Questions to Ask

You are informed by your lead/manager of a new project being assigned to you. As part of your preparation to move in
to the project ask the following questions.

What is the Project Background?


· Is this a new project or product enhancement?
Ans:
· What is the project? What is the intended benefit from the application?
Ans:
· What is the existing System/Process (Manual/Application)?
Ans:
· What is the proposed system/Application
Ans:
· How this product help the business
Ans:
· What are the critical success factors for this project?
Ans:
· Who are the stakeholders for the change process?
Ans:

What are the Roles/Users for the Application & Project?


· Intended Users and different roles in application
Ans:
· Prepare User Matrix (accesses & restrictions)
Ans:

Process
· When is the Project Kick Off meet?
Ans:
· Who are the developers?
Ans:
· Who are the Business Analysts?
Ans:
· Who is the Project Manager?
Ans:
· Who is the Process Consultant?
Ans:
· Who is the Product Manager?
Ans:
· What is the project Name in Jira?
Ans:
· What is the current Project/Test schedule?
Ans:
· How is the signoff process? Are all documents signed off and available on TFS?
Ans:
· What are the identified risks and issues and known issues with the application?
Ans:
· What are the dependencies, assumptions and constraints?
Ans:
· Sign off procedure for Testing Documents (Schedule/Test Plan/Reports/Test Conditions/)
Ans:
· Level of test coverage - Requirement Traceability Matrix
Ans:
· Is Usability audit required?
Ans:
· What are the entry and exit criteria for system test?
Ans:
· What are the deliverables as part of each release?
Ans:
· What is system test completion criteria
Ans:
· How and to whom should the daily test progress report is sent? Insist on constant interactions from the very
beginning.
Ans:

ITS Testing MENA Page 1


Questions to Ask

Are all Documents available, well documented and signed off?


· Is Vision and Scope signed off?
Ans:
· Detailed Business Requirement, System Requirement, Use Case Documents base lined?
Ans:
· System Design document available?
Ans:
· Test Plan Document prepared / approved?
Ans:
· Application Prototype / Screen Shots/Wire frame available
Ans:
· Other documents pertaining to process & functionality
Ans:

What is the Application Technology & Testing Methodology


· What is the technology used for developing the application?
Ans:
· Does the current application interface with other systems?
Ans:
· Operating environments and other compatibility needed?
Ans:
· Is design document prepared, what is the architecture of this system
Ans:
· Is there anything specific that the testing team should know prior to test design and run?
Ans:
· Is test data required / prepared for test execution?
Ans:
· Is any data prerequisite required to start system testing
Ans:
· Is the V Model of testing followed in the current project? Any deviations?
Ans:
· Are UAT Scenarios identified and available? How long is UAT Planned for and when?
Ans:
· Is there any language specific requirements?
Ans:
· Is there any non-functional requirements like usability, localization, browser / OS compatibility
Ans:
· What are the requirements with respect to application availability and response time?
Ans:
· What is the size of regression pack that can be reused?
Ans:

Defect Management
· Is any deviation in defect management process?
Ans:
· Defects assigned to whom?
Ans:
· Who will validate rejected defects?
Ans:
· How are ‘Not Required’ and ‘Not a bug’ defects managed?
Ans:
· How and to whom should the daily test progress report is sent?
Ans:
· Conduct defect triage meet and document MoM
Ans:

Several of the above questions may not get immediate answers, and you would have already started with your system
study. Don’t worry; the following questions will guide you to a better understanding of the system.
But ensure that you have answers for all the questions before moving in to the Test Execution Phase

ITS Testing MENA Page 2


Questions to Ask

General Application Information


· Do we have a milestone plan? What are the dates for GO LIVE! System Test Sign off, UAT etc.
Ans:
· Are there multiple phases prior to go live?
Ans:
· What are the types of test planned other than system test? Compatibility, Usability etc
Ans:
· What are all my responsibilities and effort available?
Ans:
· Who all are worked in this project earlier?
Ans:
· Are there any special training’s required for this project?
Ans:
· What is the percentage of regression pack that can be reused?
Ans:

Are Reports generated by the application? If yes,


· Identify intended recipients – customer/ internal
Ans:
· Check format (XL/ Adobe/ etc) and analyse implications.
Ans:
· Check compatibility (if used by external applications)
Ans:
· Report formats (alignment, spacing, colour, font, titles etc)
Ans:
· Validate Field Data (populated from application)
Ans:
· Check spelling & grammar
Ans:
· Check the printouts (as mentioned above)
Ans:
· Is the report layout as agreed?
Ans

Test Data and Test Bed Preparation?


§ How is the test bed planned? Access restrictions, application availability, database, speed etc?
Ans:
§ Identify need for Test Data.
Ans:
§ Do I need to prepare Test Data?
Ans:
§ Analyse, Create and Manage Test data.
Ans:
§ Is any data set required to state sanity test.
Ans: