Facility Name:
Address:
Phone Number:
Fax Number: Type(s) of Molding Processes at this Facility:
Process Table A
Number of Molding Employees at this Facility: Injection Molding
Process Table E
Transfer Molding
Process Table F
Extrusion
Process Table G
Equipment
Process Table H
Part Inspection & Testing
Personnel Contacted:
Name: Title: Phone:
Auditors/Assessors:
Name: Company: Phone:
lity:
Email:
Email:
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Question
Number Question Requirements and Guidance
Are all molding related internal and The molder should have a documented process and system for
external best practices documented maintaining best practices obtained through lessons learned or
1.6 and maintained? from industry knowledge.
The analysis of products and processes over time can yield vital
information for defect prevention efforts.
The molder shall have a system to collect, analyze, and react to
product or process data over time.
Methods of analysis shall include ongoing trend or historical
data analysis of special product or process
Does the molder collect and parameters/characteristics. The molder shall determine which
1.9 analyze data over time, and react to parameters/characteristics to include in such analysis. All
this data? Are records available? process control and testing records must be retained for a
minimum of one calendar year after the year in which they were
created.
Are internal assessments being The molder shall conduct internal assessments on an annual
completed on an annual basis, at a basis, at a minimum, using the AIAG Molding System
minimum, incorporating AIAG Assessment. Concerns shall be addressed in a timely manner.
1.10 Molding System Assessment?
Does the Quality Department The quality management system shall include a process for
review, address, and document documenting, reviewing, and addressing customer concerns
customer and internal concerns? and any other concerns internal to the molder. A disciplined
1.12 problem solving approach shall be used.
Is there a continual improvement The molder shall define a process for continual improvement for
plan applicable to each process each molding process identified in the scope of the Molding
defined in the scope of the System Assessment. The process shall be designed to bring
assessment? about continual improvement in quality and productivity.
Identified actions shall be prioritized and shall include timing
1.13 (estimated completion dates). The molder shall show evidence
of program effectiveness.
1.14 Does the Quality Manager or The Quality Manager or designee is responsible for authorizing
designee authorize the disposition and documenting appropriate personnel to disposition
of material from quarantine status? quarantine material.
Is there a responsibility matrix to The molder shall maintain a responsibility matrix identifying all
ensure that all key management key management and supervisory functions and the qualified
and supervisory functions are personnel who may perform such functions. It shall identify both
performed by qualified personnel? primary and secondary (backup) personnel for the key functions
(as defined by the molder). This matrix shall be readily
1.17 available to management at all times.
Has the molder developed a critical The molder shall develop and maintain a critical spare parts list
spare parts list, and are the parts and shall ensure the availability of such parts to minimize
1.19 available to minimize production production disruptions.
disruptions?
CQI-23
ocesses: Molding System Assessment
Version 1, 3/2014
Assessment
Needs Immediate
Objective Evidence N/A Satisfactory Not Satisfactory Action
Question
Number Question Requirements and Guidance
Is molder using adequate FIFO There shall be a procedure that ensures a FIFO system is
system for material and product? utilized.
2.3
Is there a system to identify trap The molder shall have documented procedures to identify and
points in the entire process to monitor trap points for each process/equipment. Monitoring of
reduce risk of mixed parts potential trap points shall occur for every part changeover.
2.6 (inappropriate, unfinished or
improperly molded parts)?
Containers handling customer product shall be free of
inappropriate material. After emptying and before re- using
containers, containers shall be inspected to ensure that all parts
and inappropriate material have been removed. The source of
Are containers free of inappropriate inappropriate material shall be identified and addressed. This is
2.7
material? to ensure that no nonconforming molded parts or inappropriate
material contaminate the finished lot.
Is the handling, storage and The molder's in-process handling and shipping process shall be
packaging adequate to preserve assessed for risk of part damage or other quality concerns.
2.9 product quality?
Are process control parameters Process control parameters shall be monitored per frequencies
monitored per frequencies specified specified in Process Tables. Computer monitoring equipment
in Process Tables? with alarms and alarm logs satisfy the verification requirement.
2.11 A designated floor person shall verify the process parameters.
Are out of control/specification There are documented reaction plans to both out of control and
parameters reviewed and reacted out of tolerance process parameters.
2.12 to? There is documented evidence that reaction plans are followed.
