Documentation Bulletin: No.: L410UVP-E/301d

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

DOCUMENTATION BULLETIN

No.: L410UVP-E/301d

Concerning: Maintenance Schedule for the L 410 UVP-E20 aeroplane without overhaul with 100 FH check
No. Do-L 410-1223.2.

Subject: Revision of Maintenance Schedule.

Reason: Revision of Maintenance Schedule on the basis editorial changes.

Measure: Replace original pages of Maintenance Schedule by attached pages with the same numbers
dated Oct 16/19:
0-4, 0-5, 0-9, 9.7-49, 9.7-70.

To be carried out at the latest by: On receiving this bulletin.

To be carried out by: Operator.

Costs to be covered by: No costs arise.

Necessary material to be supplied by: The revised pages of Maintenance Schedule are enclosed to
this bulletin.

Bulletin becomes effective: On the date of receiving this bulletin.

Total number of pages: 1+5

……………………………........
Released
Airworthiness

The technical content of this document is approved under the authority of DOA ref. EASA.21J.119.
Issue date 16.10.2019

Aircraft Industries, a.s. Kunovice 686 04 Czech Republic, tel.: +420 572 817 660, fax: +420 572 816 112, e-mail: ots@let.cz
FQ050103D
MAINTENANCE SCHEDULE

RECORD OF REVISIONS

Date of Issue Date of


Rev. Bulletin No.
of New Number of Revised Pages Entry and
No. L 410 UVP-E/...
Pages Signature

MS is reissued on Feb 10/09. This contains revisions from No. 1 to No. 10.

11. Not applicable


12. Not applicable
13. 122d Oct 9/09 Title page, 0-3, 0-5, 0-6, 0-7, 0-9, 1-5, 2-1, 2-3,
3-6, 3-7, 3-11, 4-11, 4-13, 4-14, 4-23, 4-24, 4-31.
4-43, 4-49, 4-71, 6-4, 7-4, 7-5, 8-4, 8-6, 9.7-35,
9.7-36, 9.7-50, 9.7-71 to 9.7-92.
14. 134d Oct 21/11 0-3, 0-5 to 0-9, 2-3, 3-3 to 3-5, 3-7 to 3-11, 4-3,
4-15, 4-24, 4-29, 4-30, 4-46, 4-87, 4-89, 6-5 to
6-7, 7-4, 8-4, 8-5, 9.1-11, 9.3-2, 9.3-3, 9.3-5,
9.7-1, 9.7-2, 9.7-33, 9.7-35, 9.7-36, 9.7-39,
9.7-41, 9.7-42, 9.7-47, 9.7-48, 9.7-51, 9.7-58,
9.7-62, 9.7-65a, 9.7-65b, 9.7-66, 9.7-71, 9.7-72,
9.7-75, 9.7-86, 9.7-88, 9.7-90.
15. Not applicable
16. 172d Mar 15/13 0-3, 0-5, 0-8, 0-11, 2-1, 2-6, 9.7-1.
17. 174d Mar 29/13 0-3, 0-5 to 0-10, 1-4, 3-5, 4-3, 4-11, 4-12, 4-13,
4-15, 4-17, 4-18, 4-23, 4-24, 4-27, 4-30, 4-35,
4-44 to 4-47, 4-49 to 4-52, 4-65, 4-69, 4-70, 4-71,
4-73, 4-81, 6-4, 6-6, 6-7, 7-4, 7-5, 8-4, 8-6, 9.1-2 to
9.1-13, 9.3-4, 9.3-5, 9.3-6, 9.6-1, 9.9-1, 9.12-1.
18. 175d Dec 20/13 Title page, 0-1, 0-3, 0-5 to 0-9, 1-5, 1-6, 4-9, 4-69,
4-75, 4-77, 4-79, 4-81, 4-85, 4-87, 6-5 to 6-7,
9.1-8, 9.1-12, 9.1-13, 9.1-17, 9.1-23, 9.2-4, 9.3-1,
9.3-6, 9.6-1, 9.7-1 to 9.7-26, 9.7-28 to 9.7-30,
9.7-36 to 9.7-39, 9.7-42, 9.7-52, 9.7-69, 9.7-72,
9.7-74, 9.7-75, 9.7-86, 9.7-87, 9.7-89.
19. Not applicable
20. 199d Jul 31/14 0-3, 0-5 to 0-7, 1-4, 3-3 to 3-11, 4-5, 4-6, 4-9,
4-11 to 4-31, 4-33 to 4-35, 4-37 to 4-53, 4-57,
4-59, 4-61 to 4-63, 4-65, 4-67, 4-69 to 4-71, 4-73,
4-74, 4-81, 4-82, 4-87, 4-91, 6-3, 6-4, 6-8, 8-6.
21. 200d Apr 22/16 0-3, 0-5 to 0-8, 0-11, 1-4, 1-5, 1-7, 3-3, 3-4, 3-9, 3-
10, 3-11, 4-3 to 4-92, 5-3, 6-3, 6-6, 7-3, 7-4,
8-4, 8-6, 9.1-1, 9.1-10, 9.1-12 to 9.1-24, 9.3-3 to
9.3-5, 9.6-1.
22. 254d Jan 31/18 0-3, 0-5 to 0-8, 0-11, 1-7, 3-5, 4-3, 4-5, 4-6, 4-12,
4-13, 4-20, 4-33, 4-36, 4-56, 4-61, 4-70, 4-74,
4-84, 8-3 to 8-6, 9.1-7, 9.1-22, 9.2-1, 9.3-4, 9.3-5,
9.5-1, 9.6-1.

