AT RFI 128 - Penthouse Elevator AC Feeds - 01.03.24 Response
AT RFI 128 - Penthouse Elevator AC Feeds - 01.03.24 Response
Drawing Number
Linked Drawings
Copies To Frank Alfano (Skender Construction LLC), Preston Collins (Skender Construction LLC), Jake Dohm (Michaels Development),
Kaustubh Kridutta (Skender Construction LLC), Christina Martinez-Sahagun (Chicago Housing Authority), Brian O'Neal (Chicago
Housing Authority), Joe Pecoraro (Skender Construction LLC), David Ruzich (Skender Construction LLC), Justin Skender
(Skender Construction LLC), Edmund Steele (Chicago Housing Authority), Jacob Wilhoit (Michaels Development)
Priority
Activity
Question Question from Preston Collins Skender Construction LLC on Monday, Oct 30, 2023 at 08:25 AM CDT
In the elevator machine room there are 2 - A/C Split Units that cool the elevator machine room. These units were installed
during the elevator modernization project and currently are fed from the Penthouse panel that is scheduled to be demoed.
These units will need to be re-fed, but they are not accounted for in new panel schedule.
Is it acceptable to feed these 2 units that will require (2) 2 pole 30amp breakers to be installed in panel PHELP1. See
attached for A/C name plate.
Attachments
IMG_E1439.JPG
Official Response Response from Irma Ayala Canopy-Chicago on Wednesday, Nov 15, 2023 at 12:01 PM CST
Refer to the attached file for submittal AT RFI 128_Penthouse Elevator AC Feeds_11.15.23
response
Irma Ayala/ Canopy A+D
Attachments
AT RFI 128_Penthouse Elevator AC Feeds_11.15.23 response.pdf
All Replies Response from Kaustubh Kridutta Skender Construction LLC on Thursday, Dec 14, 2023 at 03:21 PM CST
The UH-09 has a 27.1 MBH capacity, roughly 8 KW. Per the updated PHELP1 panel schedule, the amperage and voltage
won't be enough to get the required capacity of 8 KW. See the attached schedule and select the heater that will work with the
new panel. These heaters are available with minimum lead time.
Attachments
Electric Heater Schedule.pdf
Skender-Blackwood Joint Venture Page 1 of 2 Printed On: Dec 14, 2023 03:21 PM CST
RFI #128 - Penthouse Elevator A/C Feeds Project: 22-03-30 Albany Terrace - JV
Response from Irma Ayala Canopy-Chicago on Wednesday, Nov 15, 2023 at 12:01 PM CST
Refer to the attached file for submittal AT RFI 128_Penthouse Elevator AC Feeds_11.15.23
response
Irma Ayala/ Canopy A+D
Attachments
AT RFI 128_Penthouse Elevator AC Feeds_11.15.23 response.pdf
Response from Kaustubh Kridutta Skender Construction LLC on Wednesday, Nov 1, 2023 at 08:07 AM CDT
Since we are changing the panel board and transformer to accommodate the split A/Cs, can we also accommodate the
change of the UH-09 gas heater to an electric heater per the RFI #121 (see attached) so that we don't have to build a soffit
and make changes on the 17th floor?
Attachments
AT_RFI 121_UH-09 Pipe Routing Issue_response 10.17.23 (1).pdf
Response from Ismael Vela Canopy-Chicago on Tuesday, Oct 31, 2023 at 02:49 PM CDT
Refer to the attached file for AT RFI 128_Penthouse Elevator AC Feeds response
Ismael Vela/ Canopy A+D
Attachments
AT RFI 128_Penthouse Elevator AC Feeds_response.pdf
TES response:
In the penthouse P-01, in place of the specified UH-09 gas unit heater, use
a 7.5KW, 208V, 3 phase electric unit heater similar to model MUH-07-8 in
the attached selection chart. Provide a 30A/3P CB in panelboard PHELP1
and 3#10, 1#10G, 3/4"C to serve the new electric unit heater via a 30A/3P
non-fused disconnect switch.
