Coiled Tubing Services

Well Name: Ru-004


Field: South Rumaila
Date: 01-03-2014 / 04-03-2014
Acid Clean Out
__________________________________________________________

Post Job Report


__________________________________________________________

Prepared for:

Baha Tamir
ROO WS Deputy Manager

George Kardan / Mark Fothergill


Non Rig Intervention Manager
Coiled Tubing Operation
Ru-004 Post Job Report

Contacts

Name Position Office Cell e-mail


OILSERV
Aamer Ahmed Field Engineer +964 770 258 8821 aahmed@oilserv.com
Adrian Quijano Technical Engineer +964 780 914 7629 aquijano@oilserv.com
Azzedine Abd Operations Manager +964 780 9137378 aazzedine@oilserv.com

Financial Information

Contract Number:

AFE/Purchase Order:

Reviews and Approvals

Name (please print) Position Signature Date


OILSERV (Note: a minimum of two OILSERV reviews required)
Azzedine Abd Ops Manager

March 10, 2014 2/6


Coiled Tubing Operation
Ru-004 Post Job Report

Table of Contents

Contents
1. Overview .......................................................................................................................... 4
4. Job execution and analysis ................................................................................................ 5
5. Fluid Consumption ............................................................................................................ 5
7. Daily Report...................................................................................................................... 6

March 10, 2014 3/6


Coiled Tubing Operation
Ru-004 Post Job Report

1. Overview

Job Objectives:

At Ru-004 there is a requirements to do an acid clean out to clean out fill that is covering the
perforations prior to starting the Re-perforating and N2 Lift program.
Slickline tagged the HUD at 3105m GL (3109m RTKB) which partly covers the perforation interval
at (3103.8m – 3112.96m RTKB) . A sample analysis found the fill to be 56.8% solubility in 15% HCL
accounting mainly for carbonates. Some iron oxide (magnetite). And salt content. The acid will aid
in cleaning out the fill.

Job Results:

03-March-2014

CT ran in hole from 3105m, pumping acid at rate 1 bpm , RIH CT @ depth 3113m . decrease
pumping to 0.8bpm and start pumping N2 @ rate 350 scf/min nitrified. POOH @ depth 3105m
with continue pumping nitrified at rate 0.8bpm acid with 350scf/min N2. Back to check depth,
happened tag at depth 3113m, Start POOH to surface and stop pumping water and the results
were: WHP= 50psi , WHDCP= 50 psi , WHT= 35psi , BSW= 100% @ Choke 128".

March 10, 2014 4/6


Coiled Tubing Operation
Ru-004 Post Job Report

2. Job execution and analysis

03-March-2014

Figure 1: CT depth while pumping HCL & N2

3. Fluid Consumption

HCL 15% 25 bbl


Water 248 bbl
Nitrogen 811 Gal

March 10, 2014 5/6


Coiled Tubing Operation
Ru-004 Post Job Report

4. Daily Report

See attached.