Assessment
Needs Immediate
Objective Evidence N/A Satisfactory Not Satisfactory Action
Process #1:
Process #2:
What are the product inspection requirements? 1.5 Each part may have one or more requirements deter
3.6 2.13 requirement. List each requirement below and valida
2.14 (Listed below are some examples)
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.4 Requirement: Flash
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
3.6.5 Requirement: Dimension
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.6 Requirement: Appearance
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.7 Requirement: Customer Specific
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
1.4
1.6
2.2
3.7 Were appropriate process steps signed off? 2.3
2.11
Were all inspection steps, as documented in the 1.2
Control Plan performed? 1.4
3.8
3.9 1.2
Were steps/operations performed that were not 1.4
documented in the Control Plan? 1.6
Packaging Requirements
2.6
3.15 Are packaging requirements identified? 2.7
2.9
Shipping Requirements
N/A
N/A
or more requirements determined by the molding specification. Parts must meet each
equirement below and validate.
examples)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Related
Molding
Item # System Category/Process Steps Type of Control
Assessment
Question #
Minimum Requirement
A2.1 1.4 Stock rotation system in place for First in/First out (FIFO) and shelf- life Automatic/Manual
2.3
2.11
2.12
1.4
A2.2 2.11 Environment temperature controlled Automatic
2.12
1.4 Handling of partial containers to ensure no contamination (closed
1.6 container, clean environment)
A2.3 2.7 Automatic/Manual
2.11
2.12
1.4
1.6
A2.4 2.7 Partial container quantity Automatic/Manual
2.11
2.12
1.4
A3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
2.12
1.4
A3.2 2.11 Dryer time per resin manufacturer guidelines (per material) Manual
2.12
1.4
A3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual
2.12
1.4
A3.4 2.11 Dew point Automatic
2.12
1.4
A3.5 2.11 Moisture analysis, if applicable, per Resin Manufacturer Guidelines Manual
2.12
A4.1 1.4 Recycle ratio (per print, inspection standard or manufacturer Automatic
1.11 guidelines). Verified by feed pressure, weight or volume
2.11
2.13
A4.2 1.4 Dedicated regrind equipment or cleaning procedure in place Manual
1.11
2.11
2.12
A4.3 1.4 Fines management (de-dusting) Automatic/Manual
1.11
2.11
2.12
A4.4 1.4 Move regrind to IMM (contamination) Automatic/Manual
1.11
2.11
2.12
1.4
A5.1 2.11 Pigment blending - percent loading, if applicable Automatic/Manual
2.12
1.4
A5.2 2.11 Color change procedure Manual
2.12
A6.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
A6.2 1.4 Production plan (machine, mold, materials, part style) Manual
1.15
2.11
2.12
A6.3 1.4 Startup check (verify process settings against setup sheet) Manual
1.15
2.11
2.12
A6.4 1.4 Startup check - Secondary Equipment (De-gate, assembly equipment, Manual
1.15 welders, etc.)
2.11
2.12
A6.5 1.4 Mold surface temperature Automatic/Manual
1.15
2.11
2.12
A6.6 1.4 Plastication - Temperature (barrel, nozzle, hot manifold if applicable), Automatic
1.15 screw RPM, and back pressure
2.11
2.12
A6.7 1.4 Plastication - Melt temperature N/A
1.15
2.11
2.12
A6.8 1.4 Plastication - Screw recovery time N/A
1.15
2.11
2.12
A6.9 1.4 Fill - Screw velocity or velocity profile Automatic
1.15
2.11
2.12
A6.10 1.4 Fill - Fill time and peak pressure N/A
1.15
2.11
2.12
A6.11 1.4 Hold - Hold pressure and hold time Automatic
1.15
2.11
2.12
A6.12 1.4 Hold - Cushion N/A
1.15
2.11
2.12
A6.13 1.4 Hold - Cavity pressure (if applicable) N/A
1.15
2.11
2.12
A6.14 1.4 Temperature Control Cooling - Coolant inlet temperature and cooling Automatic
1.15 time
2.11
2.12
A6.15 1.4 Part weight (if applicable) Manual
1.15
2.11
2.12
A6.16 1.4 First piece approval Manual
1.15
2.11
2.12
A6.17 1.4 Material purge/evacuation of barrel - included in unplanned and Manual
1.15 downtime procedures
2.11
2.12
A6.18 1.4 Shut down procedures Manual
1.15
2.11
2.12
1.4
A7.2 2.11 Dimensions Manual
2.12
1.4
A7.3 2.11 Appearance (vs. boundary sample or per instruction) Manual
2.12
1.4
A7.4 2.11 Physical properties (if applicable) Manual
2.12
B2.1 1.4 Stock rotation system in place for First in/First out (FIFO) and shelf- life Automatic/Manual
2.3
2.11
2.12
1.4
B2.2 2.11 Environment temperature and humidity controlled (if applicable) Automatic
2.12
1.4 Partial container handling to ensure no contamination (closed container,
1.6 clean environment)
B2.3 2.7 Automatic/Manual
2.11
2.12
1.4
1.6
B2.4 2.7 Partial container quantity Automatic/Manual
2.11
2.12
3.0 Material Drying (If Applicable)
1.4
B3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
2.12
1.4
B3.2 2.11 Drying time per resin manufacturer guidelines (per material) Manual
2.12
1.4
B3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual
2.12
1.4
B3.4 2.11 Dew point Automatic
2.12
1.4
B3.5 2.11 Moisture content Manual
2.12
B4.1 1.4 Recycle ratio (per print, inspection standard or manufacturer Automatic
1.11 guidelines). Verified by feed pressure, weight or volume. No regrind of
2.11 fluorine-treated parts.