Regarding the existing heat pump split systems serving the elevator
machine room, the Contractor shall confirm that the requested 30A/2P CB
will be adequate ampacity to serve each existing system, noting that this
existing equipment nameplate indicates 35A MOCP.
Skender-Blackwood Joint Venture Page 2 of 2 Printed On: Dec 14, 2023 03:21 PM CST
32'-0" 0'-0" 16'-0" 32'-0" 64'-0" 16'-0" 0'-0" 8'-0" 16'-0" 64'-0" 8'-0" 0'-0" 4'-0" 8'-0" 16'-0" 4'-0" 0'-0" 2'-0" 4'-0" 8'-0" 2'-0" 0'-0" 1'-0" 2'-0" 4'-0" 1'-0" 0'-0" 0'-6" 1'-0" 2'-0" 0'-0" 0'-6" 1'-0" 2'-0" 0'-0" 0'-3" 0'-6" 0'-9" 1'-0"
1/32" = 1'-0" 1/16" = 1'-0" 1/8" = 1'-0" 1/4" = 1'-0" 1/2" = 1'-0" 1" = 1'-0" 1-1/2" = 1'-0" 3" = 1'-0"
1 / A1.18
21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 21'-0" 04 NEW PERMANENT SAFETY ANCHOR POINTS
FASTENED TO EXISTING CONCRETE ROOF
STRUCTURE – 2 PER BAY. REFER TO STRUCTURAL.
05 NEW SLAB ON GRADE WITH FOUNDATION WALL -
REFER TO STRUCTURAL.
06 NEW ALUMINUM STOREFRONT GLAZING SYSTEM AT
EXISTING EXTERIOR WALL. REFER TO SHEET A3.4a
FOR STOREFRONT TYPE. COORDINATE LINTEL W/
A STRUCTURAL
08 NEW SUPPORT COLUMNS FOR CANOPY, TYP.
SLOPE TO DRAIN SLOPE TO DRAIN 09 NEW WOOD HANDRAIL. PROVIDE BLOCKING AS
1/4":12" 1/4":12"
REQUIRED
11 STAINLESS STEEL 48" HEIGHT CORNER GUARD
14'-0"
SLOPE TO DRAIN
SLOPE TO DRAIN
12 NEW STOREFRONT. REFER TO SHEET A3.4a
13 BUILT-IN BENCH
1/4":12"
1/4":12"
04 7 14 ELECTRICAL ROOM ONLY AT EVEN FLOORS
ELEVATOR SHAFT P-01
TYP 15 STORAGE ROOM ONLY AT ODD FLOORS
A6.3 16 LOUNGE ROOM ONLY AT EVEN FLOORS, LAUNDRY
B M ROOM ONLY AT ODD FLOORS
SLOPE TO DRAIN
OPEN TO 17 DOOR PUSH PLATE
1/4":12"
SLOPE TO DRAIN
ALBANY TERRACE
ORD
SLOPE TO DRAIN
TO MEET 2HR FIRE RATING AND TO MATCH
PARTITION TYPE C2 ASSEMBLY
1/4":12"
04
14'-0"
APARTMENTS
RENOVATION
TYP TO MEET 1HR FIRE RATING AND TO MATCH
PARTITION TYPE A2 ASSEMBLY
25 ROOF EQUIPMENT RAIL, VERIFY SPACING WITH
MECH. CONTRACTOR, TYP.
26 NEW WALL MTD MTL LADDER FOR ROOF HATCH
D 27 NEW PREFABRICATED ROOF ACCESS HATCH
8 29 LINE OF FURRING PARTITION AT 16TH FLOOR.
