This work sheet outlines a well washing job from PT. Tamfindo Mitra Mandiri. The job will take place from December 14, 2023 to January 7, 2024 at the Star Energy Darajat DRJ 49 location. It describes the daily tasks to be completed which include setting up and testing the equipment, preparing the power end, and conducting pre and post job inspections over the course of the multi-day job.
This work sheet outlines a well washing job from PT. Tamfindo Mitra Mandiri. The job will take place from December 14, 2023 to January 7, 2024 at the Star Energy Darajat DRJ 49 location. It describes the daily tasks to be completed which include setting up and testing the equipment, preparing the power end, and conducting pre and post job inspections over the course of the multi-day job.
This work sheet outlines a well washing job from PT. Tamfindo Mitra Mandiri. The job will take place from December 14, 2023 to January 7, 2024 at the Star Energy Darajat DRJ 49 location. It describes the daily tasks to be completed which include setting up and testing the equipment, preparing the power end, and conducting pre and post job inspections over the course of the multi-day job.
PERIODE : CYCLE I LOKASI : STAR ENERGY DARAJAT – DRJ 49
TANGGAL DESKRIPSI PEKERJAAN JAM KERJA LEMBUR
14 – 12 – 2023 UNLOADING EQUIPMENT – INSTALL TERPAULIN BASE – SET UP EQUIPMENT 08.00 17.00 15 – 12 – 2023 RIG UP TREATING LINE , VALVE , SWIVEL , 3 “ & 2 “ – RIG UP HOSE 4 “ 08.00 17.00 16 – 12 – 2023 PRE JOB INSPECTION / CHECK & ADD COOLANT – ENGINE OIL – TRANSMISSION OIL - POWER END & OIL PLUNGER – ELECTRICAL SYSTEM 08.00 17.00 17 – 12 – 2023 INSTALL CHECK VALVE , GATE VALVE & SPOOL L/H - R/H 08.00 17.00 18 – 12 – 2023 FILL UP FUEL – FUNCTION TEST EQUIPMENT 08.00 17.00 19 – 12 – 2023 CUNTINUE – FUNCTION TEST EQUIPMENT 08.00 17.00 20 – 12 – 2023 INSTALL SWIVEL JOINT 3” L/H – R/H CONNECT TO SPOOL GATE VALVE 08.00 17.00 21 – 12 – 2023 FUNCTION TEST EQUIPMENT – FILL UP WATER (FLUID) TO DISPLACEMEN `T TANK - PRESSURE TEST LINE 1500 PSI – JOB 08.00 17.00 22 – 12 – 2023 CHECK & PREPARE POWER END – CHANGE RUBBER SUCTION VALVE 08.00 17.00 23 – 12 – 2023 CONTINUE PREPARE POWER END 08.00 17.00 24 – 12 – 2023 CHANGE O – RING COVER FLUID END – FUNCTION TEST EQUIPMENT 08.00 17.00 25 – 12 – 2023 POST JOB INSPECTION – FUNCTION TEST EQUIPMENT 08.00 17.00
PELAKSANA DI VERVIKASI APPROVED
PT. Tamfindo Mitra Mandiri WORK SHEET
NAMA PEKERJAAN : KILL WELL / WELL WASHING
PERIODE : CYCLE III LOKASI : STAR ENERGY DARAJAT – DRJ 49
TANGGAL DESKRIPSI PEKERJAAN JAM KERJA LEMBUR
4 – 1 – 2024 PRE JOB INSPECTION – FUNCTION TEST EQUIPMENT 08.00 17.00 5 – 1 – 2024 TEST RUN ENGINE – PRESSURE TEST LINE - JOB 08.00 17.00 6 – 1 – 2024 CHECK & PREPARE POWER END – ADD OIL PLUNGER – FUNCTION TEST EQUIPMENT 08.00 17.00 7 – 1 – 2024 POST JOB INSPECTION – CHANGE V – BELT ALTERNATOR – FUNCTION TEST EQUIPMENT 08.00 17.00