2.13
B4.2 1.4 Regrind equipment (dedicated or cleaning procedure in place) Manual
1.11
2.11
2.12
B4.3 1.4 Ethylene Vinyl Alcohol (EVOH) particle size and distribution Manual
1.11
2.11
2.12
B4.4 1.4 Fines management (de-dusting) Automatic/Manual
1.11
2.11
2.12
B4.5 1.4 Prevention of contamination when transporting or feeding regrind to the Automatic/Manual
1.11 blow mold machine
2.11
2.12
1.4
B5.1 2.11 Pigment blending - percent loading Automatic/Manual
2.12
1.4
B5.2 2.11 Color change procedure Manual
2.12
B6.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
B6.2 1.4 Production plan (machine, mold, materials, part quantity) Manual
1.15
2.11
2.12
B6.3 1.4 Environment temperature for parison Automatic
1.15
2.11
2.12
1.4 Verify molding machine settings including but not limited to barrel and
1.15 die/head temperature settings, parison thickness or thickness profile,
B6.4 2.11 pre-blow pressure and time, blow air pressure and time, mold close Manual
2.12 speed and clamp pressure
B6.5 1.4 Verify secondary equipment Manual
1.15
2.11
2.12
B6.6 1.4 Cooling water temperature and flow rate Automatic/Manual
1.15
2.11
2.12
B6.7 1.4 Verify post mold cooling temperature or pressure and time Manual
1.15
2.11
2.12
B6.8 1.4 First piece approval Manual
1.15
2.11
2.12
B6.9 1.4 Material purge/evacuation of barrel Manual
1.15
2.11
2.12
B6.10 1.4 Shut down procedures Manual
1.15
2.11
2.12
1.4
B8.2 2.11 Wall thickness (if applicable) Manual
2.12
1.4
B8.3 2.11 Dimensions Manual
2.12
1.4
B8.4 2.11 Appearance Manual
2.12
1.4
B8.5 2.11 Physical properties (if applicable) Manual
2.12
B8.6 1.4 Layer thickness and thickness uniformity - (multi-layer only) Manual
2.11
2.12
B8.7 1.4 Pinch-off integrity Manual
2.11
2.12
C2.1 1.4 Stock rotation system in place for First in/First out (FIFO) and shelf- life. Automatic/Manual
2.3
2.11
2.12
1.4
2.11
C2.2 2.12 Environment contamination (dust) controlled (if applicable) Automatic/Manual
1.4
1.6
2.7
C2.3 2.11 Environment humidity and temperature controlled (if applicable) Automatic
2.12
1.4
1.6
2.7
C2.5 2.11 Plastic Sheet Stacking Manual
2.12
C3.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
C3.2 1.4 Production plan (machine, mold, materials, part quantity) Manual
1.15
2.11
2.12
C3.3 1.4 Startup check (verify process settings against setup sheet) Automatic / Manual
1.15
2.11
2.12
C3.5 1.4 Sheet heating time and temperature (heating cycle, intensity) Manual
1.15
2.11
2.12
C3.7 1.4 Sheet forming temperature per film supplier guidelines Automatic/Manual
1.15
2.11
2.12
C3.11 1.4 Plug temperature, start time and speed (if applicable) Automatic
1.15
2.11
2.12
C3.12 1.4 Sheet pre-stretching sequence and time (if applicable) Automatic
1.15
2.11
2.12
C3.13 1.4 Vacuum level, start time, evacuation speed and duration Automatic
1.15
2.11
2.12
C3.14 1.4 Pressure level, start time and duration (if applicable) Automatic
1.15
2.11
2.12
1.4
2.11
C4.1 2.12 Dimensions Manual
1.4
2.11
C4.2 2.12 Appearance (vs. boundary sample or per instruction) Manual
1.4
2.11
C4.3 2.12 Physical properties (if applicable) Manual
D1.1 1.4 Incoming material assessment procedure, covering onsite testing or Manual
2.1 acceptance of supplier testing, with criteria (i.e., melt flow, specific
2.13 gravity, temperature recording).
