Professional Documents
Culture Documents
Daily Progress Report Diaphragm Wall Pilling BMRCL 02-01-2024
Daily Progress Report Diaphragm Wall Pilling BMRCL 02-01-2024
NOTE:
A. Resources available at Site like D Wall Rig B-200/ Pilling Rig, Crane 100T, Crane75T Crane40T, JCB, Compressor, DG etc.
B. Requirement of Manpower:
C. Manpower: Steel fabrication Manpower 65 Nos. Concrete Manpower 17 Nos & Anchor works Man Power 6 Nos. Total Manpower 88 Nos. Skilled 67 Nos & 21 Nos Unskilled.