SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW SPECIAL PROCESS (WELDING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
Welding Procedure
1.1 Specifications/Welding Procedure SAIC-W-2075 SAIC-W-2075 RH RH
Qualification Record (WPS/WPQR)
Receiving Inspection and Verification of S. Aramco shall verify and inspect the first batch of
2.1 Welding Consumables-(Properties, Type, SAIC-W-2081 SAIC-W-2081 H W delivered consumables, then random inspection
approve source, storage, etc.) thereafter.
Page 1 of 5
2/14/2012 2:20 PM
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4 COS 03/31/2010
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Positive Material Identification of Low Use SATR-L-2012 & SATR-L-2013 - Refer to Note 1
2.3 Alloy, Stainless Steel, Nickel & Copper SAIC-L-2010 SAIC-L-2010 H W General Notes for SA Inspection responsibility, after
Based Materials (If Required) which pre-arranged witness is agreed upon.
3.0 INSTALLATION
Welding of Strip Linings See SATIP N0: W-016-01 or other SATIP-W series as
3.2
(If Required) required
Page 2 of 5
2/14/2012 2:20 PM
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4 COS 03/31/2010
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW SPECIAL PROCESS (WELDING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
Use SATR-W-2006
W/H S. Aramco's responsibilities varies as follows:
See a) "W" - for Welding on normal services at normal
3.7 Pre-Welding Inspection SAIC-W-2085 SAIC-W-2085 H remarks conditions, refer to Note 1 of the General Notes.
& See b) "H" - for critical welds, ie.; Tie-Ins, buttering, Hot Taps,
NOTICE NDE-In-Lieu of Hydro & others as determined by project
requirements.
Use SATR-W-2007
S. Aramco's responsibilities varies as follows:
S/W
a) "S" - Generally is a surveillance activity for Saudi
See
Aramco, except in welding of stainless steel piping and
3.8 In-Process Weld Inspection SAIC-W-2086 SAIC-W-2086 W Remarks
piping in low temp service.
&
b) "W" - S. Aramco inspects and verifies Heat Input at
NOTICE
random or on routine basis for low temp service and for
stainless steel welding.
Use SATR-W-2007
3.10 Selection of Weld Joints for NDE (Tanks) SAIC-W-2088 SAIC-W-2088 H R
S. Aramco reviews on weekly basis.
Page 3 of 5
2/14/2012 2:20 PM
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4 COS 03/31/2010
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.14 Weld Repair Verification & Inspection SAIC-W-2091 SAIC-W-2091 H W/ R In conjunction with NDE Process Control Procedure
Positive Material Identification (PMI) of Use SATR-L-2012 & SATR-L-2013 - Refer to Note 1
3.16 Deposited Weld for alloyed materials SAIC-L-2010 SAIC-L-2010 H W/ R General Notes for SA Inspection responsibility, after
within the scope of SAES-A-206. which pre-arranged witness is agreed upon.
4.0 PRE-COMMISSIONING
Page 4 of 5
2/14/2012 2:20 PM
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4 COS 03/31/2010
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
1.0 DOCUMENT REVIEW SPECIAL PROCESS (WELDING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
GENERAL NOTES
NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-process, and final
inspection. Applicable weld numbers must be entered in the Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and
temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT subcontractors must complete NDT Checklists on a daily basis per above but not as an IR
with the exception of the start of NDT activities. START OF NEW WELDING ACTIVITIES IN NEW AREAS REQUIRES NOTIFICATION.
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.