AECOM Consultants Inc.

85, rue Sainte-Catherine Ouest


Montreal, QC H2X 3P4 Canada

T: 514.287.8500
F: 514.287.8600
aecom.com

January 4, 2024
Your Reference
To File : AECOM-Lombardi’s Mock NP-UAHEL-336951-CS-QCBS
Evaluation of selected sections of its own (formally known as
Technical Proposal for “Tender Design, PSRSHDP/UAHEL/S/QCBS-1).
Preparation of Bidding Document, Project No: P178722
Construction Supervision and Post
Construction Services for the Upper Arun Our Reference
Hydroelectric Project” OPP-1182298

Participation by Nationals among proposed Key Experts


Our National Key Expert, Mr. Chapagain (AK3 and BK6), is a Nepalese national who now holds a UK-NRN card, indicating
that he is a Foreign National of Nepali Origin. Currently, Mr. Chapagain is working in Nepal for our sub- consultant, Sanima
Hydro. We have previously provided a copy of his NRN card and other supporting information to confirm his Nepalese
nationality.
Regarding the Score of Nationals among Key Experts, our calculation is:
During Phase A, according to our TECH 6, we proposed the following in person-months: AK3 = 8
person-months
AK6-2 = 6.5 person-months
During Phase B&C, according to our TECH 6, we proposed the following in person-months: BK4-2
= 23 person-months
BK6 = 52 person-months
Total in person-months phase B&C = 85/465
Therefore, the total score should be: 99.5/561 x 20 = 3.55 points

Evaluation of Key Experts


We present below a comparison of UAHEL’s evaluation of five Key Experts where we note a significant fifty-seven
(57) point discrepancy to our self-evaluation. We kindly request that you provide, in the video conference debriefing, the
score against sub-criteria for each of the nineteen (19) evaluated Key Personnel positions.

a. AK-1 Team Leader (Maximum Score 70, Secured Score – 53.90 (77%))

Mr. Rakesh Mahajan, a highly accomplished professional with master's in Civil Engineering, an impressive 41 years of
experience in project management, planning, design, and supervision of hydropower projects in Asian countries. He has
extensive knowledge and understanding of international contract conditions and possesses excellent oral and written
communication skills in English. Through his exceptional leadership skills, as an overall in charge leading a team of 150
personnel and has successfully delivered the design and planning of 10 large projects, with his involvement exceeding 8
months in each project. Mr. Mahajan's expertise and leadership have made him a highly respected professional in the
industry. Considering the above, our anticipated scores are as follows:
Clarification about the man-month on the CV
Name of Project: Nyamjang Chhu Hydroelectric Project (780 MW) – Preparation of Detailed Project
Report (DPR) and Assistance to Client in Obtaining Techno-Economic Clearance
(TEC)
Year: 2011: January 2011 to December 2011 - 12-month duration
Name of Project: Indira Sagar Polavaram Multipurpose Irrigation Project (960 MW) –Detailed Design and
Engineering
Year: 2016: January 2016 to December 2016 - 12-month duration
Name of Project: Malana Hydroelectric Project (86 MW) – DPR, Tender Preparation, Detailed Design and
Construction Supervision
Year: 2001: January 2001 to December 2001 - 12-month duration
Name of Project: Regional Rusumo Falls Hydroelectric Project (80 MW) – Owner’s Engineer
Year: 2015: January 2015 to December 2015 - 12-month duration
Name of Project: Sechi Hydroelectric Project (4.5 MW) – Detailed Design and Engineering and
Construction Supervision
Year: 2012: January 2012 to December 2012 - 12-month duration
Name of Project: Bara Bangahal Hydroelectric Project (92 MW) – Preparation of Detailed Project Report
Year: 2013: January 2013 to December 2013 - 12-month duration

