Post Job Final Report Ru-004
Post Job Final Report Ru-004
Post Job Final Report Ru-004
Prepared for:
Baha Tamir
ROO WS Deputy Manager
Contacts
Financial Information
Contract Number:
AFE/Purchase Order:
Table of Contents
Contents
1. Overview .......................................................................................................................... 4
4. Job execution and analysis ................................................................................................ 5
5. Fluid Consumption ............................................................................................................ 5
7. Daily Report...................................................................................................................... 6
1. Overview
Job Objectives:
At Ru-004 there is a requirements to do an acid clean out to clean out fill that is covering the
perforations prior to starting the Re-perforating and N2 Lift program.
Slickline tagged the HUD at 3105m GL (3109m RTKB) which partly covers the perforation interval
at (3103.8m – 3112.96m RTKB) . A sample analysis found the fill to be 56.8% solubility in 15% HCL
accounting mainly for carbonates. Some iron oxide (magnetite). And salt content. The acid will aid
in cleaning out the fill.
Job Results:
03-March-2014
CT ran in hole from 3105m, pumping acid at rate 1 bpm , RIH CT @ depth 3113m . decrease
pumping to 0.8bpm and start pumping N2 @ rate 350 scf/min nitrified. POOH @ depth 3105m
with continue pumping nitrified at rate 0.8bpm acid with 350scf/min N2. Back to check depth,
happened tag at depth 3113m, Start POOH to surface and stop pumping water and the results
were: WHP= 50psi , WHDCP= 50 psi , WHT= 35psi , BSW= 100% @ Choke 128".
03-March-2014
3. Fluid Consumption
4. Daily Report
See attached.