PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
K FIRE FIGHTING SYSTEM
Fire Fighting System
Supply and installation of fire fighting system with all necessary
equipment,complete with controllers, valves, flexible
connectors, interconnecting piping and connection to services,
supports, hangers, etc All accessories as per local rules and
regulations as per the below details and in accordance to Building
Requirements.

Pipes for Sprinkler System: Fire fighting galvanised steel pipe and
fittings including all valves and etc., laying or fixing horizontally or
vertically with brackets, clip hangers and supports plugged and
screwed to concrete or block work. Including tie in connection to
1.00 the incoming pipe as per specifications and drawings.

1.10 25 mm 60 m 0.00 0.00


1.20 40 mm 3 m 0.00 0.00
1.30 50 mm 12 m 0.00 0.00
1.40 65 mm 8 m 0.00 0.00

Recessed Pendant Sprinklers: Supply and installation of recessed 14 No. 0.00 0.00
pendant sprinklers with all accessories and fittings as per drawings
2.00
and as per Civil Defense Requirements.

Upright Sprinklers: Supply and installation of upright sprinklers with 14 No. 0.00 0.00
all accessories and fittings as per drawings and as per Civil Defense
3.00
Requirements.

FM 200: Supply and installation of FM 200 clean agent fire fighting 1 Item 0.00 0.00
system comprising FM 200 container with manual relase lever,
slenoid valve pressure switch, pipes and FM 200 nozzles to fullfill
4.00 the requirement.
Location: IT Room

FE 36 - Automatic Dry Powder (2 kg): Supply and installation of 5 No. 0.00 0.00
Fire Suppression System (FM36) complete with steel wire bracket
5.00 Location: ATM Area, SMDB Room and Safe Room

Dry powder Fire Extinguisher (5 kg): Supply and installation of dry 2 No. 0.00 0.00
powder fire extinguisher.
6.00
Location: IT Room and Pantry

CO2 Fire Extinguisher (4.5 kg): Supply and installation of CO2 fire 2 No. 0.00 0.00
extinguisher.
7.00
Location: IT Room and Pantry

8.00 Solenoid Valve 1 No. 0.00 0.00


Programming, testing and commissioning including all necessary 1 LS 0.00 0.00
certificates, including Chemical Flushing prior to connecting to
9.00 tenant provided stubout as per Building Requirements.

Note: Contractor to coordinate with Building Management


(Landlord) for exact location of tapping, subjected any modification
required, under contractor responsibility.

L FIRE DETECTION AND ALARM SYSTEM

1 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Fire Detection and Alarm System
Supply and installation of fire detection and alarm system with all
necessary equipment and accessories as per local rules and
regulations as per the below details and in accordance to Building
Requirements.
Includes wiring and terminating the zone control valves and flow
switched to the proposed alarm system and compliant with the
Building's Fire Alarm System.

Smoke Detector: Supply and Installation of addressable ionization 7 Nos. 0.00 0.00
type Smoke Detector, including wiring and other accessories
(Included: 3 Nos. Existing for Relocation as per RCP) - Spare included
1.00

Smoke Detector with LED Indicator (Above the Ceiling): Supply 8 Nos. 0.00 0.00
and Installation of Smoke Detector with LED Indicator on the ceiling,
2.00 including wiring and other accessories along with remote indicators -
spare included

Fire Alarm 24X7 Auto Dialer: Supply and Installation of 24X7 1 No. 0.00 0.00
automatic dialer as per civil diffence requirements.
3.00

Fire Alarm Control Panel (FACP): Supply and Installation of analog 1 No 0.00 0.00
addressable type of fire alarm control panel, including all necessary
wiring and accessories (integration with main FACP)
4.00 Note: To use existing

Wall Mounted Electrical Loop Sounder: Supply and Installation of 1 No. 0.00 0.00
wall mounted electric loop sounder, including wiring and other
5.00
accessories

Break Glass Unit for Manual Call Point: Supply and Installation of 1 No. 0.00 0.00
addressable break glass unit as per specified location in the
6.00
drawings

Heat Detector: Supply and Installation of heat detector including 1 No. 0.00 0.00
7.00 wiring and other accessories

Interfacing Units: Supply and Installation of Fire alarm interfacing 5 No. 0.00 0.00
8.00 units per specified in the drawings

Programming, testing and commissioning including Fire Alarm 1 LS 0.00 0.00


9.00 Completion Certificate

Note: Contractor to check the condition of the existing fire alarm


devices for re-using

M ELECTRICAL WORKS
Electrical Works
Include for supply, installation, testing and commissioning, as
detailed in the specifications and on the drawings and to the
approval of the Engineer and all concerned Statutory Authorities
as per specifications, complete.

2 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Sub main distribution boards (SMDB-ENBD)-Supply , install and test 1 No. 0.00 0.00
metal enclosed, compartment main distribution board complete
with measuring instruments, earthing, fixing and supporting
1.00 materials and all cable glands for incoming and outgoing cables
termination.

Incomming cable and Breaker-Supply and instalation of incomming


cable and breaker complete termination modification of existing
SMDB-S2

1.10 80A 3 phase MCCB 1 No. 0.00 0.00


SMDB-S2(Existing) to SMDB-ENBD, 1X 4C X 25 mm2 XLPE /SWA/PVC LS No. 0.00 0.00
1.20 Cu. 1 X1C X 16 mm2 Y/G ECC

DISTRIBUTION PANEL BOARDS (DB): Supply , install , test and


operate distribution panel boards as shown in drawings and specs.
complete with internal busbar, supports of all incoming and
outgoing feeders and all necessary accessories and ancillary works
2.00 required for complete installation for the following panels.

DB-ENBD(Existing-Modification only) 1 No. 0.00 0.00


2.10 Location: Enterance area

DB-LED WALL 1 No. 0.00 0.00


2.20 Location: AV Rack room

DB-UPS 1 No. 0.00 0.00


2.30 Location: IT Room

KWHr Meters: Sub-Main electricity meters as per drawings and


specifications and to DEWA approval, including fixing, cabinet and
all accessories.

3.00 80/5 Amps KWhr Meter 1 No. 0.00 0.00

Cables & Terminations: Supply, install, connect and test as shown 1 LS 0.00 0.00
in drawings and specifications. Full neutral power copper cable with
stranded copper conductors with all required accessories for perfect
connection; complete with PVC ducts and any required accessories
4.00 and ancillary works required for complete installation of the
following cable's cross section area :

Conduit and Wiring: Supply and installation of conduit fixed on 1 Lot 0.00 0.00
surface or in dry walling, including fixing and terminations; conduit
drawboxes, complete with installation of approved switch socket
5.00 outlet and cover plates; wiring channel, trunking or powerskirting.

Switches: Supply and installation of approved switches, including


installation and connection of the switch and coverplate:
6.00

6.10 1 Gang 1 way 5 No. 0.00 0.00


6.30 3 Gang 1 way 1 No. 0.00 0.00

3 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Socket Outlet: Supply and installation of approved socket outlet,
including installation and connection of the outlet and coverplate:

13A Single Receptacle Outlet (450H) complete with conduiting and 8 No. 0.00 0.00
7.00 accessories, wiring, backbox, junction box

13A Single Receptacle Outlet (1200H - TBC) complete with 1 No. 0.00 0.00
8.00 conduiting and accessories, wiring, backbox, junction box

13A Single Receptacle Outlet (2350H) complete with conduiting 1 No. 0.00 0.00
9.00 and accessories, wiring, backbox, junction box

13A Double Receptacle Outlet (450H) complete with conduiting 8 No. 0.00 0.00
10.00 and accessories, wiring, backbox, junction box

13A Double Receptacle Outlet (1200H) complete with conduiting 1 No. 0.00 0.00
11.00 and accessories, wiring, backbox, junction box

13A Double Receptacle Outlet (1600H) complete with conduiting 2 No. 0.00 0.00
12.00 and accessories, wiring, backbox, junction box

13A Double Receptacle Outlet (2350H) complete with conduiting 2 No. 0.00 0.00
13.00 and accessories, wiring, backbox, junction box

