Projects
Kinds of Projects Size Ranges
Road, Highway Pavement and Railways, Airport Horizontal Structures and Bridges Medium A
Financial Aspect
Record Year Current Assets Total Assets Current Liabilities Total Liabilities Total Liabilities and Present Net Worth Gross Annual
Owner’s Equity Turnover
(Construction)
2016 9,000,000.00 9,000,000.00 0.00 9,000,000.00 0.00
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
17HG0161 CONSTRUCTION OF 2-STOREY 4-CL DPWH - Cebu 4th 100.00 12/5/2017 4/4/2018 Buildings: 2.00 storeys 8,926,000.00
SCHOOL BUILDING, MALALAG ES, District Engineering Construction -
ARGAO, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
17HG0153 CONSTRUCTION OF 2-STOREY 4-CL DPWH - Cebu 4th 100.00 12/7/2017 4/5/2018 Buildings: 2.00 storeys 8,934,682.55
SCHOOL BUILDING, MANTALONGON District Engineering Construction -
ES, DALAGUETE, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
18CD0284 CONCRETING OF BRGY. UPIG FMR, DPWH - Bulacan 2nd 100.00 7/18/2018 9/15/2018 Roads: 0.32 km 1,908,655.30
BRGY. UPIG, SAN ILDEFONSO, District Engineering Construction -
BULACAN Office PCCP
18HG0181 CONSTRUCTION OF 3-STOREY 9-CL DPWH - Cebu 4th 100.00 12/5/2018 5/31/2019 Buildings: 3.00 storeys 24,430,237.42
SCHOOL BUILDING AT RONDA CES, District Engineering Construction -
RONDA, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
18HG0180 CONSTRUCTION OF 3-STOREY 9-CL DPWH - Cebu 4th 100.00 12/5/2018 5/31/2019 Buildings: 3.00 storeys 24,430,237.42
SCHOOL BUILDING AT DUMANJUG District Engineering Construction -
CES, DUMANJUG, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
19OI0013 CONSTRUCTION OF CUYAB BRIDGE, DPWH - Las Piñas- 100.00 6/7/2019 11/7/2020 Bridges: 20.00 lm 19,599,077.25
TUNASAN, MUNTINLUPA CITY Muntinlupa District Construction -
Engineering Office Concrete
(Superstructure)
- without Piles
19OI0070 CONSTRUCTION (EXTENSION) DPWH - Las Piñas- 100.00 6/7/2019 4/4/2022 Buildings: 4.00 storeys 6,579,711.16
MUNTILUPA BUSINESS HIGH Muntinlupa District Construction -
SCHOOL, BRGVY. BULI, MUNTINLUPA Engineering Office without Piles -
CITY Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
19OI0046 CONSTRUCTION OF FLOOD DPWH - Las Piñas- 100.00 7/12/2019 4/6/2020 Flood Control: 246.00 lm 29,235,170.23
CONTROL STRUCTURES AT TARTAR Muntinlupa District Construction -
CREEK, LAS PINAS CITY Engineering Office Slope Protection
using Structural
Measures (e.g.
Revetment,
Retaining
structures,
Wirenet)
19CC0217 CONSTRUCTION OF MULTI-PURPOSE DPWH - Bulacan 1st 100.00 7/23/2019 9/30/2019 Buildings: 1.00 storeys 1,940,380.44
BUILDING (BARANGAY HALL) BRGY. District Engineering Construction -
NIUGAN, MALOLOS, BULACAN Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
19HG0227 CONSTRUCTION OF TWO-STOREY (8 DPWH - Cebu 4th 100.00 9/12/2019 1/6/2020 Buildings: 2.00 storeys 22,274,108.28
CLASSROOMS) SCHOOL BUILDING District Engineering Construction -
AT ARGAO 1 CENTRAL ES, ARGAO, Office without Piles -
CEBU Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
19CC0259 CONCRETING OF BARANGAY DPWH - Bulacan 1st 100.00 9/30/2019 2/26/2020 Roads: 0.35 km 4,709,780.54
DULONG MALABON FMR BRGY. District Engineering Construction -
DULONG MALABON, PULILAN, Office PCCP
BULACAN
19OI0140 CONST. OF FOUR (4), STOREY EIGHT DPWH - Las Piñas- 100.00 10/3/2019 8/13/2020 Buildings: 4.00 storeys 27,999,871.97
(8) CLASSROOM SCHOOL BUILDING Muntinlupa District Construction -
AT BULI ELEM. SCHOOL, BRGY. BULI, Engineering Office without Piles -
MUNTINLUPA CITY Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
19HG0230 CONSTRUCTION OF TWO-STOREY (4 DPWH - Cebu 4th 100.00 10/13/2019 1/6/2020 Buildings: 2.00 storeys 12,506,021.16
