performance Hook performance
Aux.hook performance

3、Training Record of Customer


recruiting person operator signature

Training Content: □ Product knowledge □ Operation □ Maintenance

4、Test Result

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Asphalt Paver Commissioning Report


Notice: 1, This report is made in duplicate, each party keeps one.
2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

1、general information
Equipment Type Date of Dispatch Commissioning Date
Work site Working Siuation
Customer Tel Service Engineer Tel

2、commissioning parameter
idle speed light circuit Electrical indicating
Engine luminaire control system Instrument
Normal Electrical
speed Ok □ Ok □ Ok □
value system
Not □ Not□ Not□
oscillation vibrating spiral scraping Arm hopper
Working
action action action action action
device
Ok □ Ok □ Ok □ Ok □ Ok □ Ok □
action
Not□ Not□ Not□ Not□ Not□ Not □
paving forward speed paving speed paving reverse velocity
Paving Ok □ Ok □ Ok □
Not□ Not□ Not□

cart frame materials screed plate


arm connection
Fix connection distribution box connection
bolt
Ok □ Ok □ Ok □ Ok □
Not□ Not□ Not□ Not□

3、 operator training record


recruiting person operator signature
Training context: □product knowledge □operation skill □maintenance

4、 inspection result

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

date: date :

Trailer Pump Commissioning Report


1、 general situation
manufactory manufacture Commissio
model
No. date ning date
Notice: 1, This report is made in duplicate, each party keeps one.
2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers
customer
working site
company

contact Engineer &


customer
phone phone

pumping distance for pumping distance


horizon for vertical
2、running parameter
actual
maximum
voltage current pumping
pressure
pressure
pumping times without actual agitate temperature of
load per minutes pressure hydraulic oil
3、proportion: concrete grade:
concrete proportion
cement water sand stone mixture slump sand percentage
kg/m3

4、operator training record

recruiting person operator signature

training content : □ produce information □ operation skill □ maintenance

5、result

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Road Roller Commissioning Report


1、General Situation
Manufacture Manufacture Commissioning
Equipment Type
Date Code Date

Customer Worksite

Contactor Tel Service Eng Tel


Compaction Soil Sand Powder Sticky Water 8~14 14~20 20~25 Close-
type Soil Content(﹪) Less Normal More grained
effect

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers

Memo: According to manual, press experiment need taking with one kind of soil textures.

2、Inspect Subjects:
Third First
Working Swerve
Traveling Speed gear gear
Speed Semidiamet
(km / hrs) Fouth Sencod
(km / hrs) er
gear gear
Gradient(﹪) Hydraulic Brake
High Frequency Normal□ Abnormal□
Distance

Hydraulic Oil
Low Amplitude Normal□ Abnormal□ A/C
Temperature

Equipment System Normal□ Abnormal□ Indicator Normal□ Abnormal□

3、Inspect Result:

Customer Advise: Supplier representation Advise:

Signature&Stamp: Signature:

Date: Date:

Concrete Truck Mixer Commissioning Report

1、General situation
Equip type Equip No
Manufacture Commissioning
Date Date
Customer company Working site
Engineer &
Customer Contact Tel
Contact
Travelling
Chassis No Engine No
Miles

2、Test parameter
Mixing drum Normal□ Abnormal □ Water Pump Normal□ Abnormal□
Mixing operation system Normal □ Abnormal □
Chassis Normal □ Abnormal □

3、 Training Record of Customer

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.
All for customers
Trainee
Trainee No
Signature
□ Product knowledge □ Maintenance skill
Trainee Content
□ Operation

4、 Test Result

Customer Advise Supplier representation Advise:

Signature & Stamp: Signature:

Date: Date:

Notice: 1, This report is made in duplicate, each party keeps one.


2, Supplier representation is the engineer or sales, and the report of supplier must be delivered to SANY.