13 Spur outlet connected to UPS for Sliding Door complete with 1 No. 0.00 0.00
14.00 conduiting and accessories, wiring, backbox, junction box

13A Single Outlet connected to UPS complete with conduiting and 7 No. 0.00 0.00
15.00 accessories, wiring, backbox, junction box

13A Double Outlet connected to UPS complete with conduiting and 13 No. 0.00 0.00
16.00 accessories, wiring, backbox, junction box

13A Spur Outlet complete with conduiting and accessories, wiring, 5 No. 0.00 0.00
17.00 backbox, junction box

20A SPN Isolator for signage with Timer-complete with conduiting 1 No. 0.00 0.00
18.00 and accessories, wiring, backbox, junction box

20A SPN Isolator for Air curtain integrated with door sensor- 1 No. 0.00 0.00
complete with conduiting and accessories, wiring, backbox, junction
19.00
box

Floor Box FB1: Floor Box complete with conduiting and accessories, 2 No. 0.00 0.00
wiring backbox, junction box - consist of (1) 13A Single Receptacle
20.00
Outlet (2) Data Outlet

Floor Box FB2: Floor Box complete with conduiting and accessories, 1 No. 0.00 0.00
wiring backbox, junction box - consist of (2) 13A Double Receptacle
21.00 Outlet, (1) 13A Double Receptacle Outlet connected to UPS and (2)
Data Outlet

13A Spur Outlet for AC complete with conduiting and accessories, 4 No. 0.00 0.00
22.00 wiring, backbox and junction box.

Power Supply to necessary IFU Units complete with conduiting and 5 No. 0.00 0.00
23.00 accessories, wiring, backbox, junction box

Cable Tray/UPVC Conduit/Trunking: Supply and installation of 1 LS 0.00 0.00


approved cable trunking and conduits as per drawings and
24.00
specifications.

20A isolator for ODU-FCU -complete with conduiting and 1 No. 0.00 0.00
25.00 accessories, wiring, backbox, junction box(To be confirmed)

Lighting
Light Point Wiring: Supply and installation of lighting point with 1 LS 0.00 0.00
conduiting, accessories, wiring, backbox, junction box, including
1.00
testing and commission.

4 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Light Fittings: Supply and install of light fittings, including all
brackets, supports, connections, commissioning, and test as per the
manufacturers specifications.

Ceiling Recessed Light 1 No. 0.00 0.00


Ref.: L-1.2
2.00
Location: PBA Consultation Booths

Ceiling Recessed Light 1 No. 0.00 0.00


Ref.: L-1.6
3.00
Location: Self Serve Lobby

600x600 LED Light 10 No. 0.00 0.00


Ref.: L-3
4.00 Location: ATM Room, ITM Room,Network Room,Safe Room,Store
Room

Suspended Light 1 No. 0.00 0.00


Ref.: L-6
5.00
Location: Self Serve Lobby

Suspended Light 2 No. 0.00 0.00


Ref.: L-6.1
6.00
Location: Self Serve Lobby

LED Strip Light 20 lm 0.00 0.00


Ref.: L-8
7.00
Location: Self Serve Lobby

Emergency Light Installation: Engineer, supply and install


contained Addressable Emergency Lighting System in compliance
with Civil Defense requirements, as specified; including battery,
lighting system, installation and wiring.
(Included: Relocation of existing addressable light as per RCP)

8.00 Emergency Lighting Control Panel 1 item 0.00 0.00


Emergency Light 7 No. 0.00 0.00
Location: General Area
9.00

Exit Light (Existing; for Relocation only) 1 No. 0.00 0.00


10.00 Location: Entrances

Cables: Contractor to proceed with the cable sizes after 1 item 0.00 0.00
combining/calculating the electrical load of the existing area load
11.00 and the proposed area. Cables need to be changed if the combined
load exceeds the existing size.