CLASSROOMS) SCHOOL BUILDING District Engineering Construction -
AT LIBO PS, DALAGUETE, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
20OI0075 RETROFFITNG/STRENGTHENING OF DPWH - Las Piñas- 100.00 2/7/2020 7/21/2020 Bridges: 25.75 lm 5,585,980.62
PERMANENT BRIDGE, UPPER PALICO Muntinlupa District Rehabilitation -
BR. (EAST) (B01811LZ) ALONG Engineering Office Concrete
SOUTH SUPER H-WAY EAST (Superstructure)
SERVICE RD, MUNTINLUPA CITY - without Piles
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
20OI0076 RETROFFITING/STRENGTHENING OF DPWH - Las Piñas- 100.00 2/7/2020 7/21/2020 Bridges: 25.77 lm 6,035,187.53
PERMANENT BRIDGE, UPPER Muntinlupa District Rehabilitation -
PALICO BR. (WEST) (B01851LZ) Engineering Office Concrete
ALONG SOUTH SUPER H-WAY WEST (Superstructure)
SERVICE RD, MUNTINLUPA CITY - without Piles
20OI0080 REHAB./MAJOR REPAIR OF DPWH - Las Piñas- 100.00 2/7/2020 8/20/2020 Bridges: 29.60 lm 4,605,093.86
PERNAMENT BRIDGE-PASONG Muntinlupa District Retrofitting -
DIABLO BRIDGE (EAST) (B01810LZ) Engineering Office Concrete
ALONG SSH EAST SERVICE ROAD, (Superstructure)
MUNTINLUPA CITY - with Cast-in-
Place Piles
20OI0079 RETROFITTING/STRENGTHENING OF DPWH - Las Piñas- 100.00 2/7/2020 7/21/2020 Bridges: 29.65 lm 4,646,615.99
PERNAMENT BRIDGE, PASONG Muntinlupa District Retrofitting -
DIABLO BRIDGE (WEST), (B01852LZ) Engineering Office Concrete
ALONG SSH WEST SERVICE ROAD, (Superstructure)
MUNTINLUPA CITY - with Cast-in-
Place Piles
20OI0127 CONSTRUCTION OF MULTI-PURPOSE DPWH - Las Piñas- 100.00 11/30/2020 7/27/2021 Buildings: 2.00 storeys 7,839,744.71
BUILDING, BRGY. PUTATAN, Muntinlupa District Construction -
MUNTINLUPA CITY Engineering Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
20OI0120 CONSTRUCTION OF DRAINAGE DPWH - Las Piñas- 100.00 11/30/2020 7/27/2021 Roads: 0.65 km 14,849,996.67
SYSTEM, BARANGAY TUNASAN, Muntinlupa District Rehabilitation -
MUNTINLUPA CITY Engineering Office PCCP
20OI0081 PREVENTIVE MAINTENANCE DPWH - Las Piñas- 100.00 12/11/2020 1/9/2021 Roads: 326.80 km 14,484,393.62
PRIMARY ROADS DAANG MAHARLIKA Muntinlupa District Construction -
(LZ)-(K0026+(-446.80)-K0026+120), Engineering Office Asphalt
MUNTINLUPA CITYPARANAQUE-
SUCAT ROAD (S0
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
21HG0128 LOCAL PROGRAM - LOCAL DPWH - Cebu 4th 100.00 4/6/2021 7/2/2021 Buildings: 3.00 storeys 5,346,000.00
INFRASTRUCTURE PROGRAM District Engineering Construction -
BUILDINGS & OTHER STRUCTURES; Office without Piles -
Low Rise -
MULTIPURPOSE/FACILITIES - Concrete
CONSTRUCTION COMPLETION) OF (Frame) (1 to 5
MULTI-PURPOSE BUILDING, Storeys)
BRGY. DAAN LUNGSOD, ALCOY,
CEBU
21HG0135 LOCAL PROGRAM - LOCAL DPWH - Cebu 4th 100.00 4/6/2021 9/17/2021 Buildings: 1.00 storeys 4,455,000.00
INFRASTRUCTURE PROGRAM; District Engineering Construction -
BUILDINGS AND OTHER Office without Piles -
STRUCTURES; MULTI- Low Rise -
PURPOSE/FACILITIES - Concrete
REHABILITATION OF MULTI- (Frame) (1 to 5
PURPOSE BUILDING, BRGY. SANTA Storeys)
CRUZ, RONDA, CEBU
21CC0262 RECONSTRUCTION OF SAN JOSE DPWH - Bulacan 1st 100.00 4/15/2021 11/10/2021 Bridges: 12.80 lm 20,839,264.78
BRIDGE, SAN JOSE, PLARIDEL, District Engineering Construction -
BULACAN Office Concrete
(Superstructure)
- with Cast-in-
Place Piles
21CG0164 LOCAL INFRASTRUCTURE DPWH - Pampanga 1st 100.00 5/19/2021 9/30/2021 Roads: 1.00 km 23,438,246.26
PROGRAM: LOCAL ROADS AND District Engineering Construction -
BRIDGES - LOCAL ROADS - Office PCCP
CONCRETING OF ROAD, BARANGAY
SAN NICOLAS, SAN SIMON,
PAMPANGA
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