RFP Expert qualifications


Anticipated
and competence for the Expert Qualification & Experience Comment
Scores
assignment
The Team Leader shall M.Tech., Hydraulics & Irrigation, Indian Institute of Exceeds the Maximum
have minimum of Technology (IIT), India, 1990 minimum i.e., 100%
Bachelor’s Degree and BSc. Eng., Civil Engineering, University of Bombay, requirement
preferably have Master's 1980
degree or equivalent in
civil/electrical
engineering or equivalent
discipline.
A senior Hydropower 41 years of experience in project management, and Exceeds the Maximum i.e.,
Expert with at least 25 planning, design, and supervision of hydropower minimum 100%
years of experience in projects. requirement
project management, and
in planning, design and
supervision of
hydropower projects.
In demonstrating the 10+ projects of similar natures/scale such as RCC Exceeds the Maximum i.e.,
professional experience, Dam/dam height/ Installed capacity/HRT Ø/Cavern minimum 100%
the Team Leader shall width/funding agencies etc. out of which 3 projects are requirement
prove to have been based on internationally used contracts, such as FIDIC or
involved in at least 2 SPD of the World Bank or another MDB Overall, In
(two) hydropower charge and was leading a team of 150 personnel’s and
projects based on Successfully completed design & planning of 10+ large
international contracts projects with similar project features such as RCC
out of which at least one Dam/dam height/ Installed capacity/HRT Ø/Cavern
of similar nature and width/funding agencies etc., with his involvement
scale based on exceeding 8 months in each project.
internationally used
contracts, such as FIDIC Nyamjang Chhu Hydroelectric Project (780 MW) -
or SPD of the World Bank India
or another MDB  2011: January 2011 to December 2011 - 12-month
The experiences of Team duration
Leader in previous  780 MW
assignments will be  underground powerhouse (161.9 m x 16 m x 42.5 m)
considered only if  25.2-km long, 6.2-m dia. concrete lined circular
his/her involvement is Headrace Tunnel
continuously covering a
minimum period of 8
Man-month in similar DPR of Chango Yangthang Hydroelectric Project (180
assignment. MW) – India
 84 man-month
 47-m high
 3,841-km long and 20-m dia circular headrace
tunnel
 underground powerhouse chamber
107.4 m (L) x 21 m (W) x 40.5 m (H)
 underground transformer hall cavern
85.25 m (L) x 13 m (W) x 24 m (H)
Allain Duhangan Hydroelectric Project (192 MW) -
India
 84 man-month
 Financing source: International Finance
Corporation (Member of World Bank Group)
 detailed engineering, preparation of tender
documents, bids evaluation and construction
supervision and commissioning.
 Underground powerhouse of 69.75 m (L) x 15.3 m
(W) and 29.775 m (H)
 The Allain headrace tunnel is a circular shaped and is of
4.5-m dia. and 4.5-km length, the Duhangan tunnel has
d-shaped and is 4.5-m dia. and 4.5-km length.

Indira Sagar Polavaram Multipurpose Irrigation


(960 MW) - India
 2016: January 2016 to December 2016 - 12-month
duration
 Financing source: State Government with Central
Assistance. Project has been implemented with
internationally accepted contract forms with
certain modifications to address the unique
project needs.
 960 MW
Rangit-IV Hydroelectric Project (120 MW) - India
 72 man-month
 DPR, Tenders Preparation, and Detailed Design and
Engineering
 6.4-m dia. and 6.488-km long modified horseshoe
headrace tunnel.
Likhu-IV Hydroelectric Project (52.40 MW) – Nepal
 August 2016 – November 2021: 63 man-month
 Head of Design Team
 4,024.5-m long four D-shaped 3.8 m x 3.8 m
headrace tunnel;
 DPR, Tender Preparation, Detailed Design and
Construction Supervision
Malana Hydroelectric Project (86 MW) – India
 2001: January 2001 to December 2001 - 12-month
duration
 Located in the Himalayas
 3.85 m finished dia. D-shaped 3.2-km long tunnel
 Tender Preparation, Detailed Design and
Construction Supervision
 Financing source: Statkraft and Bhilwara Energy
Limited. Project has been implemented with
internationally accepted contract forms with
certain modifications to address the unique
project needs.
Dikhu Hydroelectric Project (186 MW) – India
 36 man-month
 Design, detailing and preparation of Tender
Documents
 112 m high earth cum rock-fill dam
 7.6 m finished dia. headrace tunnel
Simbuwa Khola Hydroelectric (70.3 MW) – Nepal
 14 man-month
 Team Leader
 3.2-m dia. D-shaped tunnel 4.4-km long
 Underground powerhouse of size 102 m (L)
x 14.5 m (W) x 31.75 m (H)
 Preparation of Updated FSR, DPR, Detailed Design
Report and Tender Documents
Heo (240 MW) Hydroelectric Project (240 MW) – India
 48 man-month
 Team Leader
 3.55 km (L) and 6.5-m dia. headrace tunnel
 Preparation of Detailed Project Report
Tato-1 (186 MW) Hydroelectric Project (186 MW) –
India
48 man-month
 Team Leader
 3.64 km (L) and 6.5-m dia. headrace tunnel
 Preparation of Detailed Project Report
Tidong-1 Hydroelectric Power Project (2 x 50 MW)
(extended to 150 MW by providing a third unit of 50
MW) – India
 August 2006 – 2021: 172 man-month
 Head of Design Team
 3.54 m x 3.9 m, 8,500 m (8,5 km) long D-shaped
headrace tunnel
 DPR, Tenders Preparation, Detailed Design,
Engineering and Construction
Regional Rusumo Falls Hydroelectric Project (80 MW)
- Rwanda
 2015: January 2015 to December 2015 - 12-month
duration
 Preparation of Tender Documents
 Financing source: World Bank Group
Bara Bangahal Hydroelectric Project (92 MW) – India
 2013: January 2013 to December 2013 - 12-month
duration
 Head of Design Team
 4.6 m D-shaped and 6.540 km (L) headrace tunnel
 Underground powerhouse of 65 m x 17.5 m x 28 m
 Preparation of Detailed Project Report
Relevant experience in  Likhu-IV Hydroelectric Project (52.40 MW) – Nepal Exceeds the Maximum
Asian countries would be  Simbuwa Khola Hydroelectric (70.3 MW) - Nepal minimum i.e., 100%
an added advantage.  Dikhu Hydroelectric Plant – India requirement
 Chango Yangthang Hydroelectric Plant – India
 Allain Duhangan Hydroelectric Project – India
 Rangit-IV Hydroelectric Project – Arunachal
Pradesh, India
the Team Leader shall be Very good skills in English language Exceeds the Maximum
a person with very good minimum i.e., 100%
oral and written requirement
communication skills in
English

Expected Secured Score: 70 (100%)

b. BK-2 Chief Resident Engineer | (Maximum Score 30, Secured Score – 23.30 (77.6%))
Mr. Dusko Pavic is an accomplished professional with 31 years of experience in civil engineering, structural engineering,
dams and powerhouses, site and team supervision. Specifically, he brings 25+ years of experience in planning and design
and construction supervision of hydroelectric plants. He brings international experience and design/supervision project
management on numerous projects. His expertise includes design of
spillway tunnels, preparation of site instruction for instrumentation, preparing concrete mix design, testing of concrete
quality, planning and site organization, of client staff, and review of detail design. His CV presents at least 6 projects of
similar natures/scale such as RCC Dam/dam height/ Installed capacity/HRT Ø/Cavern width, with his involvement
exceeding 12 months in each project, out of which 4 projects as a Chief Design Engineer or Design Coordinator.
Considering the above, our anticipated scores are as follows:

RFP Expert qualifications


Anticipated
and competence for the Expert Qualification & Experience Comments
Scores
assignment
The Chief Design Engineer B.Sc., Civil Engineering, University of Belgrade, Meets the Qualifying
should have minimum of Yugoslavia, 1992 minimum i.e., 80%
Bachelor’s degree in field of requirement
Civil Engineering and
preferably a Master's
degree in the field of
Hydropower or Water
Resources or Structural
Engineering.
S/he should have at least 25 50 years experience in Planning and Design of Exceeds the Maximum
years of experience in the Hydroelectric Power Plants, Water Treatment minimum i.e., 100%
field of planning, design, Plants and Irrigation Systems and Construction requirement
and supervision of Supervision.
hydraulic structures of
hydroelectric projects
involving major RCC dams,
underground work, tunnels,
tunnel linings, intakes,
settling basin and related
structures.
S/he should preferably have 6 projects of similar natures/scale such as RCC Exceeds the Maximum
an experience as a Chief Dam/dam height/ Installed capacity/HRT Ø/Cavern minimum i.e., 100%
Design Engineer or Design width, with his involvement exceeding 12 months in requirement
Coordinator in detailed each project, out of which 4 projects as a Chief Design
design of hydropower Engineer or Design Coordinator.
projects of similar nature Deriner Arch Dam and Hydroelectric Power Plant
and complexity. (670 MW) – Turkey
The Chief Design Engineer  96 man-month
shall be a key member of  Resident Technical Office Manager, Project
the consultancy team, and Manager, Civil and Design Engineer/Dam
as such is expected to have Engineer
been involved in at least  670 MW
two (2) projects of a similar  253-m high double curvature concrete arch dam
nature based on  Underground powerhouse
international contracts  Design of tailwater dam
The Expert’s involvement in
Lajanuri Concrete Arch Dam and Hydroelectric
the previous assignment as
Power Plant (120 MW) – Georgia
the Chief Design Engineer
 15 man-month (March 2003 to June 2004)
in the individual
 Design Coordinator/Supervision Team Leader
hydropower projects need
 Concrete arch dam height H=70 m
to be equal or more than
 Underground powerhouse
twelve (12) man-months.
Berke Hydroelectric Power Plant (510 MW) –
Turkey
 48 man-month
 Design Coordinator/Dam Engineer
 Concrete arch dam, H=201 m
 Assistance to Contractor in dam construction,
including detailed design of spillway tunnels
Devoll Hydropower Plant – Albania
 24 man-month
 Resident Engineer for Civil Works/Dam
Engineer
 80-m high rockfill dam
 Review of contractor final and detailed design
Svrackovo Hydropower Project (7.2 MW) –
Yugoslavia
 21 man-month (February 1992 to November
1993)
 Senior Designer/Structural Engineer
 70-m high rockfill dam
 Final design
Nenskra Rockfill Dam (With asphalt face) %
Hydropower Plant (280 MW) - Georgia
 84 man-month (and ongoing)
 Chief Resident Engineer
 140-m high rock fill dam
 Basic/initial design review of concrete
structures.

Expected Secured Score: 30 (100%)

c. BK-3-1 Resident Engineers for Headworks (Maximum Score 30, Secured Score – 13.20 (44%)
Mr. Vijay Kumar Singh is a highly experienced civil engineer specializing in the construction supervision of hydraulic
structures for hydroelectric projects particularly the intricate process of roller compacted dam construction. With an
impressive experience of 25 years as resident engineer, out of which 17 years of
experience in the field of construction supervision of hydraulics structures of HEP, Mr. Singh possesses a
comprehensive knowledge of international acceptable contract conditions. His expertise in managing and
overseeing projects in Asian countries has been demonstrated through his continuous involvement for durations
exceeding 24 months. This extended engagement has allowed him to develop a profound understanding of the
complexities associated with the construction of such structures. Mr. Singh’s notable achievements include the
successful completion of two projects. Considering the above, our anticipated scores are as follows:

RFP Expert qualifications Comments Anticipated


and competence for the Expert Qualification & Experience Scores
assignment
The Resident Engineers Bachelor of Civil Engineering, Karnataka University, Meets the Qualifying
(Headworks/ India, 1993 minimum i.e., 80%
Waterways/Powerhouse) requirement
should have minimum a
Bachelor’s degree in the
field of Civil Engineering
and preferably a Master's
degree in the field of
Structural Engineering or
Hydropower or Water
Resources Engineering.
They should have at least Out of 28 years, 17 years of experience in the field of Exceeds the Maximum
15 years of experience in construction supervision of hydraulics structures of HEP. minimum i.e., 100%
the field of construction requirement
supervision of hydraulics
structures of
hydroelectric projects
involving major RCC
dams, underground work,
rock tunnels, tunnel
linings, intakes, settling
basin and related
structures.
They should preferably 4 projects of similar natures/scale such as RCC Dam/dam Exceeds the Maximum
have an experience as a height/ Installed capacity/HRT Ø/Cavern width, with his minimum i.e., 100%
Resident Engineer in involvement exceeding 24 months in each project, as a requirement
construction supervision Resident Engineer in construction supervision and all based
of hydropower projects on international contracts.
of similar nature and Kiru Hydroelectric Project (624 MW) – India
complexity.  7 man-month
The Resident Engineers  624 MW
shall be the key member  Additional General Manager/Construction
of the consultancy team, Management
and as such are expected  123-m high concrete gravity dam
to have been involved in  Underground powerhouse
at least two (2) projects
IBN Hammad Dam Project – Jordan
of a similar nature based
 41 man-month
on international
 On-Site Project Manager
contracts.
 RCC dam, height of the dam is 71 m
The Experts' involvement
 The project has been successfully completed
in the previous
assignment as the Tidong-1 Power Generation Pvt. Ltd. (100 MW) –
Resident Engineers in the India
individual hydropower  31 man-month
projects need to be equal  Construction Management
or more than Twenty-four  Headrace Tunnel of finished size 3.54 m x 3.9 m x
(24) man-months. 8.50-km long
Chuzachen Hydroelectric Project (110 MW) – India
 103 man-month
 Construction supervision
 Project was successfully completed using FIDIC Red
Book conditions of contract with certain modifications
to address the unique project needs
Pinapuram PSP Project (1680 MW) – India
 24 man-month (and ongoing)
 Construction Supervisor
 1680 MW
 42-m high dam
 Subsurface open powerhouse
 Civil works is being implemented using FIDIC Red
Book conditions of contract with certain modifications
to address the unique project needs

