School Name : Shree Pragatisheel Secondary School, Sunkoshi Ru. Mu.-03, Sindhuli Teacher Name : Samir Bastola Subject M Estimating Costing and Supervision
Marks : 100 Class : 10 ( Technical ) Period : 5 per week Total Teaching day : 180
MONTH TEACHIN UNIT/ UNIT/ ESTIMATE TEACHING EDUCATION EVALUATI CO- REMAR
G DAY CHAPTER CHAPTER D PERIOD METHOD AL ON ACTIVITI KS
DETAILS EQUIPMENT METHOD ES
BAISAKH
7.1 Density of
7-Estimating
steel and concrete
simple RCC
7.2
works
Reinforcement
details of simple
bream, lintel
Column and slab
7.3
Reinforcement
spacing, bends,
hooks and
development
length.
7.4 Estimate of 6 Lecture Drawing sheet, Class test, Site visit for
7-Estimating simple RCC method, pencil, eraser, Unit test, estimate of
ASOJ simple RCC works Group sharpner, Oral plastering,
6 works Prepare working discussion, calculator question- punning
drawing and job Questionnaire, answer, and
specification, Field visit and Home pointing
Estimate the report assignment, works,
quantity of steel presentation,
and concrete for supervision,Ca
simple beam, se study,
lintel column and Practical
slab. works,
Audio/visual
8.1 Drawing and
class, Web
specification for
surfing,
8-Estimating of plastering, Project work,
plastering, punning and
pointing works Problem
punning and
8.2 Estimate solving,
pointing works
plastering, Seminar,
punning and
pointing works.
Prepare drawing
and job
specification,
Estimate the
quantity of
plastering/
punning/ pointing
9 - Estimating of 9 Estimating of 14 Lecture Drawing sheet, Class test, Site visit for
CGI sheet roofing CGI sheet roofing method, pencil, eraser, Unit test, estimate of
KARTIK works works 9.1 Group sharpner, Oral one ,two
17 Drawing and discussion, calculator question- and multi
specification of
Questionnaire, answer, room
CGI roofing
works 9.2
Field visit and Home building
Estimate CGI report assignment,
sheet roofing presentation,
works. supervision,Ca
Prepare drawing se study,
and job Practical
specification, works,
Estimate quantity Audio/visual
of roofing sheet class, Web
surfing,
10 Estimating of Project work,
one, two and Problem
10 - Estimating of multi room solving,
one, two and building 10.1
multi room
Seminar,
Working drawing
building and specification
10.2 Estimate one
roomed building
10.3 Estimate two
roomed building.
Prepare working
drawing and job
specification,
Estimate a single
roomed building,
Estimate a double
roomed building,
Estimate a multi
roomed building
10 - Estimating of 10.4 Estimate 20 Lecture Drawing sheet, Class test, Site visit for
one, two and multi room method, pencil, eraser, Unit test, estimate of
MANGHSI 24 multi room building Group sharpner, Oral break
R building discussion, calculator question- pressure
Questionnaire, answer, tank, tap
11.1 Drawing and
Field visit and Home stand, road
specification of report assignment, pavement
11- Estimating of break pressure presentation,
break pressure tank 11.2 supervision,Ca
tank Estimate of a se study,
simple break Practical
pressure tank works,
Prepare a working Audio/visual
drawing and job class, Web
specification, surfing,
Estimate the Project work,
quantity break Problem
pressure tank solving,
Seminar,
12.1 Drawing of
12 - Estimating of tap stand 12.2
tap stand Estimate of tap
stand
Prepare a working
drawing and job
specification,
Estimate the
quantity tap
stand
13 - Estimating of 13.1 Drawing of
road pavements longitudinal and
cross section of
road
Prepare
longitudinal and
cross sectional
profile, Estimate
the earth work in
cutting and filling
15.1 NG norms
and current
15 - Rate analysis district rate 15.2
for earthwork in Define overhead,
excavation water charge,
tools and plants,
profit and vat.
15.3 Man and
material
consumption
Analyze rate for
different job
specifications as
per NG norms in
earthwork
excavation
16 - Rate analysis 16.1 Ratios of 18 Lecture Drawing sheet, Class test,
for PCC works PCC in practice method, pencil, eraser, Unit test,
MAGH 16.2 Calculation Group sharpner, Oral
of dry volume and discussion, calculator question-
wet volume of
22 Questionnaire, answer,
ingredients. 16.3
Norms and
Field visit and Home
current district report assignment,
rates presentation,
Analyze rate for supervision,
PCC works in Case study,
1:2:4 for slab, Practical
beam and works,
column. Audio/visual
class, Web
surfing,
17 - Rate analysis 17.1 Drawing Project work,
for steel and specification
reinforcement
Problem
17.2 Cutting, solving,
works bending, placing
Seminar,
and binding of
reinforcement
Analyze rate for
brick work of wall
thickness half
brick, one brick
and one and half
brick
18 - Rate analysis
for brick work 18.1 Calculation
of brick for cubic
meter work 18.2
Ratios of mortars
18.3 Norms and
current district
rates 18.4 Rate
analysis for brick
work in 1 : 6
cement sand
mortar.
Analyze rate for
brick work of wall
thickness half
brick, one brick
and one and half
brick
19 - Quotation
and tender
documents 19.1 Define
quotation and
tender 19.2
Quotation and
tender forms
Prepare Tender /
Quotation notice
and document,
Sensitize tender/
quotation award
procedure.
28.1Importance of
28 - Scheduling of
task scheduling
task
28.2Method of
preparing task
schedule.
Prepare different
task schedule
19 - Quotation 19.3 Quotation 18 Lecture Class test,
and tender and tender method, Unit test,
FALGUN documents notification 19.4 Group Oral
22 Quotation and discussion, question-
tender documents
Questionnaire, answer,
19.5 Conditions
of contract 19.6
Field visit and Home
Types of contract report assignment,
19.7 Contract presentation,
award procedure supervision,
Case study, Log book,
Practical Muster roll,
22.1Log book and works, Measurement
its uses Audio/visual book
22.2Format of log class, Web
22 -Prepare log book 22.3Site surfing,
book order book
Project work,
Problem
23.1 Definition solving,
of Muster roll Seminar,
23 - Prepare 23.2 Entry
Muster roll methods 23.3
Types of worker
23.4 Payment
process of muster
roll
Prepare Muster
roll format,
Practice on
entering the
Muster roll
24.1 Units of
different items of
24 -Measurement works 24.2
of works Methods of
measurement of
work done
Prepare Measure
works for any
construction
works
25.1Definition of
25 --Measurement measurement
book book
25.2Importance of
M.B. 25.3Size of
MB
25.4Precautions
in entering and
handling of MB
25.5Endorsement
procedure of M.B
Prepare
measurement
book, Practice on
entering data on
MB
3 27 - Basic 27.1Definition of 2 Lecture Class test,
principle of planning, method, Unit test,
CHAITRA construction organizing, Group Oral
management directing, discussion, question-
coordinating and
Questionnaire, answer,
controlling
Field visit and Home
report assignment,
presentation,
supervision,
Case study,
Practical
works,
Audio/visual
class, Web
surfing,
Project work,
Problem
solving,
Seminar,
======================================== ========================================
==========================================
PRINCIPAL c=;= ;+of]hs SUBJECT TEACHER