D2.3 1.4 Glass fiber distribution and density verification(for SMC). Manual
2.1
2.13
1.4 Using a FIFO (First In - First Out) system for compound/preform, shelf
2.11 life storage.
D3.1 2.12 Manual
1.4 Compound floor time (e.g.., sheet rolls in SMC and rubber compound).
2.11
D3.3 2.12 Manual
D3.4 1.4 Prevention of contamination by lubricants such as silicone, mold release Manual
2.11 such as calcium carbonate or oil from the pressurization system.
2.12
1.4
2.11
D3.6 2.12 Sheet shrinkage confirmation (for SMC) Manual
D4.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
D4.2 1.4 Production plan (machine, mold, materials, part style) Manual
1.15
2.11
2.12
D4.3 1.4 Startup check (verify process settings against setup sheet) Manual
1.15
2.11
2.12
D4.10 1.4 Post molding cooling (for SMC) - prevent deformation Manual
1.15
2.11
2.12
1.4
2.11
D5.2 2.12 Dimensions Manual
1.4
2.11
D5.3 2.12 Appearance Manual
1.4
2.11
D5.4 2.12 Physical properties (if applicable) Manual
E1.1 1.4 Incoming material assessment procedure, covering onsite testing or Manual
2.1 acceptance of supplier testing, with criteria (i.e., melt flow, specific
2.13 gravity, temperature recording).
1.4 Purging all equipment and feeding system to avoid cross contamination.
2.1
E2.1 2.13 Manual
1.4
2.11
2.12
E3.1 Stock rotation system in place for First in/First out (FIFO) and shelf- life. Automatic/Manual
1.4
2.11
E3.2 2.12 Environment temperature and humidity for storage (if applicable). Automatic
1.4 Temperature control during shipment from material supplier to cold
2.11 storage area in plant (if applicable i.e.; one part epoxies).
E3.3 2.12 Automatic
1.4
2.11
2.12 Material container remains sealed during warm up to room temperature
E3.4 Manual
(supplier recommendation).
1.4 Time exposed to room temperature when removed from cold storage
2.11 area for production. Allowable usage time after room temperature is
2.12 reached.
E3.5 Automatic/Manual
E4.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
E4.2 1.4 Production plan (machine, mold, materials, part style) Manual
1.15
2.11
2.12
E4.3 1.4 Startup check (verify process settings against setup sheet) Manual
1.15
2.11
2.12
E4.4 1.4 Mold cavity temperatures; variation between each cavity and set Automatic
1.15 temperatures
2.11
2.12
E4.6 1.4 Plasticization - Temperature (resin chamber), Transfer Speed, and Automatic
1.15 Transfer Pressure
2.11
2.12
E4.7 1.4 Fill - Fill time and peak pressure Automatic
1.15
2.11
2.12
E4.13 1.4 Pre-heat of resin pellets or compound - If applicable (per manufacturers Automatic
1.15 recommendations)
2.11
2.12
1.4
2.11
E5.2 2.12 Dimensions Manual
1.4
2.11
E5.3 2.12 Appearance (vs. boundary sample or per instruction) Manual
1.4
2.11
E5.4 2.12 Physical properties (if applicable) Manual
1.4 Stock rotation system in place for First in/First out (FIFO) and shelf- life
F2.1 2.11 Automatic/Manual
2.12
1.4
F2.2 2.11 Environment temperature and humidity controlled (if applicable) Automatic
2.12
F2.3 1.4 Partial container handling to ensure no contamination (closed container, Automatic/Manual
1.6 clean environment)
2.11
2.12
F2.4 1.4 Partial container quantity Automatic/Manual
1.6
2.11
2.12
1.4
F3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
2.12
1.4
F3.2 2.11 Dryer time per resin manufacturer guidelines (per material) Manual
2.12
1.4
F3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual
2.12
1.4
F3.4 2.11 Dew point Automatic
2.12
F4.1 1.4 Recycle ratio (per print, inspection standard or manufacturer Automatic
1.11 guidelines). Verified by feed pressure, weight or volume.