1 / A1.18
ADJUST MILLWORK, FAN COIL, CLOSET SIZE, ETC. AS
60623
----------------------------------------------------------------------------------------------------------------------------------
14'-0"
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN
Outdoor Units LANDSCAPE ARCHITECT:
C REQUIRED DUST BARRIERS, CANOPIES,
BARRICADES, PROTECTION, AND/OR WARNING
MCKAY LANDSCAPE ARCHITECTS
5215 N RAVENSWOOD AVE, CHICAGO, IL 60640
04 LIGHTS IN GOOD CONDITION UNTIL THE COMPLETION PHONE: (773) 561-1227
MACHINE ROOM TYP
OF THE WORK REQUIRING SUCH PROTECTION.
4 PROVIDE EGRESS PATHWAYS AS REQ'D FOR STRUCTURAL ENGINEER:
1/8" = 1'-0"
B SPACES TO REMAIN OCCUPIED DURING
CONSTRUCTION.
CARSELLO ENGINEERING
2656 WILD TIMOTHY RD, NAPERVILLE, IL 60564
SLOPE TO DRAIN
PHONE: (630) 854-9567
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
1/4":12"
25 DAILY CLEANING AND REMOVAL OF ALL DEBRIS, MEPF ENGINEER:
DUST, AND EQUIPMENT RELATED TO THE
7 8 THE ENGINEERING STUDIO
SLOPE TO DRAIN
DEMOLITION AND THROUGH CLEAN-UP UPON 701 LEE ST #510, DES PLAINES, IL 60016
14'-0"
COMPLETION OF THE PROJECT. PHONE: (847) 795-8810
1/4":12"
A 6. PROTECT EXISTING EXTERIOR WALLS AND OTHER
ELEMENTS TO REMAIN THROUGHOUT WARNING: ASBESTOS CONTAINING BUILDING
CONSTRUCTION. MATERIALS ARE OR MAY BE PRESENT IN THIS
43'-4" V.I.F SLOPE TO DRAIN SLOPE TO DRAIN
7. THE DRAWINGS ISSUED HEREWITH ARE SCOPE BUILDING. AN ASBESTOS MANAGEMENT PLAN IS
01 1/4":12" 1/4":12"
AVAILABLE IN THE BUILDING FOR REVIEW UPON
ORD RD DOCUMENTS, AND AS SUCH SHOW THE GENERAL
C EXTENT OF THE PROJECT AND DO NOT
REQUEST. NO PERSON MAY DISTURB
ASBESTOS CONTAINING MATERIALS UNLESS
NECESSARILY INDICATE OR DESCRIBE ALL WORK THAT PERSON IS A LICENSED ASBESTOS
REQUIRED FOR FULL PERFORMANCE AND WORKER OR CONDUCTS SUCH WORK IN
SLOPE TO DRAIN
14'-0"
TYP ENCOUNTERED TO PROPERLY EXECUTE THE WORK.
OF HEALTH RULES AND REGULATIONS.
8. DO NOT SCALE DRAWINGS - DIMENSIONS GOVERN.
B LARGE SCALE DETAILS GOVERN OVER SMALL. ISSUANCE
9. WHERE DISCREPANCIES OCCUR BETWEEN THE
VARIOUS DISCIPLINES/TRADES, CONSULT THE MARK DESCRIPTION DATE
ORD RD ARCHITECT BEFORE PROCEEDING WITH THE WORK. SCHEMATIC DESIGN 06.19.20
D 10. PROVIDE FIRE RETARDANT BLOCKING AT ALL ITEMS
WALL-MOUNTED TO STEEL STUD AND GYPSUM
DESIGN DEVELOPMENT
80% CD
04.30.21
08.13.21
BOARD PARTITIONS.
2 / A1.18
18.
YEARS INSTALLED SOLAR REFLECTANCE OF NOT
LESS THAN 0.88.
LOW SLOPE ROOF COVERINGS SHALL BE CLASS A.
A1.18
© 2022 CANOPY ARCHITECTURE + DESIGN, LLC