Download as pdf
Download as pdf
You are on page 1of 2
Work Inspection Request TNHPRYAYTAOTMOOTPSC-ARCIRE 0003 | Revision:] R00] Submission Date: | 20712071 Riyadh Townshp(Kaden Read & Parable Water Line) | Inepection Date: 2inivao2i ROSHN Time: (0400 PM “Aaria Han for Projecl Management Contractor] POSCO EAC Saal aba Discipline: Dsuney Cow Bi Architectural Structural TDiLandscape Omer DHse ‘Work Details: tion request for full block wall installation. highlighted drawing ‘Approved Method Statement: Element Code: Concrete DIV. CODE/ BOQ Re Blo a4 ‘Administrative Bulging MIR Provious No: ipod Onna POSCO-PHWI-SD-AB.ST-005 1008 Attached Approved Drawings ‘Attached Location Sketch Location / Level /Room ‘Attached Check Sheet Namo & No. 1 Grid Line: ‘Attached Previous Revision (an) Tf a a gid Ss Ama sean a STEPS Rapes Engineer's Review Status of inspection: ClSiatus A Approved) 2YStats (Approved with Comments) CStatsC (Revise & Rel Dash Goat 2 Lie, rect, Sone Cid a Quality Control Comments: ‘Comments: ‘Comments: eo SCO FP 2SS. won Magar oe Than a tt plays ta aa Page 1 of 1 lem | me | ms fe | oO ® @ © ( 4 ‘enone FLOOR CEILIN & WALLS FINISHES PLAN ip RoshnRealEsae &yLacll hay

You might also like