Jan 31/18 Page: 0 - 3


MAINTENANCE SCHEDULE

Date of Issue Date of


Rev. Bulletin No.
of New Number of Revised Pages Entry and
No. L 410 UVP-E/...
Pages Signature

23. 290d Mar 15/19 0-4 to 0-8, 1-5, 2-3, 2-4, 2-5, 3-8, 4-3, 4-12, 4-33,
4-34, 4-73, 4-74, 4-83, 4-84, 5-3, 7-5, 8-6, 9.7-4.
24. 296d May 7/19 0-4, 0-5, 1-5, 3-8.
25. 301d Oct 16/19 0-4, 0-5, 0-9, 9.7-49, 9.7-70.

Oct 16/19 Page: 0 - 4


MAINTENANCE SCHEDULE

LIST OF EFFECTIVE PAGES

Chapter Chapter
Section Page Date Section Page Date
Subject Subject

TITLE PAGE - - AIRWORTHINESS 2-1 Mar 15/13


LIMITATION SEC- 2-2 Feb 10/09
RECORD/TEMP. 0-1 Dec 20/13 TION 2-3 Mar 15/19
REVISIONS 0-2 Feb 10/09 2-4 Mar 15/19
2-5 Mar 15/19
RECORD OF 0-3 Jan 31/18 2-6 Mar 15/13
REVISIONS 0-4 Oct 16/19

LIST OF EFFECT. 0-5 Oct 16/19


PAGES 0-6 Mar 15/19 ROUTINE 3-1 Feb 10/09
0-7 Mar 15/19 MAINTENANCE 3-2 Feb 10/09
0-8 Mar 15/19 3-3 Apr 22/16
0-9 Oct 16/19 3-4 Apr 22/16
0-10 Mar 29/13 3-5 Jan 31/18
3-6 Jul 31/14
CONTENTS 0-11 Jan 31/18 3-7 Jul 31/14
0-12 Feb 10/09 3-8 May 7/19
3-9 Apr 22/16
INTRODUCTION 1-1 Feb 10/09 3-10 Apr 22/16
1-2 Feb 10/09 3-11 Apr 22/16
1-3 Feb 10/09 3-12 Feb 10/09
1-4 Apr 22/16
1-5 May 7/19
1-6 Feb 10/09
1-7 Jan 31/18
1-8 Feb 10/09 PERIODIC 4-1 Feb 10/09
1-9 Feb 10/09 MAINTENANCE 4-2 Feb 10/09
1-10 Feb 10/09 4-3 Mar 15/19
1-11 Feb 10/09 4-4 Apr 22/16
1-12 Feb 10/09 4-5 Jan 31/18
4-6 Jan 31/18
4-7 Apr 22/16
4-8 Apr 22/16

