This vibration analysis report is for equipment RO # 06 HPP dated 31-01-2023. The report indicates the equipment is showing normal behavior with maximum vibration amplitudes of 3.7 mm/s recorded at the pump non-drive end, which is below the alarm limit of 7.0 mm/s. The equipment was commissioned on 09-08-2021 and previously aligned on 05-06-2022.
This vibration analysis report is for equipment RO # 06 HPP dated 31-01-2023. The report indicates the equipment is showing normal behavior with maximum vibration amplitudes of 3.7 mm/s recorded at the pump non-drive end, which is below the alarm limit of 7.0 mm/s. The equipment was commissioned on 09-08-2021 and previously aligned on 05-06-2022.
This vibration analysis report is for equipment RO # 06 HPP dated 31-01-2023. The report indicates the equipment is showing normal behavior with maximum vibration amplitudes of 3.7 mm/s recorded at the pump non-drive end, which is below the alarm limit of 7.0 mm/s. The equipment was commissioned on 09-08-2021 and previously aligned on 05-06-2022.
This vibration analysis report is for equipment RO # 06 HPP dated 31-01-2023. The report indicates the equipment is showing normal behavior with maximum vibration amplitudes of 3.7 mm/s recorded at the pump non-drive end, which is below the alarm limit of 7.0 mm/s. The equipment was commissioned on 09-08-2021 and previously aligned on 05-06-2022.
Vibration Limit for this Equipment – Velocity in mm/Sec(RMS)
STATUS NORMAL ALERT ALARM LIMIT 4.5 4.5 to 7.0 Above 7.0 EQUIPMENT SPECIFICATION DESCRIPTION DRIVE DRIVEN MOUNTING Y/N Rated speed 3300 3300 At Ground N Power rating 1900kW On Rigid Concrete Y HZ 55 Above Ground level Y On Steel Structure Y Equipment details ABB Duchting AMPLITUDES AND HEALTH CONDITION Velocity – RMS[mm/s] Location Health Condition A T R Motor Non Drive End 1.7 2.6 0.7 Motor Drive End 0.6 1.2 0.8 Pump Drive End 0.7 1.2 0.7 NORMAL Pump Non Drive End 3.7 0.6 0.6 Observation: Equipment indicating a “NORMAL” behavior with the maximum vibration amplitudes of 3.7 mm/s recorded in Pump non Drive End.
Analysis: Note: Unit commission on 09-08-2021 Previously Alignment done on 05-06-2022