21OI0062 CONSTRUCTION OF MULTI-PURPOSE DPWH - Las Piñas- 100.00 5/25/2021 11/25/2021 Buildings: 2.00 storeys 5,913,539.46
BUILDING, BARANGAY ZAPOTE, LAS Muntinlupa District Construction -
PINAS CITY Engineering Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
21OI0067 REHABILITATION OF MULTI- DPWH - Las Piñas- 100.00 5/26/2021 10/22/2021 Buildings: 2.00 storeys 5,753,210.14
PURPOSE BUILDING AT BRGY. Muntinlupa District Construction -
ALMANZA 1, LAS PINAS CITY Engineering Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
21OI0055 CONSTRUCTION./UPGRADING/REHA DPWH - Las Piñas- 100.00 6/24/2021 2/3/2022 Flood Control: 0.25 lm 16,315,095.45
BILITATION OF DRAINAGE ALONG Muntinlupa District Construction -
NATIONAL ROADS-SECONDARY Engineering Office Drainage
ROADS: PPTA ROAD - K0027+346- (Closed and
K0027+093, MUNTINLUPA CITY open) Conduits
21HG0179 CONSTRUCTION/COMPLETION DPWH - Cebu 4th 100.00 9/29/2021 12/27/2021 Buildings: 1.00 storeys 911,619.52
(4STY16CL) AT SAN SEBASTIAN NHS, District Engineering Construction -
SAMBOAN, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
21HG0180 CONSTRUCTION OF SLOPE DPWH - Cebu 4th 100.00 9/29/2021 12/12/2021 Buildings: 1.00 storeys 718,157.16
PROTECTION AT MANTALONGON ES, District Engineering Construction -
DALAGUETE, CEBU Office without Piles -
Low Rise -
Concrete
(Frame) (1 to 5
Storeys)
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
21HG0125 OO1: ENSURE SAFE AND RELIABLE DPWH - Cebu 4th 100.00 9/29/2021 3/8/2022 Roads: 1.10 km 15,697,885.00
NATIONAL ROAD SYSTEM, ASSET District Engineering Rehabilitation -
PRESERVATION, Office PCCP
REHABILITATION/RECONSTRUCTION/
UPGRADING OF DAMAGED PAVED
ROADS - PRIMARY ROADS, N.
BACALSO AVE (CEBU SOUTH RD) -
K0089+100 - K0090+166
21OI0127 REHABILITATION / RETROFITTING / DPWH - Las Piñas- 100.00 12/17/2021 6/14/2022 Buildings: 3.00 storeys 16,398,225.78
STRENGTHENING OF PUBLIC Muntinlupa District Retrofitting -
BUILDINGS IN PREPARATION OF THE Engineering Office Low Rise
BIG ONE CAPTAIN ALBERT AGUILAR
NATIONAL HIGH SCHOOL, BUILDING
5, CAA ROAD COR. BALIKATAN ST.,
BF INTERNATIONAL VILLAGE, LAS
PINAS CITY
21HG0139 LOCAL PROGRAM-LOCAL DPWH - Cebu 4th 100.00 1/7/2022 2/20/2022 Buildings: 1.00 storeys 399,940.00
INFRASTRUCTURE PROGRAM; District Engineering Construction -
BUILDINGS AND OTHER Office without Piles -
STRUCTURES; MULTIPURPOSE Low Rise -
/FACILITIES - CONSTRUCTION Concrete
(COMPLETION) OF MULTI-PURPOSE (Frame) (1 to 5
BUILDING AT BRGY. MASA, Storeys)
DUMANJUG, CEBU
21HF0014 A. CONSTRUCTION OF MULTI- DPWH - Cebu 3rd 100.00 1/11/2022 4/21/2022 Buildings: 1.00 storeys 5,819,461.52
PURPOSE BUILDING, SITIO CANDIIS, District Engineering Construction -
BARANGAY SIBAGO, Office without Piles -
PINAMUNGAJAN, CEBU; B. Low Rise -
CONSTRUCTION OF MULTI-PURPOSE Concrete
BUILDING, SITIO BANBAN, BRGY. (Frame) (1 to 5
PANDACAN, PINAMUNGAJAN, CEBU Storeys)
(CLUSTER 18)
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
21HF0044 A. CONSTRUCTION OF MULTI- DPWH - Cebu 3rd 100.00 1/11/2022 5/2/2022 Buildings: 1.00 storeys 5,301,222.15
PURPOSE BUILDING, BUANOY District Engineering Construction -
NATIONAL HIGH SCHOOL, Office without Piles -
BALAMBAN, CEBU; B. COMPLETION Low Rise -
OF MULTIPURPOSE BUILDING AT Concrete
BARANGAY BALIWAGAN, BALAMBAN, (Frame) (1 to 5
CEBU (CLUSTER 24) Storeys)
21HF0048 CONSTRUCTION OF FLOOD DPWH - Cebu 3rd 100.00 1/11/2022 6/24/2022 Flood Control: 454.00 lm 13,884,749.00
MITIGATION STRUCTURE AT ILAG District Engineering Construction -
RIVER ALONG NAGA-ULING RD., Office Slope Protection
BRGY. DON ANDRES SORIANO, using Structural
TOLEDO CITY, CEBU Measures (e.g.
