Professional Documents
Culture Documents
MyCREST Design & Construction Stage V 2.0.1
MyCREST Design & Construction Stage V 2.0.1
i
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Chief Executive
Construction Industry Development Board Malaysia
Level 10, Menara Dato’ Onn,
Pusat Dagangan Dunia Putra,
No 45, Jalan Tun Ismail,
50480 Kuala Lumpur,
Malaysia.
No part of this publication may be reproduced or transmitted in any form or by any means, whether
mechanical or electronic including photocopying and recording without the written consent of CIDB.
ii
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
iii
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 262
v
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
PRE DESIGN
POINT
PD1 MyCREST Sustainable and Carbon Reduction Targets PD 1 Ci
Aims
To establish sustainable development and carbon reduction targets as one of the
fundamental goals of building design at the onset or initiation of the design process.
Requirements
1 POINT:
Incorporate sustainable building and carbon reduction objectives in a project’s brief or
design intent document such as Owner’s Project Requirements (OPR) document and/or
Project Brief document.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
1. Document the inclusion of sustainable development in the need statements and
targets in the project design intent document.
2. Develop the design intent document at the Integrated Design Process (IDP)
Charrette workshop early in the design or goal-setting process.
3. Establish strategies and goals that are quantifiable and performance-based.
Examples are as follows:
a. “The project should reduce energy consumption to 30% below the MyCREST
baseline…”
b. “The project should reduce water consumption to 20% below the MyCREST
baseline…”
c. “The project should demonstrate a reduction of embodied carbon by 10%
through the specification of materials and on-site practices during the
construction phase…”
4. Use the project design intent document as a basis for consultant and contractor
team selection, design criteria, and construction document.
1
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
PRE DESIGN
POINT
Initial Target of MyCREST Level and Estimation of MyCREST Green
PD2 PD 2 S
Budget
Aims
To clarify the level of sustainable implementation and to quantify carbon reduction
targets as part of the project goals. To state targets with respect to the MyCREST
certification system including the level of targeted “star” rating and the “green building
budget”. This point also assists projects in selecting and applying the best sustainable
strategies applicable to the project.
Requirements
1 POINT:
Produce documents such as an estimated green budget related to the level of
sustainable targets and rating levels. Incorporate the MyCREST budget in the total
construction cost independently. This can be in the form of project minutes or project
proposals.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
1. An estimated green budget with a breakdown of the cost related to the level of
rating and major criteria to be scored.
2. Preliminary MyCREST Scorecard.
3. MyCREST Certification Plan.
2
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
PRE DESIGN
POINT
PD3 Green Eco-Charrette PD 3 S
Aims
To develop a plan for incorporating green features in the project design under an
Integrated Design Process (IDP) and achieving a shared project vision throughout the
project in order to build both individual and group ownership of the project.
Requirements
1 POINT:
A charrette typically refers to a form of intensive design meeting. This involves gathering
multiple disciplines together as a group to brainstorm initial ideas and strategies to
achieve sustainable and carbon reduction goals. This session may range from half a day
to several days, depending on the size of the project.
Conduct at least one full day of the eco-charrette workshop with the project team that
includes the involvement of the client or client’s representative.
Justification
An integrated design process is central to the success of any green building project. The
initial eco-charrette, also known as the kick-off meeting, provides the foundation and
structure for a sustainable-based collaborative process to occur.
MyCREST rewards team efforts in facilitating the initial eco-charrette. The facilitator,
normally the “green” or sustainability facilitator or consultant should lead the charette
and explore the synergies and cost benefits of various design strategies brainstormed for
the project. There should be an effort to get consultants and others on board this
collaborative effort towards ensuring that the MyCREST building realises its fullest
potential. At the end of the charrette, not only the general direction and strategies of a
project are outlined, but also there are specific action items listed and the responsible
parties for all tasks required within each sub-criterion being attempted are identified.
As per MyCREST submittals, these will become the foundation of the kick-off sustainable
MyCREST brief and checklist of the project. They will be used by the project team to follow
through with each task throughout the duration of the project.
3
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The aim of the workshop is to initiate the project by engaging owners, staff, contractors,
user groups, and community groups on the benefits of green design and bringing them
into the design process at key points in the decision-making process.
Eco-charrettes are normally intensive sessions, ranging from a few hours to an entire day,
in which client representatives, architects, engineers, other consultants, and often users
gather to define the sustainable principles that will guide the design and to identify
potential synergies between different disciplines. It is part of the sustainable “integrated
design process”, which aims to bring all the affected parties together to collaboratively
brainstorm green design and low carbon strategies. Ideally, the integrated design
process should include contractors, cost estimators, and facilities staff in ensuring that
high-performance building systems and components are practical, durable, and cost-
effective. The process of giving everyone a chance to speak and share ideas changes
the team dynamic in positive ways.
The eco-charrette should end with a preliminary scoring strategy and list of strategies. The
duration of an eco-charrette and the level of technical detail will vary significantly
depending on the participants’ familiarity with sustainable measures. It should begin and
end with the value of sustainable and low carbon design for the organisation and then
consider the potential for green measures for the project. By the end, the goals
articulated in the eco-charrette become the touchstones of a project that can guide
the design as it moves ahead.
Carbon Calculator
None
4
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design and Construction Assessment:
1. Minutes of the meeting of the eco-charrette, in addition to the requirements
above, must include the following:
a. Facilitator appointment, as every eco-charrette must have a facilitator.
b. List of attendees from multiple disciplines.
c. Identification of goals, barriers, and challenges with potential solutions.
2. Preliminary scorecard and potential strategies.
3. Target level of certification.
5
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
PRE DESIGN
POINT
PD4 Use of an Integrated Design Process PD 4 S
Aims
The aim is to establish and implement a multi-stakeholder collaborative goal-setting and
design process in order to maximise opportunities for integrative, cost-effective adoption
of green and low-carbon design and construction strategies.
Requirements
1 POINT:
Define and assemble an integrated design team including representation from all end-
user stakeholders, including (as applicable) owner representatives, facility manager,
engineering/maintenance personnel, architect, interior designer, landscape architect,
and construction manager or general contractor. Individuals may perform more than
one role for the team, which involves a minimum of five project team members from
different and multiple disciplines or can be from the disciplines stated in the list given in
Figure 1, including the owner or owner representative or as many as possible; OR
The integration of Building Information Modelling (BIM) systems in the design process.
Justification
Integrated design leads to understanding the building as a set of interrelated and
interdependent systems in which a single design decision can trigger multiple systemic
improvements. An integrated design process, supported by guiding principles, is
instrumental in successfully developing and implementing cost-effective green building
strategies.
BIM or Building Information Modelling refers to the use of BIM software and an integrated
model to design, construct, and manage a construction project to completion. Today,
an increasing number of construction firms are relying on BIM. Low carbon design is best
served by an integrated design process with a holistic approach to all design and
construction disciplines. The adoption of BIM is in part based on its ability to facilitate an
integrated design. In MyCREST, the design and construction criteria and compliance rely
6
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
on improving building performance. Many of the BIM tools, including the energy use
modelling, provide better information on how design changes may affect building
performance than any traditional design tool.
c. Facility Manager
Using BIM for Building Performance Monitoring and Verification has generated a
high level of interest in monitoring and performance verification by all
practitioners, providing evidence of the perceived potential in the value of BIM
tools during the operation and maintenance phase of a project. MyCREST
promotes efforts to capitalise on the data in the BIM model in order to monitor
building performance and verify how well the building actually performs
compared to the predictions during the design Assessment. This will not only help
improve energy efficiency but also assist designers to improve their use of models
to achieve more reliable outcomes in the future.
7
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
d. Contractors
BIM models can also provide more information to product manufacturers,
including allowing for greater use of prefabrication, which can eliminate waste
and make the construction process greener and faster. High profile, complex
projects normally involve a large number of customised products. BIM can create
a database of existing high-quality products that meet these demands, enabling
the team to add another layer of savings to the whole process and to the carbon
footprint.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
1. Project organisation chart.
2. Role and responsibility matrix.
3. Development of a regular meeting schedule for the integrated design team to
continue refining the project’s sustainable design strategies throughout the design
process. Review strategies for synergies between systems and processors with the
goal of linking strategies into a larger design framework.
4. Project’s minutes of the meeting.
5. Softcopy of BIM modelling data.
MAXIMUM
PRE DESIGN
POINT
Assessment of Environmental & Social impact of Development or
PD5 PD 5 S
Re-Development
Aims
To identify the potential environmental impact of the project and the surrounding area
that may be affected by the proposed development. This generally covers an EIA
assessment, which is typically part of the feasibility studies of a project.
Requirements
1 POINT:
Submit the assessment of environmental & social impact of the development or re-
development.
Justification
Any new development or redevelopment has potential impacts—either negative or
positive—on the surrounding area be it on social, physical, or economy. These potential
impacts could be temporary or permanent either in the short or long term. The report will
also provide/suggest the mitigation efforts for all the potential impacts.
In 2017, DOE issued a new guideline known as “Environmental Essentials for Siting of
Industries in Malaysia (EESIM)”. This guideline, which is more comprehensive and
practical, is a useful reference in managing environmental issues in project development.
9
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design and Construction Assessment:
An environmental report that includes:
1. Ecology.
2. Habitat.
3. W ater bodies.
4. Social impact.
5. Noise and vibration.
6. Air.
10
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
PRE DESIGN
POINT
PD6 Facilities Management Input in the Design Team PD 6 S
Aims
Facilities management (FM) has become a significant factor in the goal of achieving
robust, sustainable buildings throughout their life cycle. FM has a key role to play in the
eventual achievement of major criteria, key sustainability, and environmental targets in
both new and existing buildings. The aim of this sub-criterion is to involve the Facility
Manager as a design team member at the onset and initiation of a project.
Requirements
1 POINT:
Provision of Facility Management input during the development of the project design.
Justification
The Facility Manager plays an important role in sustainable practices including the ability
to link members from the strategic level with those from the operational level while
incorporating knowledge of FM and FM-related experience into the design of the
building.
The Facility Manager’s function in the design team is to represent the owner by assisting
the design team (i.e. Architect, Engineers and Quantity Surveyor) at the early design
stage so as to achieve:
1. A building/facility that is relatively easy to run, maintain, control, and manage
throughout its lifecycle.
2. The design of a building/facility that is more suited to the needs of the end-
users.
3. A design that incorporates FM knowledge and experience.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
Minutes of meetings that verify the involvement of representatives from the Facilities
Management Department.
11
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
12
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS Req1 Site Inventory Analysis on Greenery IS Req1 Cr
Aims
To document the existing environmental features and greenery, including the type of
existing vegetation on-site.
CALCULATOR PLANT INVENTORY
Requirements IS-INV01: SITE INVENTORY ANALYSIS ON GREENERY
REQUIRED:
Prepare a site inventory analysis and report of existing carbon sequestration elements on
the total existing greenery area and only on trees with a diameter of 4 inches (10 cm) or
above at breast height. The following information shall be included in the report:
1. Total area of existing greenery.
2. Scientific name/family/number of trees.
3. Trunk height.
4. Status and value(s) of the trees (endemic species, invasive species, timber species,
introduced species, native species, endangered species, and other related
information).
5. Total number of trees with a trunk diameter of more than 28 cm (11 inches) at
breast height.
6. Total number of trees with a trunk diameter of less than 28 cm (11) inches at breast
height.
Note:
For non-green filled areas, photographic evidence shall be submitted to prove the
current site condition in order to comply with this requirement.
Justification
Major elements of existing greenery on carbon absorption capabilities of a site are
related to the carbon storing characteristics of existing trees (particularly old, large trees)
and existing soil make-up of a site. In many cases, disturbing the existing greenery (such
as large trees) will destroy the carbon absorption or sequestration capabilities of a site
forever and cannot be replaced. For greenfield sites, a site inventory will assist the project
team to identify potential trees and resources that should not be disturbed and to
evaluate the existing natural resources, including the extent of flora and fauna, the green
area, and the targeted sub-criteria in MyCREST in relation to sequestration as shown in
Figure 2.
13
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Plant Inventory
Submittals
Design and Construction Assessment:
1. Report on-site inventory analysis, including a plant inventory sheet and
photographic evidence of existing trees.
14
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
15
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS1 Low-Carbon City Characteristics and Factors IS 1.1 Ci
Aims
To avoid the opening of new land and greenfield area.
Requirements
3 POINTS:
Construct a new building or renovate a building on a previously developed site wi th a
minimum density of 5,500 m² per acre net within 500 m radius. The density calculation
must include the area of the project being built.
Proximity is determined by drawing a 500 m radius around the building entrance on a site
map.
Calculation example:
500 m radius = 785,000 m² or 194 acres
Min. density = Total GFA of buildings within the radius ≥ 5,500 m²/acre
194 acres
Justification
A project within a defined urban footprint encourages the development to be planned
at an existing developed area and avoids new land development.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
1. Density calculation.
2. Proximity is determined by drawing a 500 m radius around the main building
entrance on a site map.
3. Land use plan from the Local Authority (Pelan guna tanah kawasan).
16
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
17
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS1 Low-Carbon City Characteristics and Factors IS 1.2 Ci
Aims
To reduce pollution and the impacts of carbon emission by the development arising from
the transportation sector.
Requirements
2 POINTS:
Locate the building within 800 meters of five (5) selections of basic services such as, but
not limited to, the list below. These services should be accessible via a pedestrian
walkway, if necessary.
1. Place of worship.
2. Bank.
3. Pharmacy.
4. Convenience grocery.
5. Post office.
6. Laundry.
7. Hardware store.
8. Supermarket.
9. School.
10. Library.
11. Daycare centre.
12. Senior care facility.
13. Beauty salon.
14. Hospital/clinics.
15. Community centre.
16. Park.
17. Night market.
Justification
Developing a project within walking distance to available basic amenities will encourage
people to walk, which will help reduce the CO2 impact.
Carbon Calculator
None
18
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Submit the site plan showing the building location in connection to the above
basic services, indicating the covered walkways, pedestrian access, and other
connections like link bridges. Provide the legend for all available services. Refer
Figure 3.2.
2. Proximity is determined by drawing a 0.8 km radius around the main building
entrance on a site map.
Construction Assessment:
1. Submit the as-built site plan showing the building location in connection to the
above basic services, indicating the covered walkways, pedestrian access, and
other connections like link bridges. Provide the legend for all available services.
19
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 3.2. Example of submittal which includes a “Distance to Project” analysis of each amenity
or facility to demonstrate the proximity of development within urban amenities.
20
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS1 Low-Carbon City Characteristics and Factors IS 1.3 Ci
Aims
To lessen the strain on greenfield land and to promote the rehabilitation of previously
damaged land.
Requirement
1 POINT:
Utilise brownfield area for the development of the project and implement proper
measures such as neutralising a contaminated site and conducting a soil condition test
to ensure the safety of the site (if required).
Justification
Development on a brownfield area will reduce the opening of virgin land.
Carbon Calculator
None
Submittals
Design and Construction Assessment:
1. A report on the previous nature of the land, certified by an approved testing
laboratory.
2. An EIA report containing the level of contamination and proposed actions.
21
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS2 Carbon Accounting on Site IS 2.1 Cr
Aims
To increase carbon sequestration throughout the project lifecycle through greenery
strategies and the conservation of trees, and to reduce intrusion on the natural
environment.
CALCULATOR CALCULATOR
IS-CAL01: CARBON ACCOUNTING ON IS-CAL02: CARBON ACCOUNTING ON
SITE - DESIGN SITE - VERIFICATION
Requirements
Carbon sequestration conservation of trees ≥ 28cm (11 inches) by:
1 POINT:
Conserving more than 20 percent of trees with a trunk diameter larger than 28 cm (11
inches), OR
2 POINTS:
Conserving more than 40 percent of trees with a trunk diameter larger than 28 cm (11
inches), OR
3 POINTS:
Conserving more than 60 percent of trees with a trunk diameter larger than 28 cm (11
inches), OR
4 POINTS:
Conserving more than 80 percent of trees with a trunk diameter larger than 28 cm (11
inches)
*Urban infill projects with no existing trees will not be able to score for carbon
conservation under this sub-criterion. Conservation of trees also includes the effort made
to re-locate the trees within the same site.
Justification
Trees have almost 350 million years of experience in sequestering carbon. Trees, like other
green plants, use photosynthesis to convert carbon dioxide (CO2) into sugar, cellulose,
and other carbon-containing carbohydrates that they use for food and growth. Trees are
unique in their ability to lock up large amounts of carbon in their wood and continue to
add carbon as they grow.
Although existing greenery and forest continuously release some CO2 from natural
processes such as decay and respiration, a healthy forest typically stores carbon at a
greater rate than it releases carbon. Saving trees and planting additional—particularly
22
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
large—trees are vital for this purpose. Additionally, the use of Smart Growth and green
infrastructure for developments could ultimately lead to better, low-carbon
development and communities where large and medium-sized trees produce multiple
benefits—such as lowering stormwater and urban heat island impacts—to realise multiple
and great contributions towards improving the environment.
Carbon sequestration rate varies greatly according to tree species, age of the tree,
density of tree, location, type of soil, and climate. Hence, the amount of CO2 sequestered
in a given tree/species can be roughly estimated. From the tree’s age (weight, diameter,
and height), we can obtain the yearly sequestration rate regardless of the type of
species, age, location, and composition. Therefore, the critical point in estimating the
sequestration rate is the trunk diameter. The coefficient for a trunk diameter of less than
11 inches is 0.25 compared to a trunk diameter of more than 11 inches, which is 0.15.
Even though the coefficient for trees with a trunk diameter of more than 11 inches is
lower, the total amount of carbon sequestration rate is greater.
Carbon Calculator
Submittals
Design Assessment:
1. Tree inventory.
2. Earthwork plans.
3. Measurement plans showing the location of existing trees.
4. Tree-planting plan.
Construction Assessment:
1. Site plan showing the location of existing trees being conserved.
2. Photographic evidence.
3. Calculation of the percentage of preserved trees.
23
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
24
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS2 Carbon Accounting on Site IS 2.2-2.4 Cr
2.2 Carbon Sequestration – New Planting
2.3 Shaded Trees W ithin 5 Meters from the Building Parameter 6 Points
2.4 Produce Carbon Sequestration of Not Less Than 0.5 tCO2e
Aims
To increase carbon sequestration through greenery strategies on-site via the
conservation of existing trees and flora.
CALCULATOR CALCULATOR
IS-CAL01: CARBON ACCOUNTING ON IS-CAL02: CARBON ACCOUNTING ON
SITE - DESIGN SITE - VERIFICATION
Requirements
2.2 Carbon Sequestration – New Planting
2 POINTS:
Conserve and restore greenery on-site including planting new vegetation
(native/adaptive) on 20% of the site area including the building footprint, with at least
10% from this percentage of planting consisting of trees measuring more than 28 cm in
diameter when fully mature, OR
3 POINTS:
Conserve and restore including planting new vegetation (native/adaptive) on 25% of
the site area including the building footprint, with at least 10% from this percentage of
planting consisting of trees measuring more than 28 cm in diameter when fully mature,
OR
4 POINTS:
Conserve and restore including planting new vegetation (native/adaptive) on 30% of
the site area including the building footprint, with at least 10% from this percentage of
planting consisting of trees measuring more than 28 cm in diameter when fully mature.
25
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
A social and environmental benefit of greenery is the extent to which it contributes to the
policy objective of reducing CO2 in the atmosphere by locking up carbon through
elements such as large trees with deep roots or any other strategies related to carbon
sequestration. Carbon stored in the greenery has a long-term effect on the climate, and
new plants provide benefits by accumulating carbon and keeping that carbon out of
the atmosphere.
Green roofs must provide a diversity of native or adaptive species that provide
ecological habitat. Extensive use of sedum monoculture and common turfgrass cannot
be accepted. The project must show that if they have no significant existing greenery on-
site, then effort must be made to add to the existing landscape and greenery through
native and adaptive vegetation. The project must undertake the following:
1. List, number, and location of the softscape elements, as detailed in landscape or
building design.
2. Calculation of the carbon sequestration rate.
3. Once established, the native/adapted plants require minimal or no irrigation; do
not require active maintenance including mowing or chemical inputs such as
fertilizers, pesticides, or herbicides; and provide habitat value and promote
biodiversity through the avoidance of monoculture planting.
Carbon Calculator
Submittals
Design Assessment:
1. Landscape master plan showing the location of plants.
2. Calculation of carbon sequestration.
Construction Assessment:
1. As-built landscape master plan showing the location of plants.
2. Calculation of carbon sequestration.
27
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS3 Environmental Management Plan (EMP) IS 3 Ci
Aims
To establish and implement a comprehensive environmental management plan during
the construction period, including to reduce the pollution loads and to reduce the effects
of pollution on-site as a result of erosion and sedimentation produced during earthworks.
Requirements
3 POINTS:
Prepare an Environmental Management Plan and conduct a complete Erosion
Sedimentation Control Plan (ESCP) by:
1. Implementing the ESCP.
2. Implementing the EMP strategies including the monitoring of air quality by
controlling the generation of fumes, dust, and smoke on-site and providing noise
control measures on-site to reduce noise pollution; AND
Adhere to the requirements of MSMA, and attain the approval of the Department of
Irrigation and Drainage and related agencies.
Justification
The EMP is crucial as it specifies how to reduce the potential impacts of the proposed
development or redevelopment.
Carbon Calculator
None
28
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Project Environmental Management Plan.
Construction Assessment:
1. Environmental Management Execution Report, including photographic evidence.
29
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS4 Factors in Stormwater Management IS 4.1 Ci
Aims
To limit the destruction to natural stormwater capacities by reducing hardscape and
increasing on-site infiltration. Ensure that the post-development run-off discharge rate
and quantity are equal to or less than the pre-development run-off discharge rate and
quantity.
Requirements
1 POINT:
Implement target and strategies according to the Urban Stormwater Management
Manual for Malaysia or better known in Malaysia as Manual Saliran Mesra Alam (MSMA).
Implementation is based on the project case:
Justification
Uncontrolled stormwater run-off can cause overflows into rivers and lakes and contribute
to flash flooding. Control of stormwater run-off minimises and controls nuisance flooding
and provides safe passage of fewer frequent flood events as shown in Figure 5.
30
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 5. The Impact on natural hydrology according to land cover in roads, buildings, and
parking lots.
Figure 6. Turfgrass cover in a watershed and the impact on biotic integrity in associated streams.
Carbon Calculator
None
Submittals
Design Assessment:
1. MSMA calculation report.
2. Drainage plan according to MSMA.
Construction Assessment:
1. As-built drainage plan drawing.
2. Photographic evidence.
31
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
32
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS4 Factors in Stormwater Management IS 4.2 Ci
Aims
To ensure the quality of run-off into receiving water bodies and streams through efforts to
implement the best management practices in ensuring reduced pollution impact to the
stormwater.
Requirement
I POINT:
Implement the Urban Stormwater Management Manual for Malaysia:
MyCREST requires that the BMPs used to treat the run-off must be capable of removing
80% of the average annual post-development of the total suspended solids (TSS).
Justification
Rainfall in urbanised areas washes contaminants from the atmosphere, and the resultant
run-off washes materials accumulated on the surface into a stormwater system.
Stormwater management for quality minimises the environmental impact of urban run-
off on water quality.
These additional run-offs can erode watercourses (streams and rivers) as well as cause
flooding and pollution after the stormwater collection systems are overw helmed by
additional flows.
Pollutants enter surface waters during precipitation events. Daily human activities result
in the deposition of pollutants on roads, gardens, roofs, greenery, urban spaces, and
agricultural land, etc. W hen it rains—or irrigation occurs—water runs off and ultimately
makes its way into a river, lake, or the ocean. W hile there is some attenuation of the
pollutants before entering the receiving waters, the quantity of human activity results in
large enough quantities of pollutants to impair these receiving waters.
33
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The BMPs are used to refer to both structural or engineered control devices and systems
(e.g. retention ponds) to treat polluted stormwater and operational or procedural
practices. There are many forms of stormwater management and BMPs, including:
1. Manage stormwater to control flooding and erosion.
2. Manage and control hazardous materials to prevent the release of pollutants into
the environment (source control).
3. Plan and construct stormwater systems, so contaminants are removed before they
pollute surface waters or groundwater resources.
4. Acquire and protect natural waterways where they still exist or can be
rehabilitated.
Due to the emphasis on greenery and carbon capture mechanisms and strategies,
MyCREST encourages a strategic focus on or the inclusion of non-structural or natural
mechanisms including "soft" structures such as ponds, swales, or wetlands to work with
existing or "hard" drainage structures such as pipes and concrete channels.
Currently, in line with MASMA’s low impact development (LID), wet weather green
infrastructure is encouraged through a variety of techniques, including strategic site
design, measures to control the sources of run-off, and thoughtful landscape planning.
This includes a more green approach rather than the traditional stormwater
management which deals mainly with conveying the excess run-off through a drainage
system to the nearest waterway.
The current MASMA and sustainable stormwater management approach that is evolving
essentially aims to integrate stormwater infrastructure planning with greener approaches
to address the impacts of rainwater and stormwater run-off. These include suitable
measures using BMPs such as bio-retention areas, grass swales, rainwater harvesting,
permeable pavements, and green roof in a stormwater management plan.
At the master plan level, strategies such as wetlands and ponds or vegetative strip are in
line with this approach. Constructed wetland is a man-made system that involves altering
the existing terrain to simulate wetland conditions. They primarily attempt to replicate the
treatment that has been observed to occur when polluted water enters the natural
wetland. This wetland has been seen to purify water by removing organic compounds
and oxidizing ammonia, reducing nitrates, and removing phosphorus. The mechanisms
are complex and involve bacterial oxidation, filtration, sedimentation, and chemical
precipitation.
off and to remove nutrients from diverse sources in rural catchments has received much
attention lately. Thus, wetlands are essentially the filtering area, the “kidneys” of the
catchment, intercepting water flow, trapping sediment and pollutants, removing toxic
substances (pesticides, herbicides, metals), and assimilating nutrients and energy derived
from the upstream catchment area (Refer Figure 7.1, 7.2 and 7.3).
Structural Measures
Structural measures, such as rainwater collection system, manhole treatment devices,
and ponds, can be used to remove pollutants in run-off from impervious areas. In some
cases, this water can be reused for irrigation or building flush fixtures. Structural measures
can be used on urban or constrained sites and make it possible to effectively clean the
run-off with minimal space allocation and land use. For existing sites with greater than
50% imperviousness, structural techniques may include restoring and repairing
deteriorated storm sewers or separating combined sewers.
If the project uses structural controls, confirm that the equipment can accommodate at
least 90% of the annual rainfall volume.
If the project uses both structural and non-structural measures, each of which is designed
to handle less than 90% of the annual rainfall volume, describe how the measures work
together to satisfy the requirements of this credit.
In addition, the BMPs used in the project must be capable of removing 80% of the
average annual post-development load of total suspended solids, based on existing
monitoring reports as exhibited in Table 1.
35
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Table 1: Management Practices for Removing Total Suspended Solids from Run-Off
Average
Probable
TS
Range of Factors to Consider
Removal TSS
Removal
Effectiveness of Management Practices for Total Suspended Solids Removal from
Runoff
Soil percolation rates, trench
Infiltration Basin 75% 50–100%
surface area, storage volumes
Soil percolation rates, trench
Infiltration Trench 75% 50–100%
surface area, storage volumes
Runoff volume, slop, soil
Vegetated Filter Strip 65% 40–90%
infiltration rate
Runoff volume, slop, soil
Grass Swale 60% 20–40% infiltration rate, vegetative cover,
buffer length
Porous Pavement 90% 60–90% Percolation rates, storage volume
Open Grid Pavement 90% 60–90% Percolation rates
Sand Filter Infiltration Treatment volume, filtration
80% 60–90% media
Basin
Maintenance, sedimentation
W ater Quality Inlet 35% 10–35%
storage volume
W ater Quality Inlet with Sedimentation storage volume,
80% 70–90%
Sand Filter depth of filter media
Sedimentation storage volume,
Oil/Grit Separator 15% 10–25%
outlet configuration
Extended Detention Dry Storage volume, detention time,
45% 5–90% pond shape
Pond
W et Pond 60% 50–90% Pool volume, pond shape
Extended Detention Wet Pool volume, pond shape,
80% 50–90% detention time
Pond
Storage volume detention time,
Constructed Stormwater pool shape, wetland’s biota,
65% 50–90%
W etlands seasonal variation
ADVANCES IN H
ADVANCES INYDRO -SCIENCE
HYDRO -SCIENCE ANDE
AND ENGINEERING, ,VVOLUME
NGINEERING OLUMEVI
VI 9 9
Figure 7.1. Example of ponds including wetland (swale and wet pond).
36
Figure
M yCREST © 2020 Reference 66 Dry
FigureGuide
Dry Ponds
Ponds
Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Project report and calculation on stormwater as per the requirement of MSMA.
2. Drainage plan and on-site detention pond according to the requirement of
MSMA.
Construction Assessment:
1. As-built drainage drawing plan and on-site detention pond.
37
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS4 Factors in Stormwater Management IS 4.3 Cr
Aims
To enhance stormwater strategies to contribute to the urban landscape or increase the
greening of the environment. To focus on natural non-structural practices rather than
structural BMPs.
Requirements
1 POINT:
Implement natural strategies such as bio-swales, the use of soil with significant infiltration
rate to promote natural infiltration, rain gardens, increased wetlands, and other related
strategies in landscape and greenery elements.
Justification
Apart from enhancing the stormwater quality, integrating carbon sequestration
strategies into a stormwater management plan helps to capture the carbon dioxide in
the atmosphere.
38
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
All calculations for this sub-criterion All calculations for this sub-criterion
contribute to: Calculator ID: IS-CAL01 contribute to: Calculator ID: IS-CAL02
Carbon Accounting On Site - Design Carbon Accounting On Site - Verification
Submittals
Design Assessment:
1. Landscape/bio-swales/rain garden drawing.
Construction Assessment:
1. As-built landscape/bio-swales/rain garden drawing.
2. Photographic evidence.
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS5 Low-Carbon Transport Factors IS 5.1 Ci
5.1 Accessible Public Transport – Bus Line & Railway Station 1 Point
Aims
To reduce pollutions and impacts of development arising from the transportation sector.
Requirements
1 POINT:
Locate building within 800 meters of a railway station; OR
Locate building within 400 meters of public bus lines or bus stop ; OR
Provide a shuttle link which permits access to transportation between the building and
public transport to meet the requirements above.
Justification
Developing a project within public transportation stops will encourage people to use the
public transport available within the area for commuting to work or leisure.
Carbon Calculator
None
Submittals
Design Assessment:
Site plan displaying the building location and distance in connection to public
transportation services.
40
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
Photographic evidence.
41
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS5 Low-Carbon Transport Factors IS 5.2 Ci
Aims
To encourage and promote walkability and a healthy lifestyle, and to ensure comfort
and ease of access to public transport elements, including transit nodes and stations.
Requirements
1 POINT:
Provide covered pedestrian walkways to encourage pedestrians to walk from transit
nodes such as a bus stop or a railway station to the entrance of a building.
Justification
To provide facilities that will encourage more people to move from one place to another
by walking. In hot and wet conditions, it is better to cover the pedestrian walkway.
42
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Site plan showing the covered walkway line from the bus stop to the building
entrance and detail drawing of the covered walkway.
Construction Assessment:
1. As-built site plan drawing, showing the covered walkway line from the bus stop or
railway station to the building entrance.
2. Photographic evidence.
43
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
6. Leyden, K. M. (2003). Social capital and the built environment: the importance of
walkable neighbourhoods. American journal of public health, 93(9), 1546-1551.
7. Galingan, Z. C., Alcazaren, P. G., Ramos, G. C., & Santos, R. B. (2009). Pedestrian-
friendly streetscape in a tropical business district. MUHON: A Journal of
Architecture, Landscape Architecture, and the Designed Environment, 1(3), 9-15.
44
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS5 Low-Carbon Transport Factors IS 5.3 Ci
Aims
To contribute to limiting greenhouse gas emission and environmental impacts arising from
private car usage.
Requirements
1 POINT:
Designate 5% of the total parking bays provided in the project as designated parking lots
for carpooling and low-emission vehicles (electric/hybrid/gas/biofuel). Signage
(signboards, painted signs, etc.) must be provided and placed clearly at the parking lots.
Justification
In MyCREST, this will help developers to provide such facilities. Using
hybrid/electric/biodiesel transport will significantly reduce the emission of CO2 as
depicted in Figure 10.1.
Figure 10.1. Promoting low-emission vehicles by providing designated parking in each parking
lot.
45
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 10.2. Promoting low-emission vehicles by providing designated parking in each parking
lot.
Carbon Calculator
None
Submittals
Design Assessment:
1. Detailed building plan with parking bays marked as specified bays for low-emission
vehicles.
2. Calculation of the total parking bays for low-emission vehicles.
Construction Assessment:
1. As-built site plan drawing, indicating the specified bays for low-emission vehicles.
2. Photographic evidence.
46
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS6 Urban Heat Island Mitigation IS 6.1 Cr
Aims
To reduce the long-term effect of urban heat island (UHI) by reducing heat absorption
through roof/ wall surfaces.
CALCULATOR CALCULATOR
IS-CAL03: URBAN HEAT ISLAND IS-CAL04: URBAN HEAT ISLAND
MITIGATION - DESIGN MITIGATION - VERIFICATION
Requirements
SRI for Roof
1 POINT:
At least 80% of the roof area uses materials with ≥ 29 SRI for roofs which are > 23°, and
materials with ≥ 78 SRI for flat roofs which are > 4°.
Use roofing materials with a Solar Reflectance Index (SRI) equal to or greater than the
values in the table below for a minimum of 75% of the roof surface.
Green Roof/Wall
1 POINT:
At least 50% of the flat roof area is prepared for shady trees or non-intensive landscaping
comprising grassy area or shrubs; OR
At least 20% of the total façade area must be designed as a landscaped wall.
Justification
Absorption and retention of solar energy are increased by low SRI surfaces. W hen the
ambient temperature gets cooler, the retained solar energy is radiated to the
atmosphere, resulting in warmer temperatures under urban conditions and landscapes.
These landscapes have large areas of constrained surfaces of low reflectance. This
phenomenon is known as the “heat island effect”. It can be minimised by using shading
or reflective surfaces of increased temperature in an urban landscape and through
evaporate-transpiration by fauna. This is achieved by further planting trees, low-level
greenery, or through strategically planned landscaping.
Green Roof/Wall
For green roof and walls design, the installation cost should be considered during the
planning and designing stage. Consultation by expert landscape architects or
horticulture experts is needed if the designer is less experienced with the suitable plant
materials and techniques as illustrated in Figure 11 for green roof and Figure 12 for green
wall.
Figure 11. Vegetated roof for at least 30% of the roof area.
48
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
Green Roof/Wall
Submittals
Design Assessment:
SRI for Roof
1. Catalogue with SRI table for roof material.
2. Roof area calculation.
3. Roof plan.
Green Roof/Wall
1. Roof conceptual design.
2. Detail drawing of the landscape approach.
Construction Assessment:
SRI for Roof
1. Catalogue with SRI table for roof material.
2. Roof area calculation.
3. As-built roof plan.
4. Photographic evidence.
Green Roof/Wall
1. Roof’s conceptual design.
2. Detail drawing of the landscape approach.
3. Photographic evidence.
49
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Sample Calculators
50
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS6 Urban Heat Island Mitigation IS 6.2 Cr
Aims
To reduce heat absorption in order to decrease the impact on the atmosphere for
occupants as well as on the surrounding flora and fauna.
CALCULATOR CALCULATOR
IS-CAL03: URBAN HEAT ISLAND IS-CAL04: URBAN HEAT ISLAND
MITIGATION - DESIGN MITIGATION - VERIFICATION
Requirements
SRI for Non-Roof
1 POINT:
Implement one or more strategies for 55% of site roads/sidewalks/courtyards/parking lots
from the list below:
1. Light colour or non-asphalt surfaces surrounding the building.
2. Shade (within 5 years of residence).
3. W alkway materials with a Solar Reflectance Index (SRI) of at least 29.
4. Grass paved area.
Justification
Absorption and retention of solar energy are increased due to dark coloured paved
areas and constructed surfaces. W hen the ambient temperature gets cooler, the
retained solar energy is radiated to the atmosphere, resulting in warmer temperatures in
urban landscapes. These landscapes have large areas of constrained surfaces of low
reflectance. This phenomenon is called the “heat island effect”.
52
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 15. Open grid pavement system for the parking area.
53
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
Provision of Grass Paved Car Park
Submittals
Design Assessment:
1. A site plan, showing the proposed pavement and grass paved area.
2. Landscape drawing.
3. Calculation showing compliance with the requirement.
Construction Assessment:
1. As-built site plan showing the proposed pavement and grass paved area.
2. As-built landscape drawing.
3. Photographic evidence.
54
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS7 Control of External Light Spill and Brightness IS 7 S
Aims
To minimise light trespass from the building and site, reduce sky-glow to increase night sky
access, improve night time visibility through glare reduction, and reduce development
impact on natural environments.
Requirements
1 POINT:
The project team must comply with the requirement for exterior lighting.
Classify the project under one (1) of the following zones, as defined in IESNA RP-33, and
follow all the requirements for that zone:
1. LZ1: Dark (developed areas within national parks, state parks, forest land, and rural
areas)
Design exterior lighting so that all site and building-mounted luminaires produce a
maximum initial luminance value of no greater than 0.01 horizontal and vertical
foot candles (0.1 horizontal and vertical lux) at the MyCREST project boundary and
beyond. Document that 0% of the total initial designed fixture lumens (sum total
of all fixtures on site) is emitted at the angle of 90 degrees or higher from nadir
(straight down).
2. LZ2: Low (primarily residential zones, neighbourhood districts, light industrial areas
with limited night time use, and residential mixed-use areas)
Design exterior lighting so that all site and building-mounted luminaires produce a
maximum initial luminance value of no greater than 0.10 horizontal and vertical
foot candles (1.0 horizontal and vertical lux) at the MyCREST project boundary and
no greater than 0.01 horizontal foot candles (0.1 horizontal lux) 3 meters (10 feet)
beyond the project boundary. Document that no more than 2% of the total initial
designed fixture lumens (sum total of all fixtures on site) are emitted at the angle
of 90 degrees or higher from nadir (straight down).
55
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
3. LZ3: Medium (all other areas not included in LZ1, LZ2, or LZ4, such as
commercial/industrial, and high-density residential)
Design exterior lighting so that all site and building-mounted luminaires produce a
maximum initial luminance value of no greater than 0.20 horizontal and vertical
foot candles (2.0 horizontal and vertical lux) at the project boundary and no
greater than 0.01 horizontal foot candles (0.1 horizontal lux) 4.5 meters (15 feet)
beyond the site. Document that no more than 5% of the total initial designed
fixture lumens (sum total of all fixtures on site) are emitted at the angle of 90
degrees or higher from nadir (straight down).
LZ2, LZ3, and LZ4 – For project boundaries that abut public rights-of-way, light
trespass requirements may be met relative to the curb line instead of the MyCREST
project boundary.
Justification
Excessive light pollution has been known to reduce the enjoyment of night sky and to
affect the ecology of the site. Particularly for projects located in suburban or rural
locations, the brightness of external lights and buildings can cause the ecological system
to be disturbed in terms of day and nocturnal patterns of living and sleeping of fauna in
the environment. To reduce light pollution that can block our view of the night sky and
cause human health problems as well as ecological problems for many birds, insects,
and other animals. Light pollution often represents night time lighting that is not
necessary, wasting energy while causing light trespass and contrast, thus reducing
visibility.
56
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
To achieve safe, efficient, and aesthetically pleasing lighting design, projects must aim
for lighting uniformity, low contrast, no glare, and preventing light from spilling off the site.
This can be achieved through judicious selection of fixtures with full cut -off that direct
light towards the ground but prevent it from shining up into the night sky.
Hence, the aim of this sub-criterion is to minimise light trespass from the building and site,
reduce sky-glow to increase night sky access, improve night-time visibility through glare
reduction, and reduce development impact from lighting on nocturnal environments.
Carbon Calculator
None
Submittals
Design Assessment:
1. Provide exterior lighting drawings with lighting fixtures as installed.
2. Submit the Lux Level Report.
Construction Assessment:
1. As-built exterior lighting drawings.
2. Lux measurement report for exterior lighting.
57
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS8 Environmental Impact from Construction Activity IS 8 Ci
8.1 Proper Timing of Erosion and Sedimentation Control Strategies
with Respect to Monsoon Season and Confine Construction
Activity 3 Points
8.2 Proper Implementation of Staging and Spill Prevention Plan
8.3 Implementation of Erosion and Sedimentation Control Plan
Aims
To optimise the conservation and utilisation of resources (land, water, natural habitat,
and energy), reduce site disruption due to laying, maintain ecology, and to preserve the
existing landscape and protect it from degradation during the process of construction .
Requirements
Ensure proper timing of erosion and sedimentation control strategies; preservation of top
soil; implementation of staging and spill prevention; and effective erosion and
sedimentation control.
IS 8.1 Proper Timing of Erosion and Sedimentation Control Strategies with Respect to
Monsoon Season and Confine Construction Activity
1 POINT:
Proper timing of erosion and sedimentation control strategies with respect to rain , and
confine construction activity to pre-designated areas.
Justification
The construction and application of erosion control measures include the protection of
slopes of greater than 10%. Sedimentation collection systems, drainage systems, and run-
off diversion systems shall be in place before the commencement of construction
activity.
The staging area divides the construction area into two or more sections to minimise the
area of soil that will be exposed at any time. Staging should be done to separate an
undisturbed land from land disturbed by construction activity and material storage.
Measures should be followed for collecting drainage water run-off from the construction
areas and material storage sites, and diverting water flow away from such polluted areas.
Temporary drainage channels and perimeter swale should be constructed to carry the
pollutant water directly to the treatment device or facility (municipal sewer line). The plan
58
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
should indicate how the above was accomplished on -site in advance of the
commencement of the construction activity.
Spill prevention and control plans should clearly state the measures to contain spills and
to dispose of contaminated material and hazardous wastes. It should also state the
designation of personnel trained to prevent and control spills, cleaners, and petroleum
products.
Figure 16. Silt fence and earth drain for slope surface run-off control.
59
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Preservation of existing soil and vegetation – Preservation and protection of existing soil
and vegetation by non-disturbance of specified site areas during construction is
recommended. This practice enables the retention of fully-grown mature trees and also
reduces avoidable erosion of bare soil due to the exposure to climate and human
intervention during construction (as depicted in Figure 18 and 19).
Figure 18. Silt trap failure due to poor maintenance and under-designed silt traps.
60
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Erosion and sedimentation control plan.
2. A drawing showing the site plan of existing and proposed buildings, existing
vegetation and slopes, and drainage pattern. Demarcate areas on the site plan
to which site activities will be limited.
Construction Assessment:
1. A work programme incorporating the weather forecast and related work plan
during rain.
2. Certificate of architect in prescribed format confirming the proper timing of
construction.
3. Site plan details of existing vegetation, buildings, slopes, and site drainage pattern;
staging and spill prevention measures; erosion and sedimentation control
measures; and measures adopted for topsoil preservation during construction as
mentioned in the approach & strategy above.
4. One document is to be submitted after the construction of the building, giving a
brief description along with photographic records to show that other areas were
not disrupted during the construction. The document should also include a brief
explanation and photographic records to show the adopted erosion and
sedimentation control measures.
61
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS9 Environmental Management Practice IS 9 Ci/S
Aims
To ensure the adoption of environmentally sustainable practices throughout the
construction stage, including encouraging effective environmental training to raise
environmental awareness and knowledge within the construction project team and
workers.
Requirements
IS 9.1 Implementation of Effective Environmental Friendly Programs
1 POINT:
Effective implementation of environmental friendly programmes, including monitoring
and setting targets to minimise energy use, water use, and construction waste.
Justification
Good and effective environmental management practice will foster the sustainable
development of the proposed project.
62
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
63
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Extract of the tender specification, showing the requirement for the contractor to
provide and implement environmentally friendly programmes to minimise energy
use, water use, and construction waste, in addition to details of the
environmentally friendly programs implemented.
Construction Assessment:
1. A certified copy of the main contractor’s/developer’s award or previous green
certification (any green rating available) for the building that the main contractor
was involved in; details of track records in the adoption of sustainable,
environmentally friendly, and considerate practices during construction.
2. An audited ISO 14001 report.
64
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
IS10 Emissions Reporting – Construction Machinery IS 10 Cr
Aims
To collect data on carbon emission released from transportation and machinery used
during the construction period and activity.
CALCULATOR
IS-CAL05: EMISSION REPORTING: CONSTRUCTION MACHINERY
Requirements
2 POINTS:
Submit emission reporting for construction machinery and transportation within the site.
The machinery is limited to the list of machinery specified in the carbon calculator.
Justification
The construction industry has seen an increase in the variety of engine fuels for site
transport and machinery, which emit lesser carbon emission. The aim of this credit is to
create awareness for the construction team on efforts to reduce carbon emission.
65
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
On many construction sites, site rules already encourage fuel-efficient plant operation.
There is a need for trainers, contractors, and sub-contractors to reinforce these
requirements.
Plant suppliers presently publish fuel consumption (typically litres per hour of diesel) for
various plant sizes and applications. However, fuel consumption information is not always
directly comparable. There is a need to develop standard duty cycles to create
comparable benchmarks.
Suppliers are beginning to make use of telematics to remotely track the use of vehicles.
This monitoring can provide useful data to benchmark performance and encourage
operators to use plants appropriately.
Challenges are to be addressed by implementing staff training. Even after being trained,
the transient nature of the construction workforce means that these skills should be
reinforced at each site. The benefits include savings in fuel costs, less noise and
particulate emission, improved plant/machine life expectancy, and site safety. The costs
of training and awareness are minimal; they can be included in the existing training
schemes and general site rules. The cost of producing standardised fuel consumption
data would be borne by the supplier.
Carbon Calculator
Construction Assessment
Submittals
Design Assessment:
1. Extract of the tender specification, showing the requirements or the obligation for
the contractor to monitor and record for Emissions Reporting – Construction
Machinery.
66
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. List of the transport and machinery used.
2. Carbon calculator for transportation and machinery within the construction site.
3. Site diary, log book, mileage data, trip, and petrol-fill receipts (endorsed by the
project manager or authorised personnel).
67
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON - ENERGY PERFORMANCE IMPACTS
POINT
EP Req1 Building Energy Efficiency Performance EP Req1 Cr
Aims
To demonstrate the reduction of a building’s energy consumption and carbon emission
significantly below the baseline without sacrificing thermal comfort.
CALCULATOR CALCULATOR
EP-CAL01: ENERGY MODEL TEMPLATE EP-CAL02: ENERGY MODEL TEMPLATE - VERIFICATION
Requirements
REQUIRED:
To demonstrate a 6% energy savings from the baseline; AND
To ensure thermal comfort parameters that comply with MS 1525.
Justification
Energy efficiency is a cornerstone and crucial criterion for achieving a low-carbon
design. The aim is to design the building envelope and systems to maximise energy
performance. In general, this can be achieved through efficient design, deliberate
mechanical and electrical system selection, and proper commissioning and monitoring.
These energy savings will translate directly into cost and operational savings.
2. Active Design:
a. Equipment.
b. The active design shall follow the minimum requirement for OTTV, RTTV,
lighting, and ACMV components and equipment under item 5, 6, 7, and 8
of MS 1525. Details of the modelling guideline can be referred to in
Appendix 2.
c. Baseline spaces by space Lighting Power Density (LPD) are as stated in EP4
Artificial Lighting.
d. ACMV Basis of Design must comply with the related requirements based on
ASHRAE 62.1 and ASHRAE 55.
69
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Other strategies include controlling fresh air with the use of C02 Sensors. In buildings
with long operational hours, energy saving has been demonstrated with the use
of recovery heat wheel. Significant savings can also be achieved through the use
of high-efficiency chiller plants and motors to reduce the overall plant energy
consumption at full or partial loads. Both efficient light sources and lighting controls
play a significant part in reducing energy usage and increasing efficiency. This
includes the installation and calibration of daylight sensors, motion sensors, and
occupancy-sensor lighting controls in all areas, including offices and intermittently
used areas.
Temperature and humidity controls, i.e., thermostats for offices enable individual
air conditioning control of individual offices. An exceptional score under the
MyCREST innovation category can be achieved if at least 50% of the total
individual rooms or staff work stations are equipped with individual thermal
controls to allow comfortable thermal regulation.
a. The spaces must be fully occupied and have functions whereby full-time
occupants and staff are stationed throughout the typical working day.
These include spaces such as ground floor lobbies where at least one staff
member is stationed in the space, cafés, canteens, restaurants, atriums,
and rest areas. Unoccupied spaces such as toilets, storage, and corridors
are not eligible to be included in the comparison. Lift lobbies can be
included if these are used throughout the working day. In total, the NV
spaces must not be more than 20% of the occupied areas.
70
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
d. Create and run the proposed design model with the selected areas as
naturally ventilated spaces with mechanical ventilation assistance.
e. They must demonstrate that they have complied with all airflow and
ventilation criteria and verify these with simulation as stipulated in “NON-AC
building scorecard” including CFD simulation and verification to ensure
both adequate airflow and thermal comfort are achieved in these spaces.
Consultant engineers are required to run the heat load calculation based on two
models, namely the baseline model and their proposed design model. Basically,
MyCREST requires teams to adjust the heat load calculations to comply with the
OTTV equal to 50W /m2 and RTTV equal to 25 W /m2. Once the required OTTV and
RTTV are achieved, the consultant needs to input the energy consumption in the
Baseline Calculation.
Documentation of the process load energy savings shall include a list of the assumptions
made for both the baseline and proposed design, and the theoretical or empirical
information supporting these assumptions.
Project teams can demonstrate energy savings and points gained from items related to
process loads through a report of the energy efficiency characteristics specification of
71
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
items related to the process loads. However, this must be submitted as an “exceptional
calculation methodology” where the efficiency of the process load-related items is
compared with its conventional counterpart. Project teams must demonstrate and
define with clarity and understanding what is considered the convention al efficiency or
energy use of its counterpart.
Carbon Calculator
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL01 Energy Model Template
Template - Verification
Design Assessment Construction Assessment
Submittals
Design Assessment:
1. Energy carbon calculation.
2. Energy calculation or simulation report.
3. A basic report containing:
a. Information on the method used to achieve thermal comfort for a project.
b. Explanation of how the project will allow individual thermal control for at
least 50% of all rooms and also thermal control for common areas.
Construction Assessment:
1. Final energy performance report that confirms the project meets the minimum
requirements of MS 1525 and has achieved 6% energy savings.
2. EM/BMS output or an overall energy audit report.
3. As-built drawing plan of the air-conditioning layout, showing the thermostat
location.
72
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP1 Building Envelope Performance – Thermal Performance EP 1.1 Cr
EP1.1 Building Thermal Performance:
OTTV ≤ 50 W /m²
Reduction of 3 W /m² in OTTV from the Baseline 4 Points
Reduction of 6 W /m² in OTTV from the Baseline
Reduction of 9 W /m² in OTTV from the Baseline
Aims
To control the amount of heat conducted, absorbed, and radiated into a building
through a building envelope. Controlling the rate of heat transfer into a building will
contribute to a reduction in building energy consumption.
Requirement
The overall thermal transfer value (OTTV) computed based on the methodology and
guidelines stipulated in MS 1525 should be:
1 POINT: OTTV ≤ 50W /m²; OR
2 POINTS: Reduction of 3 W /m² in OTTV from the baseline; OR
3 POINTS: Reduction of 6 W /m² in OTTV from the baseline; OR
4 POINTS: Reduction of 9 W /m² in OTTV from the baseline.
Justification
Passive strategies represent some of the most cost-effective strategies for energy
conservation. OTTV is an index developed to assess the combined impact of key passive
strategies related to heat conduction and radiation through the building envelope and
is a key aspect in assessing the passive design and energy conservation characteristics
of a building envelope. OTTV measures the heat gain transmitted through a unit area of
a building’s wall. OTTV is recorded in units of W /m². It concerns conductive and radiation
heat gains transmitted through glazing and opaque components. The control of OTTV
implies controlling the heat transfer through a building envelope. If the heat gain is
controlled, then the load on the air conditioner can be reduced, leading to lower
electricity consumption.
Strategies include the selection of glazing, window size, external shading to walls, wall
colour, wall type, and roof type at the early design stage to meet the OTTV criteria. It is
best that any measure to improve energy efficiency or save energy be considered in the
early planning stage of the building. Building energy efficiency regulation must include
the concept of OTTV as one of its aspects.
73
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
To select and specify the envelope design which considers, but is not exclusive to, the
following:
1. W all and roof construction systems that contribute towards decreasing cooling
loads.
2. Materials with a high resistance rate (R-value) that contribute to reducing the rate
of heat transfer.
Reference must be made to strategies and items outlined in MS 1525 apart from reducing
carbon dioxide gas emissions (CO2) into the atmosphere to achieve the minimum
requirement for building energy efficiency.
Size of the opening needs to be optimized to reduce heat absorption into buildings
through windows. Use appropriate simulation software to calculate the combined total
OTTV calculation (Refer Figure 22.1, 22.2 and 22.3). The building design should comply
with MS 1525, which consists of:
1. Materials containing resistance value to achieve low U heat transfer.
2. At the design stage, determining the material specifications for building envelope
must consider both factors above to achieve the desired OTTV value.
3. OTTV value ≤ 50 W /m² can be achieved through a building energy management
system.
Carbon Calculator
74
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. OTTV Calculation Report endorsed by the consultant.
2. Roof material specifications, indicating the desired U-value.
3. Catalogue from the supplier.
4. Brief explanation and U-value calculation for the suggested roof.
Construction Assessment:
1. OTTV Calculation Report endorsed by the consultant.
2. Delivery order of the installed cladding/glazing with specifications.
3. As-built drawing.
4. Catalogue from the supplier.
5. Photographic evidence.
76
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP1 Building Envelope Performance – Thermal Performance EP 1.2 Cr
Aims
To reduce the heat transferred into the building through the roof.
Requirements
1 POINT:
Roof without Skylight:
As per the requirement of MS 1525, the roof design should consider the rate of heat
transfer (U-value) according to the following categories:
1. If ≥ 50 kg/m2 : U-Value ≤ 0.6 W /m²K
2. If < 50 kg/m2 : U-Value ≤ 0.4 W /m²K
Justification
The guidelines are as stated in MS 1525, while the requirement is to reduce the external
heat gain transmitted through a unit area of the building’s wall or roof.
77
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
Submittals
Design Assessment:
1. Roof U-value and RTTV calculation, if any.
2. Section of the detail roof drawing.
3. Specification from the manufacturer.
4. Roof material specifications, indicating the desired U-value.
5. A brief explanation and U-value calculation for the suggested roof.
Construction Assessment:
1. As-built drawing of the roof plan and details.
2. Specification from the manufacturer.
3. Delivery order of purchased materials.
4. Roof material specifications, indicating the desired U-value.
5. A brief explanation and U-value calculation for the suggested roof.
6. Photographic evidence.
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP2 Fundamental Refrigerant Management EP 2 Ci
Aims
To reduce stratospheric ozone depletion.
Requirements
1 POINT:
Zero use of chlorofluorocarbon (CFC)-based refrigerants in the base building’s
ventilation, air conditioning, and refrigeration (MVAC&R) systems. W hen reusing existing
base building’s MVAC equipment, complete a comprehensive CFC phase-out
conversion prior to project completion. Phase-out plans extending beyond the project
completion date will be considered on their merits.
Existing small MVAC units (defined as containing less than 0.5 pounds [0.227 kg] of
refrigerant) and other equipment such as standard refrigerators, small water coolers, and
any other equipment that contains less than 0.5 pounds (0.227 kg) of refrigerant are not
considered part of the base building system and are not subject to the requirements of
this prerequisite.
Justification
The aim is to reduce ozone depletion impacts on the environment. Refrigerants have
varying applications, lifetimes, ozone-depleting potentials (ODPs), and global warming
potentials (GWPs).
Carbon Calculator
None
Submittals
Design Assessment:
1. Specification and brochure of the refrigerant used.
79
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Submit a list of as-installed refrigerants and clean agents.
2. Delivery order of the purchase of refrigerant and clean agents.
3. Photographic evidence.
80
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP 3 Decentralisation of Lighting Systems Control EP 3.1 Cr
Aims
To enable higher levels of control of artificial indoor lighting system through zoning and
layout.
Requirements
1 POINT:
Install at least 2 light switches for each room with an area of ≤ 30m. The number of
switches must be matched accordingly; AND
Prepare one light switch with labels for open spaces ≤ 30m² in size. If the room size is ≥
30m², the number of switches must be matched accordingly; AND
Light switches are to be placed near doorways and easily accessed; AND
Separate switches for lights parallel to natural lighting.
Justification
It has been demonstrated that the lighting layout design with proper area zoning will help
towards achieving the lighting energy-saving strategies and further savings. This will also
significantly contribute towards savings during the operation period , as occupants can
be reminded and educated to switch off electric lights when they leave the space. In
many cases, occupants can play a role to switch off lights when not needed ; however,
they have been unable to do so, as the zoning of lights does not enable them to switch
off when not used.
Open offices with an area of ≤ 30m² must include space partitions according to zone; if
≥ 30m², the number of switches must be matched accordingly with each switch clearly
labelled for the control of the respective lights.
The locations of switches must be near the entrance and exit as well as not obstructed
by doors. Lights must be located parallel with windows or glass walls for b uildings with
natural daylighting, with separate switches. Zone partition must be reduced to ease light
control, and only certain zones will have lighting.
81
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
All energy calculations for this sub-criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Template
Submittals
Design Assessment:
1. Show floor plan drawings, indicating the locations of switches and areas with
zones, as well as schematic drawings.
Construction Assessment:
1. As-built floor plan drawings, showing the locations of switches and areas with
zones, as well as schematic drawings.
82
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP3 Decentralisation of Lighting Control EP 3.2 Cr
Aims
To enable higher levels of control of artificial indoor lighting system to save energy.
Requirements
1 POINT:
Install automatic sensors in 60% of the common and circulation areas, as follows:
1. Staircases.
2. Toilets.
3. Car park.
4. Corridors.
5. W alkways, etc.
The energy saving impact from the use of sensors must also be calculated and included
under EP11 (building energy efficiency performance). The baseline model is assumed as
a model with spaces without sensors. An occupancy schedule following trends in
occupancy of specific spaces must be included as part of the calculations.
Justification
Automatic sensors can ensure that lights in intermittently occupied sp aces can be
switched off when not in use. If sensors are used in spaces other than the above, they
can be accounted for and achieve points under EP11. This particular sub-criterion is
specific towards the provision of automatic sensors in these areas.
Automatic sensors detect the presence or absence of people and turn lights on and off
accordingly.
The two most common sensor types are passive infrared, which require a direct line of
sight to the movement of infrared (heat) sources, and ultrasonic, which detect any
movement, human or otherwise (for example, curtains).
83
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Passive infrared (PIR) sensors, the most commonly used type, are able to "see" heat
emitted by occupants. Triggering occurs when a change in infrared levels is detected,
as when a warm object moves in or out of view of one of the sensor’s “eyes”. PIR sensors
are quite resistant to false triggering. They are best used within a range of 15 foot or 5 m
for two reasons: first, there are potential “dead” spots between their wedge-shaped
sensory patterns that get wider with distance; and, second, being passive, they do not
send out any signal. Instead, PIR sensors depend on the intensity of the heat output of
the moving part of the subject.
Carbon Calculator
All energy calculations for this sub-criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Template
Submittals
Design Assessment:
1. Floor plan showing all the common and circulation areas with the total estimated
floor area.
2. Floor plan (with the estimated sensor-controlled floor area), showing the locations
of automatic sensors including detailed electrical schematic drawings for the
installation of the automatic sensors.
3. Manufacturer’s technical data of the automatic sensors.
Construction Assessment:
1. As-built floor plan (with the estimated sensor-controlled floor area), showing the
locations of automatic sensors including detailed electrical schematic drawings
for the installation of the automatic sensors.
2. Manufacturer’s technical data of the installed photosensors.
3. The summary of field inspection results must include the locations of inspection
areas, locations of devices installed in floor plan drawings for each floor level,
manufacturer’s information/specification of the motion/occupancy sensors used,
and photographs of the devices installed in the building.
4. Photographic evidence.
84
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP4 Admission of Daylit Zone and Provision of Automatic Controls EP 4.1 Cr
Aims
To increase the admission of usable, glare-free natural light and to harvest daylight by
installing a lighting control system to dim lights and/or turn them off when there is
adequate daylight, especially at the perimeter.
Requirements
1 POINT:
Install automatic daylight sensors (photosensors) to regulate the perimeter of occupied
building spaces with ample daylighting.
Justification
Daylight sensors with well-designed artificial lighting systems can maximise the quality of
daylight. The highest efficiency can be reached in environments with ample daylight
coming through the windows. The intensity of artificial lighting is constantly adjusted to
reflect the incoming natural luminous flux. At noon, all or most of the illumination can be
provided by the sun while early or late in the day, this function is taken over by the artificial
lighting system. Thus, the provision of daylight sensors seems to be a useful method to
regulate daylighting of the entire occupied building spaces perimeter (as shown in Figure
23).
85
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
2. For east- and west-facing application, placement should be towards the south
side of the space and far enough from windows to avoid direct sunlight as
depicted in Figure 24.1, 24.2 and 24.3.
86
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
Submittals
Design Assessment:
1. Present a floor plan drawing showing the locations of automatic light sensors and
automatic sensors, including detailed electrical schematic drawings for the
installation of the automatic sensors.
2. A brief description of the proposed photo sensor application.
3. Manufacturer’s technical data on the installed photosensors.
Construction Assessment:
1. As-built floor plan drawing, showing the location of the automatic light sensors and
automatic sensors, including detailed electrical schematic drawings for the
installation of the automatic sensors.
2. Manufacturer’s technical data on the installed photosensors.
3. Photographic evidence.
87
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP4 Admission of Daylit Zone and Provision of Automatic Controls EP 4.2 CR
Aims
To increase the admission of usable daylight without glare or diffused interior daylighting.
Requirements
1 POINT:
Design ≥ 20% of the combination of all occupied building spaces and transitional spaces
(enclosed or perimeter circulation spaces) with a Daylight Factor in the range of 1.0% to
3.5% as measured at the working plane, 800 mm from floor level as per MS 1525; OR
2 POINTS:
Design ≥ 30% of the combination of all occupied building spaces and transitional spaces
(enclosed or perimeter circulation spaces) with a Daylight Factor in the range of 1.0% to
3.5% as measured at the working plane, 800 mm from floor level as per MS1525; AND
The project team can include the use of automated or the installation of manual solar
shading blind shades in lieu of the above.
Justification
The two primary reasons for using daylight to meet the illumination requirements in
occupied building spaces and transitional spaces are psychological benefits and energy
savings benefits. Good daylighting has been shown to improve the overall attitude,
satisfaction, and well-being of building occupants.
In the tropical climate, external luminance and sky brightness are high throughout the
working day. The provision of daylight will not be effective and successful without the
88
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
control of glare under such conditions. Many green building case studies have shown
that daylight strategies were unsuccessful as the control of glare was not considered and
implemented. A number of research studies have shown a variety of benefits of
daylighting in different building types and functions; among them are improved retail
sales, increased worker productivity, reduced absenteeism in office buildings, improved
student educational performances, and improved patient recovery time in hospitals.
Exposure to daylight has also been shown to improve general health and circadian
rhythm.
However, such benefits can only be realised under hot climatic conditions with the
control and reduction of glare.
Daylighting, with proper electric lighting controls, can result in significant energy savings
by reducing electric lighting loads and associated cooling loads as illustrated in Figure
26.
89
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
During the design process, the following design strategies should be understood and
explored:
1. Increase the perimeter daylight zones. Extend the perimeter footprint to maximise
the usable daylighting area.
2. Allow daylight penetration high in the space. W indows located high in a wall or in
roof monitors and clerestories will result in deeper light penetration and reduce the
likelihood of excessive brightness.
3. Reflect daylight within the space to increase room brightness. A light shelf, if
properly designed, has the potential to increase room brightness and decrease
window brightness.
4. Slope ceilings to direct more light into the space. Sloping the ceiling away from
the fenestration area will help increase the surface brightness of the ceiling further
into the space.
5. Avoid direct beam daylight on critical visual tasks. Poor visibility and discomfort
will result if excessive brightness differences occur in the vicinity of critical visual
tasks.
6. Filter daylight. The harshness of direct light can be filtered with vegetation,
curtains, louvres or the like, and will help distribute light.
7. Understand that different building orientations will benefit from different daylighting
strategies; for example, light shelves—which are effective on south facades—are
often ineffective on east or west elevations of buildings.
Some strategies that may be employed to reduce unwanted daylight glare include:
1. Provision of side lighting concept which provides daylight through apertures
located on the perimeter of the wall of a building. The concept involves two types
of the glazing system, namely daylight glazing and view glazing. To maximise
daylight penetration and reduce window glare, it is advisable to separate the
daylight aperture from the view aperture (Figure 27).
90
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 27. Side lighting concept usually involves the provision of light shelves.
Carbon Calculator
Submittals
Design Assessment:
1. Typical floor plans indicating the identified occupied building spaces/transitional
spaces.
2. Typical floor plans, sections, and detail drawings, showing the variable position of
any glare control system.
3. Simulation results of Daylight Factor on the floor plans.
91
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Present as-built floor plan drawing, which clearly marks the locations of the
occupied building spaces, transitional spaces, and the position of the glare
control system.
2. The summary of field measurement sampling results must include the locations of
inspection areas, luminance results (lux) in floor plan drawings for each floor level,
manufacturer’s information/specification of the photosensors used, and
photographs of the devices installed in the building.
92
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP5 Artificial Lighting EP 5.1 Cr
Aims
To achieve increased energy efficiency in terms of lighting power and to utilise lighting
technologies and sources beyond the required standard to reduce the CO 2 impact
associated with high energy use.
Requirements
1 POINT:
At least 15% improvement in Lighting Power Density (LPD) from the baseline; OR
2 POINTS:
At least 20% improvement in Lighting Power Density (LPD) from the baseline; OR
3 POINTS:
At least 25% improvement in Lighting Power Density (LPD) from the baseline; OR
4 POINTS:
At least 30% improvement in Lighting Power Density (LPD) from the baseline, AND
Comply with the lux levels recommended (space by space) based on the baseline in MS
1525 and ASHRAE 90.1.
Justification
Comply with the LPD guidelines to improve energy efficiency by reducing wasteful
designs and limiting the power allowed for lighting without compromising occupants’
comfort and visual performance. Reduce the connected LPD to below the baseline
stated in MS 1525 and ASHRAE Standard 90.1 by using either space by space method or
area weighted whole building lighting power average.
93
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
94
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
95
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Fellowship Hall 10
*Values taken from MS1525 in order to take into account the technology present in the
market. In preparing the submission for MyCREST assessment, it is advisable for the project
to refer to the latest edition of the standards.
Carbon Calculator
All energy calculations for this sub-criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Template
Design and Construction Assessment
96
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Light Power Density calculation.
2. Typical floor plans indicating the identified occupied building spaces.
3. Present data on the brightness level of each area through manual calculation
method or simulation software.
4. A summary report on lighting strategies and spatial allocation as to how the credit
will be met. The report should also include all lighting simulation results and
table/SOA of all participating occupied building spaces.
Construction Assessment:
1. As-built drawing of the lighting layout plan.
2. Lighting schedules showing the numbers, locations, and types of luminaries and
the power rate used.
3. Calculation of the installed lighting power rate and the percentage improvement.
4. Technical product information of the lighting used.
97
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP5 Artificial Lighting EP 5.2 CR
Aims
The aim is to achieve increased energy efficiency beyond the required standard to
reduce the CO2 impact associated with high energy usage.
Requirements
1 POINT:
Utilise high-efficiency light fittings for 24 hours functional lighting including at the car park
(i.e., emergency and exit signage). In particular, provide energy efficient lighting for
covered car park areas. The lighting power density of the car park areas must comply
with values in accordance with ASHRAE 90.1.
Justification
The 24-hour areas represent one of the highest potential to save energy from electric
lights. W ith the use of high-efficiency light fittings, energy consumption can be
significantly reduced.
Carbon Calculator
All energy calculations for this sub-criterion contribute to:
Calculator ID: EP-CAL01 Design Energy Performance
Construction Assessment:
1. Specification/delivery order of the LED lights.
2. As-built drawing showing the locations of LED lights.
98
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP6 Individual Metering EP 6 Ci
Aims
To encourage sub-meter installation to allow the monitoring of energy usage in a
building.
Requirement
1 POINT:
Installation of sub-meters on switchboards for each service system that is ≥ 100kVA of the
Total Connected Load (TCL).
This criterion refers to building service engineering systems within a building such as air
ventilation, lift, fire alarm, lighting systems, and others. Apart from division according to
service systems, metering according to level and renting (agency, unit) may also be
considered.
Justification
Sub-meters are useful for monitoring the energy usage of equipment items or circuits.
Sub-meters can reveal operational inefficiencies, demand spikes, and other bottom-line
impacting events while increasing the facility’s operational effectiveness.
Potential Issues
Most switch systems and light system are located on one board. Each service must be
divided for each switchboard, especially for lighting systems and sockets.
Carbon Calculator
None
99
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Present electrical schematic drawings which show the location of the sub-meter
on the main switchboard and on the small switchboard for each service of ≥ 100
kVA (TCL).
Construction Assessment:
1. Present as-built electrical schematic drawings which show the location of the sub-
meter on the main switchboard and on the small switchboard for each service of
≥ 100 kVA (TCL).
100
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
DESIGN
EP7 Renewable Energy EP 7 Cr
Aims
To encourage the use and installation of renewable energy sources to reduce the effects
of environmental pollution and reduce greenhouse gas emissions.
Requirements
1 POINT:
Provide renewable energy of 0.5% of the total building electrical consumption.
2 POINTS:
Provide renewable energy of 1% of the total building electrical consumption.
3 POINTS:
Provide renewable energy of 2% of the total building electrical consumption.
4 POINTS:
Provide renewable energy of 3% of the total building electrical consumption.
Justification
Renewable energy is a source of clean energy with no pollution impact. However, to be
sustainable and carbon reducing, an energy source must meet the following criteria:
1. Have minimal or no negative environmental or social impact.
2. Meet the needs of people today and in the future in an accessible, equitable,
and efficient manner.
3. Protect air, land, and water and not deplete natural resources.
4. Have little or no net carbon or other greenhouse gas emissions.
5. Have safety mechanisms and not burden future generations with unnecessary
risks.
Potential Issues
1. On-site research and feasibility studies should be conducted before the concept
design. This includes ensuring no significant overshadowing occurs that can result
in less optimum system performance.
101
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
2. At times, the site and location of the installation may not be within the MyCREST
project boundary. MyCREST allows this exception and unique condition as long as
the designed system is installed within a master plan boundary and owned and
operated by the same owner.
3. Feed-in-tariff incentives can be used to demonstrate the return on investment
(ROI) of such systems. However, when calculating the energy savings above the
baseline, the savings must be based on kWh per year and not cost savings.
4. A system that is totally off-site (not within a project boundary or a master plan
boundary) cannot be included in the savings calculation. However, exceptions
can be considered and subject to the MyCREST Review Committee’s decision.
Carbon Calculator
102
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Provide the calculation of renewable energy prediction from the system, including
drawings for the installation.
2. Manufacturer’s specification on the renewable energy system.
Construction Assessment:
1. As-built drawings and report of testing which meet the design requirements.
2. Determine the performance of the renewable energy generation systems by using
trend logged-data of the energy generated.
3. Demonstrate the implementation and functionalities of the renewable energy
generation systems and determine compliance with the committed design
specifications.
103
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP8 Metered Electricity Usage During Construction EP 8 CR
Aims
The aim is to record the electrical consumption during the construction stage and hence,
minimise energy usage by on-site utilities.
CALCULATOR
EP-CAL03: METERED ELECTRICITY USAGE
DURING CONSTRUCTION
Requirements
1 POINT:
Provide a copy of the monthly electricity bills during the entire construction period.
Justification
During the construction period, carbon is emitted through the usage of electricity for the
site office, workers’ accommodation, and activities held during the construction stage.
Carbon Calculator
Submittals
Design Assessment:
1. A Declaration Letter to submit the monthly electrical bills during construction.
Construction Assessment:
1. A copy of the monthly electrical bills for the entire construction period.
2. List of the areas/activities (i.e., site office, worker amenities, canteen, etc.) that are
covered by the electricity bills.
104
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
PART B.
MyCREST EP
(Energy Performance)
Criteria Scorecard
105
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP9 Commissioning of Building Energy Systems EP 9 Ci
Aim
To ensure the systems, appliances, and amenities are integrated, installed, and fine-
tuned as per the project owner’s requirements.
Requirements
5 POINTS:
Designate an individual as the Commissioning Engineer (CxE) to review and oversee the
integration and proper commissioning of the installed systems, including:
1. Review owner’s project requirements and basis of design.
2. Review the commissioning requirements prepared by the consultant and
specialist contractor.
3. Review the commissioning plan prepared by the consultant.
4. Verify the installation and performance of the systems to be commissioned.
The individual appointed as the CxE must be independent of the project’s design and
construction management, though the CxE may be an employee of any firm providing
those services. The CxE may also be a qualified employee or consultant of the owner.
The owner must document the owner’s project requirements. The design team must
develop the basis of design. The CxE must review these documents for clarity and
completeness. The owner and design team must be responsible for updating their
respective documents.
Justification
Commissioning is a process of verifying that building systems are performing as intended
and according to the owner’s requirements as outlined in the project documents. This
can lead to a fully optimised building, using less energy and keeping occupants
comfortable and productive. Commissioning is often thought of as a single point in a
construction project, carried out before the handover. In reality, if a building is to be as
efficient as possible, commissioning will need to begin at the start of the project and
include continuous monitoring and fine-tuning during the operation.
106
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
A Registered Electrical Energy Manager (REEM) with the Energy Commission of Malaysia
with at least 5 years of experience on energy audit and energy management; OR
Any personnel that possesses relevant qualifications and experience that are approved
by MyCREST.
Carbon Calculator
None
Submittals
Design Assessment:
1. Appointment documentation of the Commissioning Engineer (CxE).
2. CV of the appointed CxE.
3. Submittal listed under the qualification of the CxE.
Construction Assessment:
1. Final Commissioning report.
109
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP10 Air Penetration EP 10 Cr
Division of Air-Conditioned and Non-Air-Conditioned Areas
Design Strategies for Minimum Air Infiltration/Penetration for Air- 2 Points
Conditioned Areas
Aims
To prepare adequate measures to avoid unregulated airflow for air-conditioned areas.
