F E J 3.
OF THE SPECIFICATIONS.
CHARACTERISTIC CUBE STRENGTH OF REINFORCED CONCRETE
AFTER 28 DAYS IS 35MPa WITH MINIMUM CEMENT CONTENT
400 Kg/m 3 .
4. CHARACTERISTIC CUBE STRENGTH OF PLAIN CONCRETE AFTER
28 DAYS IS 20MPa WITH MINIMUM CEMENT CONTENT 250 Kg/m 3.
5. YIELD STRENGTH OF REINFORCED BARS IS 420 N/mm2.
6. THE CLEAR COVER FOR REINFORCEMENT SHALL BE
AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:
a. -- FOUNDATION COVER= 70 mm
b. --WALLS 50 mm
c. -- COLUMNS 30 mm
d. -- BEAMS AND SLABS 25 mm
7. FOUNDATIONS ARE DESIGNED BASED ON BEARING
CAPACITY IS 300 kPa AS PER GEOTECHNICAL REPORT
49000mm 8. ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT SHOULD BE
IMPLEMENTED.
9. SOIL BELOW FOUNDATION (FORMATION LEVEL) TO BE COMPACTED
8630mm 5650mm 29600mm 1360mm 3760mm
UP TO 95%.
10. ALL FIXATION DETAILS AND EMBEDDED PARTS SHOULD BE
43880mm 480mm 570mm 480mm 3590mm COORDINATED WITH FINAL SUPPLIER DRAWINGS.
203
11. SPLICE LENGTH CALCULATED AS PER ECP 2020 4-2-5-4-1 / C&D
203
12. BAR BENDING RADIUS CALCULATED AS PER DETAILS CODE 2001 3-3
C3 T.O.C(+74.43)
Starting at level (74.43) 800mm level deference from (+74.43) TO (+75.43)
planted on pier T.O.C(+75.43) Y
Mark [mm]
Shape
[mm]
Length
[mm] QTY Mass
[kg]
% of
total Notes
500
1 Y16 11158 11634 258 4737.48 7.8% H.Z-O.F; H.Z-I.F
150mm
150mm
900mm
600mm
600mm
2 Y16 12000 12000 740 14015.66 23.1% H.Z-O.F; H.Z-I.F
150mm
150mm
500
3 Y16 8475 40 535.08 0.9% HZ-OF
FC1* FC1*
7999
Starting at level (75.43) Starting at level (75.43) Wall Sec plan - wall NO 02
500
500
4 Y16 4433 102 713.73 1.2% H.Z-I.F
3481
Number of walls =2
6 Y16 9823 12000 9823~12000 8 137.78 0.2% H.Z-I.F
700
7 Y16 2400 42 159.09 0.3% H.Z-I.F
1724
500
10 Y16 11524 12000 102 1931.83 3.2% H.Z-I.F
2 N=53 L=12000
11524 513
12000
513
499
500
11 Y16 2400 102 386.32 0.6% H.Z-I.F
960mm
500
1 N=67 L=11634
500
470
5224
13 Y18 6000 6000 284 3403.73 5.6% VL-I.F
499
500
15 Y16 6000 6000 260 2462.16 4.1% VL-I.F
2 N=62 L=12000 11 N=51 L=2400
500
800
11142 H.Z-I.F
11158
500
12000 10 N=51 L=12000
500
500
4 N=51 L=4433
784
783
17 Y16 5000 36 284.12 0.5% H.Z-I.F
11524 12 N=51 L=3000
3481
3481
224
789
3500
470
18 Y16 2400 36 136.39 0.2% H.Z-I.F
789
224
19 Y16 3500 3500 36 198.87 0.3% H.Z-I.F
500
20 Y16 2000 8 25.25 0% H.Z-I.F
1524
800
21 Y16 11224
12000 38 719.74 1.2% HZ-OF
10134
28 Y16 11186 16 282.48 0.5% HZ-OF
800
(+74.43)
300
1050
10640
29 Y16 11692~2102 36 391.89 0.6% HZ-OF
800
800
300
300
800
31 Y16 3000 36 170.45 0.3% HZ-OF
2224
676 440
500
32 Y16 5524
6000 102 965.98 1.6% HZ-OF
700mm
33 Y22 3000 3000 180 1611.38 2.7% STARTER BAR
38 Y16/100
2347
L=3000
34 Y18 3000 436 2612.81 4.3% VL-I.F
680
(+75.43)
N=142
3351
676
1807
35 Y18/100
620
VL-I.F
2584
L=4000
N=142
37 Y16 6000 6000 284 2689.37 4.4% VL-O.F
487
3351
620 38 Y16
2584
440
700mm
40 Y16/100
1513
L=1500
1037
510
N=130
36 Y18/100
1037
L=2400
487
N=130
1807
REFERENCE DRAWINGS:
8650mm
27 Y18/100 N=130 L=6000
6000
6000
7120mm
6000
6000
800
960mm
860mm
860mm
1080mm
860mm
سا
2000mm
1400mm
1090mm
Starter bars
960mm
1950mm
1430mm
Starter bars
1060mm
2200
2750
Starter bars
Starter bars
900mm
PS (04)
900mm
200
150mm
N.T.S
PS04 - PUMP HOUSE
Wall reinforce detail-NO 02
11/30
1053-SHD-PUS-RF-005315 00