Relevant experience in 28 years of experience in working in India (Kiru Exceeds the Maximum
Asian countries would be Hydroelectric Project, Tidong-1 Power Generation, minimum i.e., 100%
an added advantage. Chuzachen Hydroelectric Project, and Pinapuram PSP requirement
Project)
The experience of  IBN Hammad Dam Project - Involved till successful Exceeds the Maximum
involvement of the expert completion of project. minimum i.e., 100%
up to the successful  Chuzachen Hydroelectric Project (110 MW) - requirement
completion of the project Involved in project from its start until its
will be an added commissioning and post commissioning works.
advantage.

Expected Secured Score: 29.00 (96.6%)

d. BK-3-3 Resident Engineers for Powerhouse (Maximum Score 30, Secured Score – 25.2 (84%)
Mr. Mukesh Kumar, a highly skilled civil engineer with a Master's degree in Structural & Construction Techniques, with
25 years of professional experience, Mr. Kumar has dedicated 20 years of experience as a resident engineer in the field
of construction supervision of hydraulic structures of hydroelectric projects. Mr. Kumar's expertise extends beyond
construction techniques and possesses a wealth of experience in reviewing construction designs submitted by EPC
contractors, ensuring their compliance with project requirements and international contracts. Notably, Mr. Kumar has
been involved in 3 projects for durations exceeding 24 months, demonstrating his commitment and dedication to
delivering successful outcomes. He has played a pivotal role in the successful completion of one project, with his active
involvement throughout the process. Considering the above, our anticipated scores are as follows.

RFP Expert qualifications Comments Anticipated


and competence for the Expert Qualification & Experience Scores
assignment
The Resident Engineers Master’s degree in Structural Engineering & Exceeds the Maximum i.e.,
(Headworks/ Construction techniques, Institution of Engineers minimum 100%
Waterways/Powerhouse) India. (IEI), Kolkata, 2008 requirement
should have minimum a
Bachelor’s degree in the
field of Civil Engineering
and preferably a Master's
degree in the field of
Structural Engineering or
Hydropower or Water
Resources Engineering.
They should have at least Out of 25 years, 20 years of experience in the field of Exceeds the Maximum i.e.,
15 years of experience in construction supervision of hydraulics structures of minimum 100%
the field of construction HEP. requirement
supervision of hydraulics
structures of hydroelectric
projects involving major
RCC dams, underground
work, rock tunnels, tunnel
linings, intakes, settling
basin and related
structures.
They should preferably 8 projects, based on international contracts, of similar Exceeds the Maximum i.e.,
have an experience as a natures/scale such as RCC Dam/dam height/ Installed minimum 100%
Resident Engineer in capacity/HRT Ø/Cavern width, with his involvement requirement
construction supervision of exceeding 24 months in each project, out of which 4 as a
hydropower projects of Resident Engineer / construction supervision.
similar nature and
complexity. Madhya Bhotekoshi HEP Project (102 MW) – Nepal
The Resident Engineers  60 man-month (and ongoing)
shall be the key member of  Resident Engineer & Design Engineer/Acting
the consultancy team, and Team Leader
as such are expected to  HRT 7.124 km x 5.7 m (W) x 5.7 m (H)
have been involved in at  Review and evaluation of designs
least two (2) projects of a  Overseeing, managing, and guiding the progress of
similar nature based on construction activities, ensuring adequate staffing and
international contracts. equipment
The Experts' involvement in Karuma Hydroelectric Power Project (600 MW)
the previous assignment as  33 man-month
the Resident Engineers in  Additional General Manager/Civil
the individual hydropower Engineer/Resident engineer
projects need to be equal or  600 MW
more than Twenty-four (24)  Powerhouse cavern 200 m (L) x 19.6 m (W) x 53 m
man-months. (H)
 Transformer cavern 161.4 m (L)x14.7 m (W) x
32.95 m (H)
 2nos of tailrace tunnels of 12.9 m finished dia. and
total length of 17.2 km
 Supervising and administering the progress of
construction activities, ensuring adequate staffing and
equipment. Attending progress review meetings.

