Professional Documents
Culture Documents
Electrical Maintenance Paper 1 2016: Max Marks: 40 Time: 2 HR 30 Min
Electrical Maintenance Paper 1 2016: Max Marks: 40 Time: 2 HR 30 Min
6. _________ fuse unit allows a predetermined time to remove the short circuit.
(a) Kit-Kat (b) H.R.C. (c) Cartridge
1. Draw neat and labeled circuit diagram of three point godown wiring.
2. Draw neat and labeled circuit diagram of Star Delta Starter.
3. Draw neat and labeled circuit diagram of single phase energy meter.
4. Draw neat and labeled circuit diagram of 3-point D.C. Shunt Motor Starter.
5. Draw conventional symbols :
(a) Siren (b) Energy Meter (c) Fan regulator (d) Star- Delta Starter
1. Explain installation process of C.T.s. Wiring system. State advantage and disadvantage of this wiring.
2. Explain with neat sketch the construction of Kit-Kat fuse Unit. State its advantages.
3. compare Overhead Line with U.G. Cable.
1. (a) What are the points to be considered before selecting wiring system.
(b) State advantage of cleat wiring and Metal conduit wiring.
2. Compare various wiring systems in tabular form.
3. (a) Compare Incandescent lamp with fluorescent Tube.
(b) Explain with neat sketch the construction of Immersion Heater. State any two common faults in
it.