Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Main Aims/Notes Monday Tuesday Wednesday Thursday Friday

Week 1 (Final Drafts 27th November 28th November 2023 29th November 2023 30th November 2023 1st December 2023
of Script) 2023
Give Kayleigh the Add any more final Give the final script
Work on the final script to read and things to add to the over to Kayleigh and Make sure that the
touches of the draft give feedback on script have a table read. filming dates are
script clear to Kayleigh and
the location

Week 2 - 6 (Make Make sure to start Read the context, Cast the 3/4 extras Get a Make sure to make it
sure to cast all of reading over the and make a producer for our short film cinematographer on clear when filming
the extras and get script regularly and schedule and make ready for filming to board as well as a will occur and get all
creative teams and start remembering sure everything is all begin. sound operator. equipment from mics,
prep) lines prepared for the 2 tripods, and
filming days. clipboards. And all of
the props needed.

Week 7 (Final prep, 1st January 2024 2nd January 2024 3rd January 2024 4th January 2024 5th January 2024
call times
announced and Make sure that the FILMING DAY 1 Make sure to start Make sure to make a
filming day 1 with filming schedule is (Scene 2/4) editing the closing filming schedule for Make sure everything
editing beginning) ready for day 1 of credits and the sound day 2 of filming. is ready for the 2nd
filming to begin and Alexander Park and we want to use over day of filming!
that all of the extras The Egg Theatre the montage.
and team are clear Bath, UK
on call times and
locations. Make sure that all of
the extras are at the
location and explain
their role in the first
scene and the
montage and film the
first 2 scenes of the
short film.

Week 8 (Prep and 8th January 2024 9th January 2024 10th January 2024 11th January 2024 12th January 2024
filming day 2 and
official editing for Make sure everything FILMING DAY 2 Editing begins for the
the montage Make sure is ready for filming to (Scene 4/4) montage. Editing begins for the
begins) everything is ready begin including call montage
for filming to begin times, props, and Barrs Court, Bristol
including call times, costumes. UK
props, and
costumes. Film the final 2
scenes of the short
film and look back at
the footage to make
sure it is suitable.

Week 9 (Editing for 15th January 2024 16th January 2024 17th January 2024 18th January 2024 19th January 2024
Scene 1-3)
Editing begins for Editing begins for
Scene 1 Editing begins for Editing begins for Scene 2 Editing begins for
Scene 1 Scene 2 Scene 3

Week 10 (Final 22nd January 2024 23rd January 2024 24th January 2024 25th January 2024 Saturday 27th
Editing and January 2024
Submission) Final editing with Final editing with
soundtrack Final editing with Final editing with soundtrack Submission Deadline
soundtrack soundtrack CCC

You might also like