REPUBLIC OF RWANDA

4543_Plot owned by
the project owner

219
STORE ROOM
SOAK PIT
DINNING AREA

KITCHEN

PROJECT CLIENT: APEH


VERANDAH

SEPTIC TANK

6m Roa
MEETING HALL

OFFICE
PROJECT NAME:

d
TOILET "DETAILED ENGINEERING DESIGN
SERVICES FOR THE
CONSTRUCTION OF "HEROES DAY
CARE CENTRE"
MUSICAL THERAPY

DAY CARE ROOM


1,006
DAY CARE ROOM

GARDEN MORNING WARM UP

6m Roa
1,630

DESIGN BY:

d
CHANGING ROOM

DAY CARE ROOM

DAY CARE ROOM

Eng.N Alexandre
Reg:496/EC/IER/2016
OT ROOM

6m Roa
DECEMBER 2020

LIBRARY The copyright of these drawings vest in it must not be retained,


PT ROOM
copied or used without their express authority

d
NOTES
All work to be strictly in accordance to the standard
specifications and notes.

Architectural drawings to be read with relevant


structural, mechanical and electrical drawings.

(1) a. All dimensions (in mm) to be checked on site.

MAIN ENTRANCE
Written dimensions rules over scaled drawings.
830

b. Any discrepancy in dimensions to be reported to


PARKING the architect before proceeding.
(3) All retaining walls to be damp proofed civil
engineer's
specification and detailing.
(4) Masonry walls below 200mm thick to be reinforced
with hoop iron at every alternate courses.
(5) Air vents are to be provided where are necessary
according to electromechanical engeneer..
(6) A single layer o f3-ply bituminous felt to be
provided
between masonry and RC. work.
(7) Drain pipes passing under tarmac, driveways, and
buildings to be encased in 150mm thick concrete
surround
(8) All reinforced concrete work to structural
Engineer's
drawings.
(9)All roads, storm water drainage and foul sewerage
to
Civil Engineer's drawings
(10) depth at foundation to be determined on site, all
Foundations r.c. Columns and r.c. Works to
Structural engineers' detail.