Allain Duhangan Hydroelectric Project (192 MW) -


India
 39 man-month
 Assistant Manager – Civil Designs &
Infrastructure
 Construction Supervision/Construction
Management
 Underground powerhouse of 69.75 m (L) x 15.3 m
(W) and 29.775 m (H)
 The Allain headrace tunnel is a circular shaped and is
of 4.5-m dia. and 4.5-km length, the Duhangan tunnel
has d-shaped and is 4.5-m dia. and 4.5-km length.

960 MW Jhangi Thopan Powari Hydroelectric Plant


- India
 60 man-month
 960 MW
 88-m high concrete gravity dam
 9.5-m dia., 12-km long HRT
 Underground powerhouse of size 165 m (L) x 22 m
(W) x 50 m (H)
 Engineering Design
3300 MW Tiroda TPP (6 x 660 MW) - India
 60 man-month
 3300 MW
 Review and preparation of (NIT), tender documents
as per FIDIC Conditions of Contract (COC), review
of bid documents (technical and financial).

1320 MW Kawai TPP (2 x 660 MW) - India


 60 man-month
 1320 MW
 Review and preparation of (NIT), tender documents
as per FIDIC Conditions of Contract (COC), review
of bid documents (technical and financial).

1000 MW Naying HEP (4 x 250 MW) - India


 2007 - 2009: January 2007 to December 2009 - 24-
month duration
 1000 MW
 108-m high concrete gravity dam
 7.08-km long and 10.6-m dia. HRT
 Underground powerhouse complex 23 m (W) x
54.22 m (H) x 181 m (L)
 Civil engineering design
126 MW Larji HEP-Larji –HPSEB (3 x 42 MW)
 63 man-month
 Site Engineer
 Construction Supervision
 127 m (L) x 16 m(W) x 16.24 m (D), 4.1-km long
8.5-m dia. HRT
Relevant experience in 25 years of experience in working in Asian Exceeds the Maximum i.e.,
Asian countries would be countries. minimum 100%
an added advantage. requirement
The experience of  Allain Duhangan Hydroelectric Project Exceeds the Maximum i.e.,
involvement of the expert minimum 100%
up to the successful requirement
completion of the project
will be an added advantage.

Expected Secured Score: 30 (100%)

