FAHU Schedule

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROPOSED 2B+G+16 HOTEL AND HOTEL APPARTMENTS

Fresh Air Handling Units Schedule


HORSE SHOE HEAT PIPE & COOLING COIL OPERATING
CAPACITY THERMAL WHEEL E.S.P FILTER SECTION
CONDITIONS
EX.AIR FLOW COOLING
TO BE AIR OFF SUPPLY ELECTRICAL DATA REMARK QTY
AIR ON PRECOOL AIR ON AIR OFF EXTRACT SUPPLY SUPPLY COIL
S. FAN EX. FAN CONSIDERED EXTRACT SIDE SUPPLY SIDE REHEAT &EXTRA
REF NO. HEAT PIPE COOLING COIL COOLING COIL SIDE SIDE SIDE REFRIGERENT
FOR HEAT HEAT PIPE CT SIDE
RECOVERY

AIR ON AIR OFF AIR ON AIR OFF PANEL BAG TOTAL


L/s L/s CFM db / wb db / wb db / RH db / RH (Pa) (Pa) V/ P / Hz
db / wb db / wb db / wb db / wb FILTER FILTER LOAD

KW
Deg C Deg C Deg C Deg C Deg C Deg C Deg C Deg C (Pa) (Pa) V/ Ph / Hz kW (approx.)
(approx.)

FAHU-1 11679 8782 7026 24/17 39.4/25.98 46/29.1 32.4/22.35 32.4/22.35 25.1/20.2 13.7/12.91 21.8/16.2 400 400 YES YES 92 CHW/R-407C 400/3/50 39.5 1

FAHU-2 18077 14278 11422 24/17 39.3/25.93 46/29.1 32.4/22.35 32.4/22.36 25.1/20.2 13.7/12.9 21.8/16.2 400 400 YES YES 105 CHW/R-407C 400/3/50 39.5 1

NOTES:

1. EXTERNAL RESISTANCE IS GIVEN FOR INDICATON PURPOSES ONLY. THE CONTRACTOR SHALL CALCULATE THE SYSTEM RESISTANCE AND SELECT THE FAHU FANS ACCORDINGLY. SYSTEM RESISTANCE CALCULATIONS TO BE SUBMITTED WITH FAHU TECHNICAL SUBMISSION FOR APPROVAL.

2. FACE VELOCITY ON THE COOLING COIL SHOULD BE 2.3 M/S MAX.