12.00 Testing and commissioning for Electrical Works 1 ls 0.00 0.00

Security & Access Controls


CCTV Camera System: Containment for CCTV Camera and Security 1 ls 0.00 0.00
System.
1.00 Note: Camera and system, Wiring and cable pulling will be done by
Security Team. (if required)

1 item 0.00 0.00


2.00 Integration of security and access control system with fire alarm

5 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)

UPS System
UPS System:Complete supply and installation of UPS system with all 1 ls 0.00 0.00
accessories and fittings including Battery, Charging, Bypass switch,
1.00 all programed to function as per client requirement and as per
authority regulations. (if required)

Telephone & Data System Installations


Supply and fix approved accessories and equipment, as specified and 1 ls 0.00 0.00
approved, complete with metal box, flush mounted, cabling and
conduit to telephone/data points in concealed installation, as
1.00 specified and detailed on drawings

IT/ Network
IT System: Containment for IT System drawings. 1 ls 0.00 0.00
Note: Wiring and cable pulling will be done by IT Team. Ensure that
the existing fiber optic cable should be compatible with Etisalat
equipment. (with condition with main telephone room including all
1.00 the works required)
Containment to the main telephone room is included in the
contractor scope of work.

Data Outlet (450H): Supply and installation of approved data 24 No. 0.00 0.00
outlet, including installation and connection of the coverplate
2.00

Data Outlet (1200H): Supply and installation of approved data 2 No. 0.00 0.00
outlet, including installation and connection of the coverplate
3.00

Data Outlet (1600H): Supply and installation of approved data 2 No. 0.00 0.00
outlet, including installation and connection of the coverplate
4.00

Data Outlet (2350H): Supply and installation of approved data 2 No. 0.00 0.00
outlet, including installation and connection of the coverplate
5.00

Floor Box FB1: Floor Box complete with conduiting and accessories, 2 No. 0.00 0.00
wiring backbox, junction box - consist of (2) 13A Double Receptacle
6.00
Outlet, (1) Data Outlet

Floor Box FB2: Floor Box complete with conduiting and accessories, 1 No. 0.00 0.00
wiring backbox, junction box - consist of (2) 13A Double Receptacle
7.00 Outlet, (2) 13A Double Receptacle Outlet and (2) Data Outlet

Cable Tray/UPVC Trunking and Conduits: Supply and installation of 1 LS 0.00 0.00
approved cable trunking and conduits as per drawings and
8.00
specifications.

N MECHANICAL WORKS

6 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Air Conditioning Works
Design, supply and install air conditioning system with all
equipment; including felxible connectros, valves, pressure
gauges, temperature sensors, switches, hoisting, fixing in
position, mechanical and electrical connections witj local supply,
supports and etc. as specified in the drawings.

Fan Coil Unit: Supply and installation of Fan Coil Unit (FCU)
including DDCs, outfield devices, filters, strainers control valves,
sensors, programmable thermostats, wiring, fixing accessories,
vibration isolators, acoustic insulations, any kind of sound control,
all required civil works, etc., complete all necessary equipment and
accessories as per specifications and drawings

FCU-1 1 No 0.00 0.00


1.00 Location: Service Lobby

FCU-2 1 No 0.00 0.00


2.00 Location: Service Lobby

FCU-3 1 No 0.00 0.00


3.00 Location: Service Lobby

FCU(complete DX with ODU, refrigrigernt piping supply and 1 No 0.00 0.00


installation with NRD)

Miscellaneous
HVAC Ducting: Supply and installation of specified HVAC ducting,
accessories, plenum boxes, complete with necessary equipment and
accessories as per specifications and drawings
Note: Sizes will be as per designed CFM Value per Room and
necessary return air ducting , fresh air and exhaust air ducts.
Including tie in connections from Fresh air and Extract air system of
building.

4.00 AC Supply and Return 65 m2 0.00 0.00

Flexible Round Ducting: Supply and installation of Factory insulated 13 m 0.00 0.00
flexible duct reinforced, factory insulated round volume damper
5.00 with supports, fixings and necessary accessories, all as specified and
show on the drawings.

