QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP

Page 1 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

Company Name: Newfab

Prepared &
Functional Area/SOW: Qiddiya Site Offices Lower Plateau R S Nassir H&S Manager
reviewed by:

Initial Risk Initial Risk


Hazards & Risks, Response, Precautions and Control
S/N Who Might be at Action by
associated with the L S RR Measures: L S RR
Activity
Risk?
• FM/Supervisor to conduct STARRT
briefing prior to start the work.
• Instructions given to you by the
Supervisor.
• Use the correct tools for the right job
and ensure that they are in good
condition. Safety helmet, safety shoes Project Manager/ Engineer
Hand, foot, and eye
1 2 1 2 and safety gloves other required PPE Electrical Technicians. 1 1 2 Project Supervisor
injuries
must be always worn. Follow the H&S Officer
instructions given to you by the
supervisor.
• Crews has appropriate PPE.
• Operatives must not stand in the
material hopper to release wagon
tailgates
• Operators use closed blade
(safety) knife to cut strapping
and remove shrink wrap from
box. Project Manager/ Engineer
• Internal packing removed and placed
2 Cuts, Grazes and Bruises 2 3 6 Operators/Technicians 1 3 3 Project Supervisor
inside the box and within waste bags H&S Officer
strategically placed around the site
• PV panel removed and inspected for
damage
• All packaging is segregated and placed

Page 1 of 6 Solar Lighting System


QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP
Page 2 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

within the correct waste stream


• Manually handling of loads to be
avoided where possible by using
machinery particularly for distribution
of the panels.
• Where unavoidable, no-one is to carry
anything more than they are
comfortable with and never more than
20kg. Panels are to be lifted by 2
persons onto mounting frame.
• Mechanical means available (Bobcat) to
move heavy and multiple loads
• Kinetic lifting techniques adopted, the
load must be minimal (max one steel
at a time)
• Using impact drivers the operators
hold the panel and fixe the panel to
the frame.
• The operator ensures PV panel cable
is free close to the string cable, when
PV panel is fixed correctly to the
mounting frame the Panel cable is
plugged
into the correct string cable
Sprains or strains due • Manually handling of loads to be
to handling of Steel avoided where possible by using
uprights, Pearling’s, machinery particularly for distribution
framework, string of the panels.
boxes, cable reels, • Where unavoidable, no-one is to Project Manager/ Engineer
3 Solar panels and 2 3 6 carry anything more than they are Operators/Technicians 1 3 3 Project Supervisor
other associated comfortable with and never more than H&S Officer
loads. 20kg. Panels lifted by 2 persons.
Operators preparing • Mechanical means available (Bobcat) to
steel for fixing to move heavy and multiple loads
Piles • Kinetic lifting techniques adopted, the

Page 2 of 6 Solar Lighting System


QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP
Page 3 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

Hand injuries due to load must be minimal (max one steel at


handling of panels. a time)
• Operators share the task of
collecting steel upright prior to
ramming to reduce the
repetitive task Gloves to be
worn when handling panels.
• All operators must be fully
trained/experienced to operate
bobcats/telehandlers.
• Bobcat/telehandler tested and
inspected in line with
documentation checked and
available on site.
Operators hit by • Where restrictions are apparent
vehicle Pallet falls from banksmen will be used. Project Manager/ Engineer
4 vehicle. 3 3 9 • Bobcat/Telehandler place the Operators/Technicians 1 3 3 Project Supervisor
Box is damaged during palleted box of PV panels at the end H&S Officer
transit over site of each row to assist in reducing he
distance operators unpacking and
carrying PV panels for installation.
• Telehandler transport palleted box of
PV panels to assist in reducing he
distance operators unpacking PV
panels for installation by the Panel
installers
• Suitable size machine will be used to
Damage to materials carry loads.
during movement or • Loads will be distributed along the
poor storage. Machine line to reduce the need for excessive Project Manager/ Engineer
turning over or movement.
5 3 3 9 Operators/Technicians 1 3 3 Project Supervisor
dropping loads due to • Materials to be stored in specific areas
H&S Officer
excessive weight / as agreed with Site Manager.
overloading/undermini • Storage areas to be fenced off using
ng excavations double clipped Heras fencing.
• Movement of materials around the site

Page 3 of 6 Solar Lighting System


QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP
Page 4 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

to be carried out by telehandler.


