Professional Documents
Culture Documents
Flow 1
Flow 1
Man X X X X X X
Problem Sambal
Material X X X X X X X
Machin X X X X X X X X X X
Metode X X X X X X
Env X X X X X X X X X X X X X X X X X X X
Man X X X X X X X
Problem Nasi
Material X X X X X X X X X
Machine X X X X X X X X X X X
Metode X X X X X X X
Env X X X X X X X X X X X X X X X X X X X
Man X X X X X X
Problem Gulai
Material X X X X X X X X
Kakap
Machin X X X X X X X X X X
Metode X X X X X X
Env X X X X X X X X X X X X X X X X X X X
Problem Mie Kuwah
Man
Material
/ Rebus
Machin
Metode
Env
Man
Problem Pisang
Material
goreng
Machin
Metode
Env
Racik Masak
PROBLEM NO DEFECT
Process Handling Process Handling
3 Nasi sangit
MAN
MAN
Waranty
Basic
Item
MACHINE
MACHINE
Position
METHODE
METHODE
MATERIAL
MATERIAL
Instruction
1
Lengtg (m)
2
Mass (kg)
3
Time (s)
4
Electric (…)
Temperature
5
©
6
Article Mass
Brightness
7
(lux)
Amount of
8
Space m2)
9
Speed (m/s)
International System of Unit
10
Energy (j)
11
Heat (…)
12
Electricity (…)
13
Magnetic (…)
14
Light
Chemical
15
Resistance
Material
16
Surface
Character
17
Position
18
Timing
Another
19
Another