Professional Documents
Culture Documents
SEI For HF507S 04.02.2019
SEI For HF507S 04.02.2019
SEI For HF507S 04.02.2019
CN Engineering Section 0
SPECIAL ENGINEERING INSTRUCTION
To amend existing document: To issue a standard reference:
Change Addition Revision Work Guide Matrix/List Others
Date Prepared: Product Type: Device/Series Name: Approved: Checked: Prepared:
4/2/2019 FPC HF507S-**-01 Series
Effectivity Date: 4/2/2019 Drawing No.: n/a Rev.: n/a
P.O. No.: 4502076267 Document Affected: n/a YUJI WATANABE R. AMPONGAN / E. SALDUA M. UMALI
P.O. Qty.: 12,000 Reference Doc.: n/a Date: Date: Date:
Station/s Affected: N/A
Document Title: Training Conformance:
Manual pressing of 02#ME
Trainer/s:
Contents: Procedure on how to manually press 02#ME and checking thru Visual Inspection
Mark Umali / Eric Alarcon
Date:
Details: Production / Engineering / QC to follow below procedure for the pressing and checking of 02#ME Trainee's Name: E.N.
NG-Condition OK-Condition
1 2
Terminal side
MANUAL PRESS
Lift the unit using ceramic Hold the unit on the side,
tweezers. do not touch the
Press terminals.
lever 4
Press pin
3
Loading Jig
AREA TO BE PRESSED
2
1
Pull the lever to press the 02#me align the unit to the
loading jig.
6
5
L
NA
IGI
DEFECTS OR
CE
SPA ED
RK
CT distortion EWO
R
Tool Mark
Review Information:
Date: Result: (Revise/Extend/Obsolete) Reviewed by: Remarks: