1. TUJUAN UMUM
Prosedur ini menjelaskan prosses inspeksi dan pengujian di workshop maupun di lapangan untuk
2. RUANG LINGKUP
Prosedur ini mencakup persyaratan pemeriksaan dan pengujian lapangan selama kegiatan
konstruksi tangki pada kegiatan fabrikasi dan instalasi di workshop / site oleh PT. Berkah Andalan
BPVC Section IX (2019) : Qualification Standard for welding and Brazing Procedures, welder,
4. DEFINISI
B MATERIAL INSPECTION
1 Material Receiving
a. Review of Material Cert to Conform With Specification Owner Specification Material Specification Mill Certificate P P R
b. Check Corelation between Mil Certificate and Material Identification Owner Specification Material Specification Mill Certificate P P R
c. Physical checking of materials (visual, dimensional, and testing) JIS,ASTM Material Specification Inspection Report P P R
F HYDROTEST
1 Barton Chart Recorder Hydrotest
a. Pressure 25% (Holding time 30 minutes) ASME B 31.3 - 2018, ASME SECT.V ASME B 31.3 - 2018 Report P P W
c. Pressure 50% (Holding time 30 minutes) ASME B 31.3 - 2018, ASME SECT.V ASME B 31.3 - 2018 Report P P W
e. Pressure 100% (Holding time maksimum 2 hours) ASME B 31.3 - 2018, ASME SECT.V ASME B 31.3 - 2018 Report P P A
G COATING
1 Check temperatur & humidity Surface Prep. & Paint Procedure Surface Prep. & Paint Procedure Report P P SW
2 Check Blasting Material Surface Prep. & Paint Procedure Surface Prep. & Paint Procedure Report P P SW
Halaman 1 dari 2
SITE INSPECTION & TEST PLAN
PROJECT ACID TANK AND PIPING
OWNER : PT. Sumbawa Jutaraya DOC. NO : 1001-155-QAC-ITP-BARA-002
KONTRAKTOR : PT. Berkah Andalan Rekayasa REV : 0A
PROJECT NAME : PROJECT PIPING ACID DATE : 5-Jan
LOCATION : Pengulir Gold and Development Project
DICIPLINE : PIPING
ITEM INSPECTION LEVEL
PROCESS DESCRIPTION/INSPECTION ACTIVITIES REFERENCE DOCUMENT ACCEPTANCE CRITERIA CERTIFYING VERIFYING DOCUMENT REMARKS
NO
3 Check Surface Preparation as per specification ISO 8501 , ISO 8503 Surface Prep. & Paint Procedure Report P P A
4 Visual & DFT Painting (each layer) ASTM D 7091 Surface Prep. & Paint Procedure Report P P A
SIGNATURE
NAME
SIGN DATE
JOB TITLE
Halaman 2 dari 2