1-2 Load Flow IEEE 30 Bus - Summary

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

ETAP

Project: Page: 1
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus 01 132.000 0 0 0 0 0 0 0 0 255.650 89.7 1118.2

Bus 02 132.000 0 0 16.394 9.593 0 0 0 0 178.013 91.0 895.8

Bus 03 132.000 0 0 1.957 0.979 0 0 0 0 47.752 86.9 231.3

Bus 04 132.000 0 0 0 0 0 0 0 0 45.508 86.8 220.8

Bus 05 132.000 0 0 70.215 14.147 0 0 0 0 158.080 91.5 800.9

Bus 06 132.000 0 0 0 0 0 0 0 0 70.486 81.0 359.6

Bus 07 132.000 0 0 16.862 8.061 0 0 0 0 89.132 83.2 453.3

Bus 08 132.000 0 0 21.948 21.949 0 0 0 0 50.146 78.6 256.4

Bus 09 33.000 0 0 0 0 0 0 0 0 19.990 88.0 416.1

Bus 10 33.000 0 0 3.978 1.241 0 0 0 0 19.761 87.8 417.5

Bus 11 11.000 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus 12 33.000 0 0 8.350 5.592 0 0 0 0 43.589 90.4 883.2

Bus 13 33.000 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus 14 33.000 0 0 4.482 1.156 0 0 0 0 22.727 94.8 467.7

Bus 15 33.000 0 0 5.781 1.763 0 0 0 0 17.888 94.4 372.7

Bus 16 33.000 0 0 2.571 1.322 0 0 0 0 10.698 85.4 218.4

Bus 17 33.000 0 0 6.537 4.212 0 0 0 0 7.776 84.1 159.6

Bus 18 33.000 0 0 2.226 0.626 0 0 0 0 9.292 94.7 194.9

Bus 19 33.000 0 0 6.543 2.342 0 0 0 0 6.950 94.2 146.5

Bus 20 33.000 0 0 1.506 0.479 0 0 0 0 1.580 95.3 33.4

Bus 21 33.000 0 0 11.747 7.517 0 0 0 0 13.946 84.2 297.8

Bus 22 33.000 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus 23 33.000 0 0 2.248 1.124 0 0 0 0 2.513 89.4 52.5

Bus 24 33.000 0 0 5.929 4.566 0 0 0 0 7.484 79.2 158.6

Bus 25 33.000 0 0 0 0 0 0 0 0 10.397 80.5 219.1

Bus 26 33.000 0 0 2.402 1.579 0 0 0 0 2.874 83.6 60.7

Bus 27 33.000 0 0 0 0 0 0 0 0 19.267 90.5 402.8

Bus 28 132.000 0 0 0 0 0 0 0 0 19.676 88.7 100.7

Bus 29 33.000 0 0 1.660 0.623 0 0 0 0 9.160 97.7 192.7

Bus 30 33.000 0 0 7.258 1.301 0 0 0 0 7.374 98.4 155.9

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

T1 Transformer 100.000 45.508 45.5 43.587 43.6

T5 Transformer 100.000 20.390 20.4 19.990 20.0

T6 Transformer 100.000

T8 Transformer 100.000 19.676 19.7 19.267 19.3

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Line33 183.623 89.645 -161.905 -73.996 21718.1 15648.4 100.0 86.9 13.08

