The document is a map and layout of a detonator workshop area. It includes 10 labeled buildings and structures within the area, including a melting, mixing and casting building, comprehensive material warehouse, PETN drying workshop, PETN core workshop, boiler room, laboratory, security, electrical substation, control room, and sewage water collector. It also provides the workshop's location, scale of the map, capacities for TNT and PETN storage, and production.
The document is a map and layout of a detonator workshop area. It includes 10 labeled buildings and structures within the area, including a melting, mixing and casting building, comprehensive material warehouse, PETN drying workshop, PETN core workshop, boiler room, laboratory, security, electrical substation, control room, and sewage water collector. It also provides the workshop's location, scale of the map, capacities for TNT and PETN storage, and production.
The document is a map and layout of a detonator workshop area. It includes 10 labeled buildings and structures within the area, including a melting, mixing and casting building, comprehensive material warehouse, PETN drying workshop, PETN core workshop, boiler room, laboratory, security, electrical substation, control room, and sewage water collector. It also provides the workshop's location, scale of the map, capacities for TNT and PETN storage, and production.
1 2 Ja la nH au lin 3 g PT. BM SA 4 6 5 NO EASTING NORTHING 1 - - 2 - - 3 - - 4 - - PETA SITUASI GUDANG BAHAN PELEDAK EMULSI SKALA 1 : 5000 DATA BANGUNAN No Nama Bangunan Panjang Lebar 1 Melting, mixing and Casting 30 m 16 m 2 Comprehensive Material Warehouse 25 m 10 m 3 PETN Drying Workshop 40 m 15 m 4 PETN Core Workshop 21 m 10 m Sewage water collector X 1 5 Boiler Room 6m 6m 6 Laboratory 7m 15 m 7 Security 6m 6m 8 Gardu Listrik 4m 4m Detonator Workshop Area 9 Control Room 5m 6m 1 10 2 3 PT. MULTI NITROTAMA KIMIA 4 MNK MINING SERVICES BOOSTER PLANT LAYOUT KAPASITAS : Gudang TNT : ............. Kg Gudang PETN : ............. Biji Produksi : ............. Kg 6 5 Desa ......................, Kecamatan .................. Kabupaten ..............., Provinsi .............................. DIGAMBAR DIPERIKSA DISETUJUI CATUR WALUYO HADI AGUNG WIBOWO - Spvr Engineering GM. Bussiness Development - TGL : 26 Juni 2023 TGL : 2023 TGL : 2023 KODE GAMBAR NOMOR GAMBAR JUMLAH LEMBAR ENG/HANDIL/01/VI/2023 1/1 KETENTUAN SKALA PETA SITUASI 1 : 1.000 0 10 20 30 40 50 60 70m PETA KONSTRUKSI 1 : 100 0 1 2 3 4 5 6 7m