• Only competent persons are to operate
any items of mobile plant.
• Machinery must only be operated in
accordance with safety procedures.
• No-one is to approach any machine
Contact with other until they have made the driver
machinery, aware of your presence and you get
structures or people. a clear signal to approach.
Overturning of • Always be alerted to moving
Mobile Equipment plant/equipment and take the view
Unauthorized start that the driver hasn’t seen you. Project Manager/ Engineer
6 up and movement 3 4 12 • Seat belts to be always worn. Operators/Technicians 1 4 4 Project Supervisor
Parking of • All machines have amber H&S Officer
operator/visitor’s flashing lights operating unless
cars and vehicles otherwise specified by your
Fuel spillages supervisor.
Hydraulic oil leaks and • All people on foot to wear high visibility
spillages clothing.
• Machinery not left unattended, key
removed, and machine secured.
• Parking of private cars and contractors’
vehicles will take place in designated
areas.
• Refueling will only be undertaken
within a designated refueling point
within the staging area
• Spill kits will be in place and maintained
Pollution due to at the designated refueling point.
spillage. • Refueling elsewhere on site Project Supervisor
7 Health problems due 2 3 6 can only take place with the Operators/Technicians 1 3 3
H&S Officer
to contact with express permission of the
diesel. Principal Contractor Site
Manager
• A double skinned fuel tank will be used
and placed in an area as designated by

Page 4 of 6 Solar Lighting System


QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP
Page 5 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

the Site Manager.


• Drip trays will be used during refueling
operations.
• A suitable sized spill kit will be kept
adjacent to the fuel tank during
refueling.
• The fuel tank is to be kept locked at all
times when not in use.
• All Employees/Contractors briefed on
Lone working procedures, including:
• No high risk working when Project Manager/ Engineer
Injury or illness working alone.
8 3 4 12 • Constant communication with Operators/Technicians 1 4 4 Project Supervisor
without support
Security H&S Officer
• No visitors/sub-contractors work on
site alone
• Deadlines are clear and Contractors
allowed adequate time to prepare
Contractors under in line with program
tight deadlines to • Project managers ensure the
complete the works correct work
equipment/information is Project Manager/ Engineer
9 Poor or incorrect 3 3 9 Operators/Technicians 1 3 3 Project Supervisor
available to undertake the
communication and H&S Officer
task
instruction
• Work supervised effectively in a
Wrong tools for the professional manner
job • Adequate breaks are provided
• Workers/Contractors briefed correctly
on all tasks

Page 5 of 6 Solar Lighting System


QIDDIYA SITE OFFICES & WELFARE FACILITIES PROJECT LP & UP
Page 6 of 6
Risk Assessment for Solar Lighting System
Department Document Ref. No. Issue Date Revision
H&S HSE DOCS-RA-LFI-00 7-Jan-2024 00

Risk Rating
Very Low Low Medium High Very High
1-4 5 -9 10 - 15 16 - 20 20 - 25
Risk Rating = Severity (S) x Likelihood (L)

The risk assessment matrix below (TABLE 1) should be used to calculate the risk level (Likelihood x Severity). Consideration may also be given to
property damage or business risk; this can be added to the severity section as appropriate. Once the risk has been calculated the priority for action
can be set from TABLE 2.

Likelihood = L TABLE 2:
Risk Action
TABLE 1: Very May Unlikely Score
Certain (5) Likely (3) Rating
Likely (4) happen (2) (1)

No Action is required as the risk is as low as reasonably


Death (5) 25 20 15 10 5 1-4 VL practicable or any further change would/could have
negligible affect on the risk
Major Injury; severe property Action is required to reduce the risk, although low
20 16 12 8 4 5-9 L
Severity = S

damage (4) priority. Time/effort/cost should be proportional to risk.


Action required soon to control the risks. Interim
Up to 3 day injury (3) 15 12 9 6 3 10-15 M measures may be necessary in the short term.
Minor Injury (treatment off site); Stop Work - Action required urgently to control the risks.
minor property damage (2)
10 8 6 4 2 15-20 H Further resources may be needed.
Minor Injury (First Aid treatment
on site) (1)
5 4 3 2 1 20-25 VH Immediate Action

Page 6 of 6 Solar Lighting System