Oct 16/19 Page: 0 - 5


MAINTENANCE SCHEDULE

Chapter Chapter
Section Page Date Section Page Date
Subject Subject

PERIODIC 4-9 Apr 22/16 PERIODIC 4-44 Apr 22/16


MAINTENANCE 4-10 Apr 22/16 MAINTENANCE 4-45 Apr 22/16
4-11 Apr 22/16 4-46 Apr 22/16
4-12 Mar 15/19 4-47 Apr 22/16
4-13 Jan 31/18 4-48 Apr 22/16
4-14 Apr 22/16 4-49 Apr 22/16
4-15 Apr 22/16 4-50 Apr 22/16
4-16 Apr 22/16 4-51 Apr 22/16
4-17 Apr 22/16 4-52 Apr 22/16
4-18 Apr 22/16 4-53 Apr 22/16
4-19 Apr 22/16 4-54 Apr 22/16
4-20 Jan 31/18 4-55 Apr 22/16
4-21 Apr 22/16 4-56 Jan 31/18
4-22 Apr 22/16 4-57 Apr 22/16
4-23 Apr 22/16 4-58 Apr 22/16
4-24 Apr 22/16 4-59 Apr 22/16
4-25 Apr 22/16 4-60 Apr 22/16
4-26 Apr 22/16 4-61 Jan 31/18
4-27 Apr 22/16 4-62 Apr 22/16
4-28 Apr 22/16 4-63 Apr 22/16
4-29 Apr 22/16 4-64 Apr 22/16
4-30 Apr 22/16 4-65 Apr 22/16
4-31 Apr 22/16 4-66 Apr 22/16
4-32 Apr 22/16 4-67 Apr 22/16
4-33 Mar 15/19 4-68 Apr 22/16
4-34 Mar 15/19 4-69 Apr 22/16
4-35 Apr 22/16 4-70 Jan 31/18
4-36 Jan 31/18 4-71 Apr 22/16
4-37 Apr 22/16 4-72 Apr 22/16
4-38 Apr 22/16 4-73 Mar 15/19
4-39 Apr 22/16 4-74 Mar 15/19
4-40 Apr 22/16 4-75 Apr 22/16
4-41 Apr 22/16 4-76 Apr 22/16
4-42 Apr 22/16 4-77 Apr 22/16
4-43 Apr 22/16 4-78 Apr 22/16

Mar 15/19 Page: 0 - 6


MAINTENANCE SCHEDULE

Chapter Chapter
Section Page Date Section Page Date
Subject Subject

SUPPLEMENTS 9.7-31 Feb 10/09 SUPPLEMENTS 9.7-65a Oct 21/11


9.7-32 Feb 10/09 9.7-65b Oct 21/11
9.7-33 Oct 21/11 9.7-66 Oct 21/11
9.7-34 Feb 10/09 9.7-67 Feb 10/09
9.7-35 Oct 21/11 9.7-68 Feb 10/09
9.7-36 Dec 20/13 9.7-69 Dec 20/13
9.7-37 Dec 20/13 R 9.7-70 Oct 16/19
9.7-38 Dec 20/13 9.7-71 Oct 21/11
9.7-39 Dec 20/13 9.7-72 Dec 20/13
9.7-40 Feb 10/09 9.7-73 Oct 9/09
9.7-41 Oct 21/11 9.7-74 Dec 20/13
9.7-42 Dec 20/13 9.7-75 Dec 20/13
9.7-43 Feb 10/09 9.7-76 Oct 9/09 R
9.7-44 Feb 10/09 9.7-77 Oct 9/09 R
9.7-45 Feb 10/09 9.7-78 Oct 9/09 R
9.7-46 Feb 10/09 9.7-79 Oct 9/09 R
9.7-47 Oct 21/11 9.7-80 Oct 9/09 R
9.7-48 Oct 21/11 9.7-81 Oct 9/09 R
9.7-49 Oct 16/19 9.7-82 Oct 9/09 R
9.7-50 Oct 9/09 9.7-83 Oct 9/09 R
9.7-51 Oct 21/11 9.7-84 Oct 9/09 R
9.7-52 Dec 20/13 9.7-85 Oct 9/09 R
9.7-53 Feb 10/09 9.7-86 Dec 20/13
9.7-54 Feb 10/09 9.7-87 Dec 20/13
9.7-55 Feb 10/09 9.7-88 Oct 21/11
9.7-56 Feb 10/09 9.7-89 Dec 20/13
9.7-57 Feb 10/09 9.7-90 Oct 21/11
9.7-58 Oct 21/11 9.7-91 Oct 9/09 R
9.7-59 Feb 10/09 9.7-92 Oct 9/09 R
9.7-60 Feb 10/09
9.7-61 Feb 10/09
9.7-62 Oct 21/11 9.9-1 Mar 29/13
9.7-63 Feb 10/09 9.9-2 Feb 10/09
9.7-64 Feb 10/09 9.9-3 Feb 10/09
9.7-65 Feb 10/09 9.9-4 Feb 10/09