e. BK-4-1 Senior Mechanical Engineers (HSS) (Maximum Score 20, Secured Score – 15.7 (78.5%)
Mr. Horia Babau is a highly skilled hydro-mechanical engineer with 31 years of design and construction supervision of
hydro-mechanical and powerhouse mechanical design of large hydropower projects, with 25+ years of extensive
experience in planning, erection, and troubleshooting hydropower systems. Mr. Babau is a specialist in hydraulic and
pneumatic system supervision, troubleshooting and maintenance for hydropower projects and power hydraulic
installations including significant experience in planning and troubleshooting hydropower systems. He has experience with
World Bank projects such as the Kainji HPP (760 MW) and INGA1 and INGA2 hydroelectric complex. His expertise in
managing and overseeing projects in has been demonstrated through his continuous involvement for durations exceeding
24 months in at least 5 projects of similar nature and scale, out of which 3 as a Senior Mechanical Engineer and 2 as
Resident engineer.
Considering the above, our anticipated scores are as follows.
RFP Expert qualifications
Anticipated
and competence for the Expert Qualification & Experience Comments
Scores
assignment
The Senior Mechanical Bachelor of Science, Mechanical Engineering, Meets the Qualifying
Engineers should have Technical University of Timisoara, Faculty of minimum i.e 80%
minimum a Bachelor’s Hydraulic Machines, Romania, 1992 requirement
degree in the field of
Mechanical Engineering
and preferably a Master's
degree in Mechanical
Engineering or any
relevant discipline.
They should have at least 31 years of design and construction supervision of Exceeds the Maximum i.e.,
15 years of experience in hydro-mechanical and powerhouse mechanical design minimum 100%
the field of design and of large hydropower projects requirement
construction supervision
of hydro-mechanical and
powerhouse mechanical
design of large
hydropower projects.
S/he should preferably 5 projects of similar natures/scale such as RCC Exceeds the Maximum i.e.,
have an experience as a Dam/dam height/ Installed capacity/HRT Ø/Cavern minimum 100%
Senior Mechanical width, with his involvement exceeding 12 months in requirement
Engineer in detailed each project, out of which 3 as a Senior Mechanical
design and construction Engineer and all based on international contracts.
supervision of hydropower
projects of similar nature INGA-1 (360 MW) & INGA-2 (1424 MW)
and complexity. Hydroelectric Complex – Rehabilitation -
The Senior Mechanical Democratic Republic of the Congo
Engineers shall be the key  36 man-month
member of the  Senior Mechanical Engineer/Resident
consultancy team, and as Engineer (Assigned in DR Congo)
such are expected to have  1424 MW
been involved in at least  Monitored all project developments (construction
two (2) projects of a similar supervision)
nature based on
Optimization of Shipshaw HEPP (1145 MW) –
international contracts.
Canada
The Experts' involvement
 2011 - 2012: January 2011 to March 2012 - 14-
in the previous assignment
month duration
as the Senior Mechanical
 Senior Mechanical/Resident Engineer
Engineers in the individual
 1145 MW
hydropower projects need
 Monitored all project developments (construction
to be equal or more than
supervision)
twelve (12) man-months.
Kainji Hydropower Plant (760 MW) – Nigeria
 48 man-month
 Senior Mechanical Engineer/Resident Project
Manager (Upgraded from Chief Resident Engineer),
assigned in Nigeria
 760 MW
 65-m high earth and concrete dam
 Monitored all project developments (construction
supervision)
Chamera II HEPP in India (300 MW) – India
 2003 - 2004: January 2003 to May 2004 - 16-
month duration
 Field Project Supervisor (Assigned in India)
 Designed, led testing and the successful
commissioning of Hydraulic Pressure Greasing
System
 Technical site supervision
Nurek Hydropower Plant (3375 MW) - Republic of
Tajikistan
 24 man-month (and ongoing)
 Chief Resident Engineer (Assigned in
Tajikistan)/Team Leader of a Multi-disciplinary
international Team (seven expat engineers)
 3375 MW
 Monitored all project developments (construction
supervision)

Expected Secured Score: 19.00 (96.6%)

f. BK5 – Senior Electrical Engineer (Maximum Score 20, Secured Score – 9.70 (48.50%))
Mr. Leonardo Nieto, a highly skilled electrical engineer with 40 years of professional experience, performing as field
resident engineer, design engineer, project engineer, supervision engineer, project coordination and managing. Mr. Nieto
has dedicated more than 25 years of experience in different kind of hydroelectric electric projects concentrated in main
activities such construction, detail engineering, preparation of technical specifications for bidding documents, follow-up
of planning, technical supervision, testing, assistance to factory acceptance tests and commissioning. Mr. Nieto as well
has actively participated in contract negotiations for manufacturing and supplying of electromechanical equipment for
hydropower plants and substations comprising turbines, generators, switchgears, power transformers, control and
protection devices, gates, bridge cranes, penstocks, etc. Notably, Mr. Nieto has been involved in few projects for
durations exceeding 44 months, demonstrating his commitment and dedication to delivering successful outcomes. He has
a remarkable experience in international projects, particularly in Canada, Colombia, Dominican Republic, Guatemala,
India, Rwanda, Senegal, Guinea, and others. Considering the above, our anticipated scores are as follows:

