TNHP Ry Ry1 A01 Iw001 PSC Arc Ire 00013 Code B

You might also like

Download as pdf
Download as pdf
You are on page 1of 3
() Mea abl Work Inspection Request TNAPRYRYTADLMGOTPSCARCAREDDOS | Revisions] R00] Submission Date: r2/am021 ‘yesh Townahip-aden Reed & Potable WaterLine) | Inspection Date: ‘orranat ROSH Time: ov00 PM [Akaria Hanmi for Project Management Contractor] POSCO E&G Saud Arabia Discipline: Csurvey Dewi Bi Accitecural [Stuur Titendscape Omer Ose Di others ) Work Details for Internal Walls of MRMU bulding a8 per highlighted drawi “Approved Method Statement: TBP RY-RY ADI GOT PSC NV MST-0008 Element Code: «0001 ‘cavity Wall DIV. CODE / BOG Ref: BULNO33 MRMU Buicing MIR Previous No: eae POSCO-KON-MR-A-SD-01 te Attached Approved Drawings = ‘Attached Location Sketch a Location /Level/ Room ‘Attached Check Sheet Q Name & No. Grid Line: Attached Previous Revision ran) C] “Te oe wok eer opie wParam glint wd mio rapa Contactors Representative: Nar Tak Ghai Engineer's Review ‘Status of Inspection: []Status A (Approved) CiStatus ¢ (Revise & Rosubmit) ~ Status: D »d) Coenen ret dee. wer, Peat! zy the hav cracks be Hy Siar, ” na eens reviwarnane: [Deo Z Signatur: pas: | /Q— 12 Quality Control Comments: ‘Comment \ Reviewor Name: PM Review (if Required) ‘Comments: Page 1 of 1 (j Akai Ne Rite Eas SAUeL ARAYA & Work Inspection Request Request Ref: | TNHP-RY-RY1-AOT«WOO'-PSC-ARC-IRE-00010 Rovision:| R00| Submission Date: | 0971272021 Project: Riyadh Townehip-(Kaden Road & Portable Water Line) _| Inspection Date: swerare0at Client: ROSHN Tim 700M Engineer: ‘Akaria Hanmi for Project Management Contractor] POSCO F&C Saual Arabia cui BB Architectural] Structural Ditandscape Fig sz ‘Approved Method Statement: ‘TNHP-RY-RY -AOT-W001-PSO-CIV-NST-00008 Element Code: ‘40001 | Cavity Wall DIV. CODE 0 Ref: BNSS “Sections | WRU Balding MIR Provious No: Sees fers pawns POSCO.KONWR-ASDOT 7 ‘Attached Approved Drawings B ‘tached Location Sketch a Location Level Room ‘tached Check Sheet o Name & No. Grid Line: Attached Previous Revision vay Cl The above work hs een comple exon o Project requrerat and pects ad rad fr nepecton® eaeneaiven vs ep ea anna ‘Tarik Ghonaim Contractor's —— RoshnRealésare Aylaell stig) TOD Abariatianni

You might also like