Line35 45.570 23.613 -41.518 -23.591 4052.7 22.0 100.0 90.3 9.69

Line38 145.511 64.404 -144.642 -63.780 869.4 623.6 86.9 86.3 0.58

Line32 39.560 22.612 -39.494 -22.610 66.1 2.5 90.3 90.2 0.16

T1 39.494 22.610 -39.406 -18.629 88.5 3980.6 90.2 86.3 3.81

Line40 74.427 49.633 -74.148 -49.463 278.5 170.1 86.3 86.0 0.34

Line39 -57.111 -41.311 57.286 41.402 175.3 91.0 85.7 86.0 0.27

Line41 39.507 31.022 -39.418 -30.997 89.1 25.0 85.7 85.5 0.19

T5 17.604 10.289 -17.587 -9.503 17.5 785.6 85.7 84.0 1.68

Line26 17.470 9.048 -17.456 -9.081 13.7 -32.7 85.5 85.5 0.07

Line42 17.587 9.503 -17.352 -9.326 234.8 177.8 84.0 82.8 1.23

T6 0.000 0.000 0.000 0.000 84.0 84.0 0.00

Line8 11.867 7.607 -11.747 -7.517 120.2 89.9 82.8 81.9 0.89

Line11 1.507 0.478 -1.506 -0.479 1.5 -1.4 82.8 82.7 0.09

Line15 9.206 5.605 -9.142 -5.558 64.7 47.0 86.3 85.7 0.65

Line20 21.849 7.436 -21.553 -7.210 296.5 225.1 86.3 85.0 1.32

Line44 0.000 -0.003 0.000 0.000 0.0 -2.8 86.3 86.3 0.00

Line19 17.071 6.054 -16.883 -5.912 188.3 142.1 85.0 84.0 1.06

Line18 8.850 3.025 -8.799 -2.988 51.5 37.0 84.0 83.4 0.55

Line21 2.251 1.124 -2.248 -1.124 3.7 0.3 84.0 83.8 0.15

Line13 6.571 4.236 -6.537 -4.212 34.5 23.8 85.7 85.2 0.48

Line14 6.572 2.362 -6.543 -2.342 29.1 19.8 83.4 83.0 0.42

Line7 0.000 0.000 0.000 -0.003 0.0 -2.5 82.6 82.6 0.00

Line5 -5.929 -4.563 5.963 4.587 34.1 23.7 82.6 83.0 0.47

Line4 -8.371 -6.167 8.436 6.214 65.1 47.4 83.0 83.7 0.66

Line22 2.407 1.580 -2.402 -1.579 5.0 1.3 83.0 82.8 0.18

Line1 9.001 1.983 -8.950 -1.947 50.3 36.1 83.7 83.2 0.52

T8 -17.436 -8.197 17.456 9.081 19.6 883.3 83.7 85.5 1.78

Line2 7.291 1.324 -7.258 -1.301 32.9 22.8 83.2 82.7 0.41

28600.8 23086.7
ETAP
Project: Page: 4
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus 02 Bus Under Voltage 132.000 kV 114.729 86.9 3-Phase

Bus 03 Bus Under Voltage 132.000 kV 119.215 90.3 3-Phase

Bus 04 Bus Under Voltage 132.000 kV 118.999 90.2 3-Phase

Bus 05 Bus Under Voltage 132.000 kV 113.961 86.3 3-Phase

Bus 06 Bus Under Voltage 132.000 kV 113.160 85.7 3-Phase

Bus 07 Bus Under Voltage 132.000 kV 113.514 86.0 3-Phase

Bus 08 Bus Under Voltage 132.000 kV 112.906 85.5 3-Phase

Bus 09 Bus Under Voltage 33.000 kV 27.735 84.0 3-Phase

Bus 10 Bus Under Voltage 33.000 kV 27.329 82.8 3-Phase

Bus 11 Bus Under Voltage 11.000 kV 9.245 84.0 3-Phase

Bus 12 Bus Under Voltage 33.000 kV 28.494 86.3 3-Phase

Bus 13 Bus Under Voltage 33.000 kV 28.494 86.3 3-Phase

Bus 14 Bus Under Voltage 33.000 kV 28.057 85.0 3-Phase

Bus 15 Bus Under Voltage 33.000 kV 27.708 84.0 3-Phase

Bus 16 Bus Under Voltage 33.000 kV 28.280 85.7 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus 17 Bus Under Voltage 33.000 kV 28.123 85.2 3-Phase

Bus 18 Bus Under Voltage 33.000 kV 27.526 83.4 3-Phase

Bus 19 Bus Under Voltage 33.000 kV 27.388 83.0 3-Phase

Bus 20 Bus Under Voltage 33.000 kV 27.298 82.7 3-Phase

Bus 21 Bus Under Voltage 33.000 kV 27.036 81.9 3-Phase

Bus 22 Bus Under Voltage 33.000 kV 27.243 82.6 3-Phase

Bus 23 Bus Under Voltage 33.000 kV 27.657 83.8 3-Phase

Bus 24 Bus Under Voltage 33.000 kV 27.243 82.6 3-Phase

Bus 25 Bus Under Voltage 33.000 kV 27.399 83.0 3-Phase

Bus 26 Bus Under Voltage 33.000 kV 27.339 82.8 3-Phase

Bus 27 Bus Under Voltage 33.000 kV 27.615 83.7 3-Phase

Bus 28 Bus Under Voltage 132.000 kV 112.809 85.5 3-Phase

Bus 29 Bus Under Voltage 33.000 kV 27.443 83.2 3-Phase

Bus 30 Bus Under Voltage 33.000 kV 27.306 82.7 3-Phase


ETAP
Project: Page: 6
12.6.0H
Location: Date: 12-27-2021
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: IEEE30Bus Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 229.193 113.258 255.650 89.65 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 229.193 113.258 255.650 89.65 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 200.593 90.171 219.928 91.21 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 28.601 23.087

System Mismatch: 0.000 0.000

Number of Iterations: 4