2.11
2.13
F4.2 1.4 Regrind equipment (dedicated or cleaning procedure in place) Manual
1.11
2.11
2.12
F4.3 1.4 Fines management (de-dusting) Automatic/Manual
1.11
2.11
2.12
F4.4 1.4 Prevention of contamination when transporting or feeding regrind to the Automatic/Manual
1.11 extrusion machine.
2.11
2.12
1.4
F5.1 2.11 Pigment blending - percent loading Automatic/Manual
2.12
1.4
F5.2 2.11 Color change procedure Manual
2.12
F6.1 1.4 There shall be a standardized startup procedure/checklist that defines Manual
1.15 things to do at start-up
2.11
2.12
F6.2 1.4 Production plan (machine, mold, materials, part quantity) Manual
1.15
2.11
2.12
F6.3 1.4 Verify molding machine settings including but not limited to barrel and Manual
1.15 head/die temperature settings, screw speed, screw cooling temperature
2.11 (if applicable), as well as settings for down stream processes
2.12
F6.4 1.4 Verify secondary equipment Manual
1.15
2.11
2.12
F6.5 1.4 Mold surface temperature Automatic/Manual
1.15
2.11
2.12
F6.6 1.4 Extrusion Head Pressure Automatic
1.15
2.11
2.12
F6.7 1.4 Vacuum level (if applicable) Automatic
1.15
2.11
2.12
F6.8 1.4 Coolant inlet temperature (if applicable) Automatic
1.15
2.11
2.12
F6.9 1.4 First piece approval Manual
1.15
2.11
2.12
F6.10 1.4 Material purge/evacuation of barrel - included in unplanned and Manual
1.15 downtime procedures
2.11
2.12
F6.11 1.4 Shut down procedures Manual
1.15
2.11
2.12
1.4
2.11
F7.1 2.12 Thickness Manual
1.4
2.11
F7.2 2.12 Layer thickness/thickness uniformity (multi-layer only) Manual
1.4
2.11
F7.3 2.12 Layer adhesion (multi-layer only) Manual
1.4
F7.4 2.11 Dimensions Manual
2.12
1.4
F7.5 2.11 Appearance (vs. boundary sample or per instruction) Manual
2.12
1.4
F7.6 2.11 Physical properties (if applicable) Manual
2.12
Observation/
Comments
Type of Control Monitoring Frequency
(Pass / Fail /
Actual Condition Minimum Requirement Actual Condition N/A)
- Injection Molding
Continuous monitoring by
controller or manual
verification daily
Continuous
Per Container
Continuous monitoring by
controller
Material change
Continuous monitoring by
controller
Material change
Continuous
Continuous if automatic, or at
start-up and after down time
event
Continuous
Start-up
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
B - Blow Molding
Continuous monitoring by
controller or manual
verification daily
Continuous
Per container
Start-up and continuous by
controller
Material change
Continuous by controller
Material change
Start-up
Material change
At color change
Continuous by controller or
manual verification daily
Continuous if automatic, or at
start-up and after down time
event.
Start-up
Continuous
Continuous
Continuous
C - Vacum Forming
Continuous by controller or
manual verification daily
Continuous by controller or
manual verification daily
Continuous
Continuous
At start-up
At start-up
Compression Molding
Hourly
Continuous
Each cycle
Each cycle
Each cycle
Continuous
Continuous
Each cycle
- Transfert Molding
Continuous monitoring by
controller or manual
verification daily
Continuous monitoring (i.e., by
chart recorder)
Continuous monitoring by
controller or manual
verification
Continuous
Per Container
At start-up
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
Continuous
LE F - Extrusion
Continuous monitoring by
controller or manual
verification daily
Continuous
Per Container
Material change
Continuous by controller
Material change
Material change
At color change
Continuous if automatic, or at
start-up and after down time
event.
Calibration /
Certification
Frequency * Included in Preventative
Verification Frequency Comment
Maintenance Plan
Related Molding
System
Item # Assessment Category/Process Steps Monitoring Frequency
Question #
1.0 General
Dimensions
Appearance
Performance
1.4 Procedures are in place to prevent damage to the finish or part during the inspection
H1.1 2.9 and packaging processes 100%
H1.2 1.4 Appearance (flash, color and gloss, short shots, splay/burns, blister, sink marks, gate
vestige, and other molding defects) of the molding shall be verified per specification and First off by quality and 100% by
applications manual operator
H1.3 1.4 Cracks, Weld line/Knit lines, and Whitening/ stress mark First off and last off
H1.6 1.4 Dimensional check (e.g., Go-no go, Plug and Ring gage) First off and once per shift
H1.8 1.4 General - Weight, Resin, Components, Porosity/Voids (if applicable) First off
PT H 79 of 79
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
79