Professional Documents
Culture Documents
Ghid Instalare - Invertor Growatt MIN 6000TL-XH
Ghid Instalare - Invertor Growatt MIN 6000TL-XH
Ghid Instalare - Invertor Growatt MIN 6000TL-XH
Quick Guide
1. Overview 3.2 Installing the BAT Input Power Cable
E Signal connector 2
L---Line L---Line
The Inverter N---Neutral N---Neutral
Side PE-Ground PE-Ground
The Inverter
Side Lock the housing Lock the housing PE
PE
NO Definition
Enable-: Connect BDC enable signal
1
port negative
The Inverter Enable+: Connect BDC enable signal
side 2 port positive
3 RS485A2:Connect Min ShineBus or Third
party monitoring equipment
The Inverter RS485B2:Connect Min ShineBus or Third
side 4 party monitoring equipment
3. Connecting Cables
5 RS485A1:Signal for meter
3.1 Installing the PV Input Power Cable
C li c k ! 6 RS485B1:Signal for meter
C li c k !
Positive metal Positive connector Pull the PV input power cable back to ensure that it is connected securely. BAT-B: Connect BDC communication RS485B
7
Cables
terminal or CANL
4~6mm² BAT-A: Connect BDC communication RS485A
8
or CANH
4~6mm²
Cables
Negative metal
termina Negative connector The Inverter Side The Inverter Side
3.5 Installing the COM Signal Cable 5. Verifying the Installation
We use 8Pin COM Port Connector as Power Control Interface(PCI) for European models or Connector as inverter DRED connection(DRM)
for Australia. 1.The Min 2500-6000TL-XH is installed correctly and securely.
2.The Monitor is installed correctly and securely.
European Australia 3.The Ground cable is connected correctly and securely.
The Inverter 4.The DC switch and all the switches connecting to the Min 2500-6000TL-XH are OFF.
RRCR side
5.The AC output power cable, PV&BAT input power cable and signal cable are connected correctly and securely.
K1 K2 K3 K4 6.Unused terminals and ports are locked by watertight caps.
1 2 3 4 5 6 7 8
C li c k !
6. Button touch operation
The Inverter
side
Touch button Description
PCI Connector
C li c k ! C li c k !
Three touch Previous menu
Unclock the housing Hold 5s Confirm country setting or Number recover defaut value
NO 1 2 3 4 5 6 7 8
7. Powering On the System
Step1: Turn on the DC switch at the bottom of the Min 2500-6000TL-XH. Step5: Single touch to switch Country, such as Newzealand.
Relay contact Relay contact Relay contact Relay contact
Function +12V GND 1 input 2 input 3 input 4 input GND Not connected
Step2: Turn on the AC switch between the Min 2500-6000TL-XH and
the power grid. Country/Area
Connect Relays common
Not connected K1- output K2- output K3- output K4- output Not connected Step3: When the OLED show ”Country/Area VDE0126”, Please Set the Newzedland
to RRCR node
country follow the below step4.
COM Port Pin Definitions- DRED connection
Step6: Press the touch key for 5s or No operation on the OLED
NO 1 2 3 4 5 6 7 8 Country/Area for more than 30S (The country of the current interface is
VDE0126 selected by default)the OLED shows Country setting is complete.
Function +12V GND DRM1/5 DRM2/6 DRM3/7 DRM4/8 REFGEN COM/DRM0
Notice: When the OLED show ”Country/Area Australia”, Please Set the country Set OK
1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources. follow the step5
2.Do not confuse the connector to the COM port and the connector to the SYS COM port.
3.The COM port Aonly provides a functional port-PCI or DRM. Country/Area Tips
Australia If the LED light is green, the system is operating normally.
4. Connecting Meter You can reset the country by “Set Country” in the submenu of “Set
Step4: Single touch to switch Country, such as N4105, Then jump to step6. parameter”.
The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter:
3 N-in /
LOAD 4 N-out AC connector & Load N
Shenzhen Growatt New Energy Co., Ltd
5 RS485A SYS COM Pin 5 RS485A1
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Bao’an District, Shenzhen, China
6 RS485B SYS COM Pin 6 RS485B1
T +86 0755 2747 1942
The following table describes how we can connect CHINT meter (DDSU666) to inverter: E service@ginverter.com
Meter Pin NO. Description Connect to Inverter W www.ginverter.com
1 L-in /
Growatt New Energy
5 6 2 L-out AC connector & Load L
Download
3 N-in / Manual
LOAD 4 N-out AC connector & Load N