Oct 16/19 Page: 0 - 9


MAINTENANCE SCHEDULE

Chapter Chapter
Section Page Date Section Page Date
Subject Subject

SUPPLEMENTS 9.10-1 Feb 10/09


9.10-2 Feb 10/09

9.11-1 Feb 10/09


9.11-2 Feb 10/09

9.12-1 Mar 29/13


9.12-2 Feb 10/09

APPENDIXES 10-1 Feb 10/09


10-2 Feb 10/09
10-3 Feb 10/09
10-4 Feb 10/09

Mar 29/13 Page: 0 - 10


Time Limits
Chapter No. Name of Unit Effect. Type ( Dwg. No. ) Qty TBO Service Life Origin

Oct 16/19
Hours Yrs Hours Yrs

028 8. Fuel gauge transmitter LUN 1637-8 2 - - 10000 - CR

9. Fuel gauge transmitter LUN 1638-8 or LUN 1638.01-8 2 - - 10000 - CR

10. Supply box LUN 1642-8 2 - - 10000 - CR

11. Fuel gauge transmitter for a/c LUN 1649-8 2 10000 - 20000 15 CR
( of wing tip tank ) with */
WTT 25
MAINTENANCE SCHEDULE

12. Solenoid valve LUN 2474.3-8 4 - - 16000 - CR

13. Fuel pump for a/c LUN 6281-8 2 1000 - 3000 - CR


with hours hours
WTT fuel fuel
pump pump
running running
*/ After service life extention by instrument manufacturer. **/

**/ After 500 hours of the pump run, perform the test and the change of the pump sealing at the manufacturer or in
an authorized repair shop.

Page: 9.7 - 49
Time Limits
Chapter No. Name of Unit Effect. Type ( Dwg. No. ) Qty TBO Service Life Origin

Oct 9/09
Hours Yrs Hours Yrs

028 14. Discharge valve LUN 7350-8 2 10000 10 20000 20 CR

15. Fuel valve LUN 7370-8 2 on condition 20000 - CR

16. Cock 25 LUN 7376-8 2 10000 10 20000 20 CR

17. Non-return valve 16 LUN 7581.02-8 2 on condition 20000 - CR

18. Non-return valve 10 LUN 7581.04-8 6 on condition 20000 - CR


MAINTENANCE SCHEDULE

19. Non-return valve 10 LUN 7581.05 2 on condition 20000 - CR


10 LUN 7581.05-8

20. Fuel filter LUN 7691.XX-8 2 10000 10 20000 20 CR

21. Fuel tank filler cover for a/c LUN 7783-8 2 10000 10 20000 20 CR
with
WTT

Page: 9.7 - 50
Time Limits
Chapter No. Name of Unit Effect. Type ( Dwg. No. ) Qty TBO Service Life Origin

Dec 20/13
Hours Yrs Hours Yrs

032 32. Main landing gear wheel K 38-1100-7 2

33. Brake K 38-1200-7 2 - - 9000 - CR


landgs

34. Nose landing gear wheel K 39-1100-7 1

35. Main landing gear tyre MITAS 2 - - - 10 CR


720 x 310 model 3
or
model 4
or USA
29 x 11.00-10 P/N 110T01-1
MAINTENANCE SCHEDULE

GOODYEAR

36. Nose landing gear tyre MITAS 1 - - - 10 CR


550 x 225 model 4
or USA
9.00-6 P/N 906T06-1
GOODYEAR

Page: 9.7 - 69
Time Limits
Chapter No. Name of Unit Effect. Type ( Dwg. No. ) Qty TBO Service Life Origin

Oct 16/19
Hours Yrs Hours Yrs

032 37. Non-return valve 674 500 B ( 8 ) 1 on condition 20000 - CR

38. Non-return valve 674 600 B ( 8 ) 2 on condition 20000 - CR


MAINTENANCE SCHEDULE

Instruments used also in other chapters:

032 39. Horn H1(8) 2 - - 20000 - CR


034 ( Dwg.No. L 410.7120-1203
or
B 712 137 N )

Page: 9.7 - 70

You might also like