Clarification about the man-month on the CV


Name of Project: Lower Mattagami River Project (655 MW) – Little Long, Harmon and Kipling
Generating Stations
Year: 2009 - 2010: November 2009 to December 2010 - 13-month duration
Name of Project: Allain-Duhangan Hydroelectric Project (192 NW)
Year: 2009 - 2010: February 2009 to April 2010 - 14-month duration
Name of Project: Xaclbal Hydroelectric Project (94 MW) - Guatemala
Year: 2008 - 2009: January 2009 to February 2010 - 13-month duration
Name of Project: Sambangalou Hydroelectric Development (128 MW) – Senegal
Year: 2017 – on going - more than 6 years duration
Name of Project: Las Damas Mini Hydroelectric Powerplant (1 x 4 MW)
Year: 2005: January 2011 to June 2011 - 6-month duration
Name of Project: Magueyal Mini Hydroelectric Powerplant (2 x 1.5 MW)
Year: 2005: July 2011 to December 2011 - 6-month duration

RFP Expert qualifications and


Anticipated
competence for the Expert Qualification & Experience Comments
Scores
assignment
The Senior Electrical Engineer Magister of Science r, Electrical Engineering, Exceeds the Maximum i.e.,
should have minimum a Moscow Engineering Power Institute minimum 100%
Bachelor’s degree in the field (MEPI), Moscow, Russia, 1983 requirement
of Electrical Engineering and -
preferably a Master's degree in
Electrical Engineering or the
related discipline.
S/he should have at least 15 Out of 40 years, 25 years of experience in the Exceeds the Maximum i.e.,
years of experience in the field field of design and construction supervision minimum 100%
of design and construction of hydraulic power plants. requirement
supervision of powerhouse
electrical and sub-station
components of large
hydropower projects.
S/he should preferably have 4 projects of similar natures/scale such as RCC Exceeds the Maximum i.e.,
an experience as a Senior Dam/dam height/ Installed capacity/HRT minimum 100%
Electrical Engineer in detailed Ø/Cavern width, equipped with Pelton requirement
design and construction turbines, 230 kV conventional substations and
supervision of hydropower associated overhead power lines, with his
projects of similar nature and involvement exceeding 12 months in each
complexity. project, as a Senior Mechanical Engineer and
The Senior Electrical Engineer all based on international contracts.
shall be a key member of the
consultancy team, and as Lower Mattagami River Project (655 MW)
such is expected to have been – Little Long, Harmon and Kipling
involved in at least two (2) Generating Stations – Canada
projects of a similar nature  2009 - 2010: November 2009 to
based on international December 2010 - 13-month duration
contracts.  Senior Electrical Engineer
The Expert’s involvement in  Detailed design and construction
the previous assignment as supervision
the Senior Electrical Engineer
Allain-Duhangan Hydroelectric Project
in the individual hydropower
(192 NW) - India
projects need to be equal or
 2009 - 2010: February 2009 to April
more than twelve (12) man-
2010 - 14-month duration
months.
 Senior Electrical Engineer
 Detailed Engineering and Technical
Supervision during Construction
 Underground powerhouse of 69.75 m (L) x
15.3 m (W) and 29.775 m (H)
 Two Pelton units.
 The headrace tunnel is a circular shaped and
is of 4.5-m dia, and 4.5 km length, the
Duhangan tunnel has d-shaped and is 4.5-m
dia. and 4.5-km long
Xaclbal Hydroelectric Project (94 MW) -
Guatemala
 2008 - 2009: January 2009 to February
2010 - 13-month duration
 Senior Electrical Engineer
 Detailed Engineering Design and
assistance during construction
 Headrace Tunnel (HRT) is
approximately 5-m dia., 5 km long
 230 kV substation
Sambangalou Hydroelectric Development
(128 MW) – Senegal
 12 man-month (and ongoing)
 Resident Engineer, Chief Engineer,
Electrical Services
 Owner’s Engineer for Supervision and
Monitoring for the Energy Project Work
 RCC gravity dam with a crest of 560-m
long and 91-m high
 15 225/30 kV substations
The experience of involvement Allain-Duhangan Hydroelectric Project –
of the expert up to the Detailed Engineering and Technical
successful completion of the Supervision during Construction
project will be an added La Miel I Hydroelectric Powerplant -
advantage. Testing and commissioning.

Expected Secured Score: 20 (100%)


Note*: Large projects are considered as category A4 projects with installed capacity greater than 100 MW as per Hydro Power
Guidelines of Nepal (2018).