Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MIRACLE CABLE S (I NDIA) PVT.

LTD
Checklist for Equipment I n s p e c t i o n
Project Name Location:
Checklist no…………. Date:
Make: Model:
MCIPL Hired: Contractor Name:
Equipment Name & Number: Ele ctric Ge ner ator Eqp no-

Note: Ple ase wrote Yes or No In the given box and If some comments write In remark column .
S.no Description Yes No Remarks
1. Guard provided for any rotating parts
2. Hot surface is provided with guard.
3. Rubber mat is provided in operator standing area (around the D.G)
4. No oil leakage from the oil tank & other parts of the mic
5. Wheel stopper in case of vehicle mounted D. G
6. Proper access to the DG control panel
7. Exhaust smoke pipe faced upwards & outside of D.G shelter.
8. Dip tray for any oil leakage.
9 Drive belt is in good condition (any cut dent or damage)
10 Adequate ventilation in case of indoor generator
11 Presence of fire extinguisher (ABC type)
12 Presence of damage free operating switch, Voltage and temperature
meter, circuit breaker level indicator, Emergency switch
13 Earthing is provided with standard earthing pit
14 In case of mobile gen set, confirmation of in bull acoustic system (If
sound is more than 85 dB)

FIT PARTIALLY FIT UNFIT


Inspected By Reviewed By
Name: Name:
Signature & Date: Signature & Date:

You might also like