Revetment,
Retaining
structures,
Wirenet)
21CC0173 ROAD IMPROVEMENT WITH DPWH - Bulacan 1st 100.00 1/14/2022 6/12/2022 Roads: 0.16 km 3,394,541.20
DRAINAGE, BARANGAY TURO, District Engineering Rehabilitation -
BOCAUE, BULACAN Office PCCP
22HO0036 BASIC INFRASTRUCTURE PROGRAM DPWH - Cebu 7th 100.00 2/10/2022 7/9/2022 Buildings: 1.00 storeys 2,968,373.79
(BIP): MULTI-PURPOSE BUILDINGS/ District Engineering Construction -
FACILITIES TO SUPPORT SOCIAL Office without Piles -
SERVICES - CONSTRUCTION Low Rise -
(COMPLETION) OF MULTI-PURPOSE Concrete
BUILDING AT BARANGAY TALAYONG, (Frame) (1 to 5
BADIAN, CEBU Storeys)
Completed Projects
Contract ID Contract Description Owner Participation Contract Contract Major Dimension Total As Built
Percentage Date Date Categories Cost Per Major
Started Completed of Work Work Category
22CC0282 REHABILITATION OF FLOOD DPWH - Bulacan 1st 100.00 4/6/2022 7/1/2022 Flood Control: 29.75 lm 4,899,893.64
STRUCTURE ALONG BARANGAY District Engineering Construction -
PINAGBARILAN, BALIWAG, BULACAN Office Slope Protection
using Structural
Measures (e.g.
Revetment,
Retaining
structures,
Wirenet)
22CC0281 REHABILITATION OF FLOOD DPWH - Bulacan 1st 100.00 4/6/2022 7/1/2022 Flood Control: 29.75 lm 4,899,975.59
CONTROL STRUCTURE ALONG District Engineering Construction -
BARANGAY PINAGBARILAN, Office Slope Protection
BALIUAG, BULACAN using Structural
Measures (e.g.
Revetment,
Retaining
structures,
Wirenet)
21HG017 REPAIR/MAINTENAN DPWH - Cebu 100.00 1/1/1900 1/1/1900 0.00 0.00 #Error Bridges: 0.01 km 1,164,000.00
5 CE OF ABUTMENT OF 4th District Maintenance
DALAGUETE BRIDGE Engineering
APPROACH "A" Office
ALONG NATALIO
BACALSO AVENUE,
K0083+944
22OI0101 CONSTRUCTION OF DPWH - Las 100.00 1/1/1900 1/1/1900 0.00 0.00 #Error Buildings: 2.00 46,550,138.27
BJMP BUILDING, Piñas- Construction - storeys
BARANGAY Muntinlupa without Piles -
PUTATAN, District Low Rise -
MUNTINLUPA CITY Engineering Concrete (Frame)
Office (1 to 5 Storeys)
23CC045 CONSTRUCTION OF DPWH - 100.00 1/1/1900 1/1/1900 0.00 0.00 #Error Buildings: 1.00 4,698,280.48
4 MULTI-PURPOSE Bulacan 1st Construction - storeys
FACILITY (PUBLIC District without Piles -
MARKET) PLARIDEL, Engineering Low Rise -
BULACAN (PHASE II) Office Concrete (Frame)
(1 to 5 Storeys)
23DH009 COMPLETION OF DPWH - 100.00 1/1/1900 1/1/1900 0.00 0.00 #Error Buildings: 1.00 9,601,978.00
8 MULTI-PURPOSE Laguna 1st Construction - storeys
BUILDING District without Piles -
(MUNICIPAL HALL) Engineering Low Rise -
PILA, LAGUNA Office Concrete (Frame)
(1 to 5 Storeys)