AC Grilles and Diffusers: Supply and Installation of AC Grills and


Diffusers complete with all necessary equipment and accessories as
per specifications and drawings

Square Ceiling Diffusers


6.00 SAD - Square Ceiling Supply Air Diffuser 250 x 250 3 No 0.00 0.00
7.00 SAD - Square Ceiling Supply Air Diffuser 300 x 300 3 No 0.00 0.00
8.00 RAD - Square Ceiling Return Air Diffuser 250 x 250 3 No 0.00 0.00
9.00 RAD - Square Ceiling Return Air Diffuser 300 x 300 3 No 0.00 0.00

Linear Grilles
10.00 SLG & RLG - Supply & Return Linear Grill (400 x 150mm) 8 No 0.00 0.00

7 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
RLG -Return Linear Grill (250 x 150mm) 5 No 0.00 0.00
Slotted Linear Grilles
11.00 LSSD - Linear Slot Supply Diffuser (4 slots 25mm x 1.8m) 1 No 0.00 0.00

Volume Control Damplers (VCD)


(see attached VCD Schedule)
12.00 VCD - 250 x 250 2 No 0.00 0.00
13.00 VCD - 200 x 200 5 No 0.00 0.00
14.00 VCD - 200 x 250 1 No 0.00 0.00
15.00 VCD - 200 x 150 17 No 0.00 0.00

Variable Air Volume Unit: Supply and installation of VAVs complete


with wiring and all accessories as per specifications and drawings

16.00 VAV 1-250x200 1 No 0.00 0.00


17.00 VAV 2-200x200 1 No 0.00 0.00
18.00 VAV 3-250x200 1 No 0.00 0.00
19.00 VAV 4-200x200 1 No 0.00 0.00
20.00 VAV 5-200x150 1 No 0.00 0.00

Thermostat: Supply and installation of Thermostat, complete with 7 No 0.00 0.00


wiring and all accessories as per specifications and drawings
21.00

Air Curtain: Supply and installation of Air Curtain, complete with 1 No 0.00 0.00
wiring and all accessories as per specifications and drawings.
22.00

Motorized Smoke Fire Dampers(MSFD): Supply and installation of 2 No 0.00 0.00


UL listed motorized fire and smoke dampers with limit end switch,
23.00
all as specified and shown on drawings.

24.00 Fire Damper (FD) 1 No 0.00 0.00


25.00 Chilled Water Supply and Return Pipes-Supply and black steel pipe
work, chilled water supply and return pipes and fittings including
fixings to walls,floors and ceilings,pipe supports,valves all as per
drawings and specifications

22 mm 10 m
28 mm 8 m
35 mm 6 m
Chilled Water Valve Package for FCU-Supply and installations of 9 Item
complete valve package with all fittings,valves accessories as per
specifications and drawings( (1) Two way valve with actuator, (1)
Drain Valve , (1) Strainer , (1) DRV-Double Regulating Valve , (3)
26.00 Gate valves ,with Necessary Tees ,Unions,Bushes and Nipples))

BTU Meter: Supply and Installation of Hydronic heat meter with 1 Item
microprocessor & EEPROM, remote reading digital screen, With M-
27.00 bus output (to be connected to the building managment
system).complete

28.00 Programming, testing and commissioning 1 LS 0.00 0.00

8 of 9
PROJECT: EMIRATES NBD - Convenction Center Branch

Location: Convention center, Dubai, UAE

UNIT RATE
ITEM NO. DESCRIPTION QTY UNIT TOTAL (AED)
(AED)
Note: Contractor to coordinate with Building Management
(Landlord) for exact location of tapping, subjected any modification
required, under contractor responsibility.

G PLUMBING WORKS
DRAINAGE SYSTEM

18 m
25mm Condensate Drain Pipe: Supply and installation of 25mm dia.
condensate drain pipe with insulation (for all FCUs connected to
1.00
nearest floor traps as per drawing) complete with all fittings and
accessories as per specifications and drawings.

55 m
40mm Condensate Drain Pipe: Supply and installation of 40mm dia.
condensate drain pipe with insulation (for all FCUs connected to
2.00
nearest floor traps as per drawing) complete with all fittings and
accessories as per specifications and drawings.

Clean Out: Supply and installation of Clean out complete with all 8 No
6.00
accessories as per specifications and drawings.

Note: Contractor to coordinate with Building Management


(landlord) for exact location of tapping, subjected any modification
required , under contractor responsibility

Total Carried to Summary (AED) AED 0.00