Requirements
1 POINT:
Ensure the separation and division of air-conditioned and non-air conditioned areas are
undertaken, and infiltration is controlled between these areas.
1 POINT:
Provide design strategies to minimise air leakage/air penetration for the air-conditioned
areas.
Justification
Air infiltration (also referred to as leakage) is the uncontrolled flow of fresh air through
gaps and cracks in a building envelope. Ventilation is a natural process that moves fresh
air into a building (usually from the outside) and removes stale air. Although it is an
important part of a healthy living environment, uncontrolled air infiltration can alter the
desired airflow patterns, temperature, and humidity conditions within a building.
Uncontrolled air infiltration can cause reduced air quality and comfort along with
reduced efficiency of a building’s ACMV system. Common locations of air infiltration
include door and window frames, a poorly insulated attic, electrical outlets, chimney
ducts, and plumbing penetrations.
Reducing sources of unwanted air infiltration in a new building requires attention to the
building envelope. Reducing air infiltration into a building will allow for more efficient use
of the MVAC system, which may translate into energy saving if the strategy is
implemented properly. During the raining season, air exfiltration (or the loss of air from a
building) is more important. In fact, exfiltration accounts for 25% to 40% of the energy
used to run the MVAC system of a conventional building.
There are many strategies to reduce unwanted air infiltration , including air barriers,
sealants, tightly built doors and windows, and weather stripping. In general, these
strategies all serve as barriers to the movement of air through the envelope of a building.
Every crevice or hole in the building’s construction must be sealed to create a continuous
air barrier. This is in addition to constructing physical barriers to air movement and densely
packing insulation into wall cavities.
A blower door test can be used for quality control to test the air sealing of a new building.
The test involves temporarily fitting a fan into the building’s doorway and measuring the
rate of airflow needed to keep the building at a certain pressure. The controlled airflow
created by this procedure can be used to identify air leaks in a building’s envelope.
Therefore, minimising air infiltration should be considered in detail during the planning
and construction phases of any new building. It is also important that a properly sealed
building has an efficient ventilation system to ensure a healthy supply of fresh air (Refer
Figure 29.1 and 29.2).
Carbon Calculator
None
111
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Preliminary designs, displaying air-conditioned zones.
2. Schedule of Accommodation (SOA).
3. Plans displaying ante-room area labels, and air-conditioned and non-air-
conditioned areas.
4. Design drawing for air conditioning systems.
5. Concept design brief on the prevention of air leakage/air penetration for air-
conditioned areas.
Construction Assessment:
1. As-built plans displaying ante-room area labels, and air-conditioned and non-air-
conditioned areas.
2. As-built drawing for air conditioning systems.
112
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP11 Building Energy Management System EP 11 Cr
Aims
To promote the use of an energy management system to integrate and monitor all
equipment in ensuring energy usage is monitored and controlled more efficiently.
Requirements
1 POINT:
Install an Energy Management System (EMS) within the building as per MS1525.
Justification
A building cannot be considered green if it is not energy efficient. The energy used by
buildings is mostly generated by burning fossil fuels, which release greenhouse gas
emission that contributes to climate change. No building should be defined as “green”
unless it consumes less energy and generates fewer greenhouse gas emissions than
average or conventional buildings. To manage energy consumption, the building shall
monitor and control the system efficiently.
The EMS should have three (3) main functions, namely control of equipment, monitoring
of equipment, and integration of equipment sub-systems as per MS1525.
This is to standardise indoor services and design requirements for integration into the
system at the design stage, as per the requirement and provision in MS1525.
Carbon Calculator
All energy calculations for this sub- All energy calculations for this sub-
criterion contribute to: criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL02 Energy Model
Template Template - Verification
113
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design and Construction Assessment:
1. Floor plan.
2. Circuit diagram.
3. Input-Output (I/O) Point.
114
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP 12 Energy Efficient Unitary Air Conditioning Systems EP 12 Cr
Aims
To reduce the energy consumption and at the same time to maintain the comfort and
performance for occupants in both temperature and noise level.
Requirements
Use energy-efficient split unit air conditioners to meet the following requirements:
1 POINT
Provide that all unitary air conditioning systems used are labelled “4 Star Energy Efficient”
by Energy Commission.
OR
The EER must follow the requirement of TIER 2 tabulated in CEE Commercial Unitary AC
and HP Specification: Unitary Air Conditioning Specification, 6 January 2012.
Justification
In Malaysia, energy is generated primarily through the use of electricity; hence, it is
essential to minimise building energy consumption in a holistic way. Apart from passive
design strategies, the application of energy-efficient split unit will reduce the energy
usage of a building. Meanwhile, a reduction of building energy consumption leads to a
direct reduction of CO2 emissions.
Inverter Technology
Through advanced technology, inverter air conditioners are more economical to
operate and quieter to run than conventional units. They can handle greater extremes
in temperature, are smoother and more stable in operation, and can reach the desired
temperature more quickly than conventional air conditioners.
Inverter Control
The inverter component allows the outdoor unit to vary its speed and output to match
the required capacity of the indoor unit. Thus, the inverter model can achieve 30% more
operating efficiency than conventional models and therefore, is much less expensive to
run.
115
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Quiet Operation
A unit to include a quiet fan speed (“Quiet Mode”) to make sure the noise level is
maintained.
116
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
1. The Star ratings based on the EER values are indicated below:
5 ≥ 11.94
4 11.16–11.93
3 10.37–11.15
2 9.56–10.3
1 9.00–9.55
b) ≤ 7.1 kW
5 ≥ 10.71
4 9.83–10.70
3 8.94–9.82
2 8.03–8.93
7.50–8.02
1
Carbon Calculator
All energy calculations for this sub- All energy calculations for this sub-
criterion contribute to: criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL02Energy Model
Template Template - Verification
117
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. A plan showing the location of the unitary air conditioning system.
2. Unitary air conditioning system detail drawing.
3. Product brochure including specifications and energy efficient label from Energy
Commission.
Construction Assessment:
1. As-built plan showing the location of the unitary air conditioning system.
2. Product brochure of the installed unitary air conditioning, including specifications
and energy efficient label from Energy Commission.
118
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP13 Building Energy Efficiency Performance EP 13 Cr
Assess Building Energy Performance by Comparing the Baseline
and Proposed Figure, and Assess Carbon Emission from Energy 40 Points
Production Through Simulation.
Aims
The aim is to achieve significant levels of energy efficiency above the average building
energy performance by comparing the baseline and the proposed energy consumption
levels.
CALCULATOR CALCULATOR
EP-CAL01: ENERGY MODEL TEMPLATE EP-CAL02: ENERGY MODEL TEMPLATE - VERIFICATION
Requirements
Assess building energy performance by comparing the baseline and the proposed figure
and assess carbon emission from energy production through static or dynamic simulation.
119
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
The burning of fossil fuels is the single largest contributor to global climate change as well
as contributing to a host of toxic emissions that directly affect communities in the local
and global context. Rising energy prices also impose a significant economic imperative
that requires careful examination to understand how best to significantly reduce the
energy demand. A building cannot be considered green if it is not energy efficient. The
energy used by buildings is mostly generated by the burning of fossil fuels, which release
greenhouse gas emissions that contribute to climate change. No building should be
defined as “green” unless it consumes less energy and generates fewer greenhouse gas
emissions than average or conventional buildings.
All the characteristics, requirements, and parameters of the Baseline model are based
on basic characteristics derived from MS 1525. The characteristics of the baseline model
must follow the MyCREST requirements and are as outlined in the MyCREST BASELINE
MODELLING GUIDE in Appendix 2 at the end of this guide. Amongst these parameters
are:
1. Passive Design:
Baseline must achieve a minimum of: OTTV = 50 W /m2, RTTV = 25W /m2 (with
skylights and minimum U-values for roof) as stated in MS 1525.
The following characteristics are additional characteristics of the baseline model:
W indows
W WR = 50% and must be evenly distributed on ALL facades.
120
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
2. Active Design:
Equipment
The active design shall follow the minimum requirement for OTTV, RTTV, lighting,
and ACMV components and equipment under items 5, 6, 7, and 8 of MS 1525.
Details of the modelling guideline can be referred to in Appendix 2.
Baseline spaces by space Lighting Power Density (LPD) are as stated in EP4
Artificial Lighting.
ACMV Basis of Design must comply with ASHRAE 62.1 and ASHRAE 55.
For the proposed design, the naturally ventilated (NV) area s and strategies can be
included as an energy efficiency strategy to gain EP points by making a comparison
between the baseline (fully air-conditioned space) and the proposed design (naturally
ventilated space). The naturally ventilated spaces must be occupied spaces such as the
lobby, café, restaurant, atrium, and rest areas. Unoccupied spaces such as toilets,
storage, and corridors are not eligible for inclusion in the comparison. NV spaces must
not be more than 20% of the occupied areas and can only count towards the
achievement of a maximum of 2 points under MyCREST. Based on the space function, it
must fulfil the requirements listed in:
a. Criterion EP12 (non-AC energy scorecard in MyCREST Design scorecard) sub-
criteria EP12.3, EP12.4, EP12.5, EP12.6, EP12.8, EP12.9, and EP12.10; OR
b. Articles 4.6.2, 4.6.3, and 5.9 of MS 1525
Apart from that, renewable energy sources such as solar panels can also be used to
reduce energy and achieve savings above the baseline energy level as long as within
the project boundary and owned by the same owner. Savings are calculated based on
kW h and not costs.
Consultant engineers are required to run their heat load calculation based on two
models, the baseline and their design. Basically, MyCREST requires teams to adjust the
heat load calculations to comply with OTTV equal to 50 W /m² and RTTV equal to 25 W /m².
Once the required OTTV and RTTV are achieved, the consultant needs to input the
energy consumption in the Baseline Calculation.
For this sub-criterion, the baseline is according to the requirements of MS 1525. For active
design, process load energy consumption should be the same for both the baseline and
actual design.
Project teams can include NV areas in their savings calculation provided that they can
demonstrate that in a typical building of a similar function, occupancy, and type, this
space is normally or typically air conditioned. These are only areas with high occupancy
such as cafes and ground floor lobbies.
They must demonstrate that they have complied with all airflow and ventilation points
under “NON-AC building scorecard” including CFD simulation and verification to ensure
both adequate airflow and thermal comfort are achieved in the spaces (refer Figure 30).
121
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 30. Use of smaller WWR (window to wall ratio, shading devices) and specification of glass.
Carbon Calculator
All energy calculations for this sub-criterion All energy calculations for this sub-criterion
contribute to: contribute to:
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL02 Energy Model
Template Template - Verification
Submittals
Design Assessment:
1. Energy carbon calculation.
2. Energy Static Calculation/Dynamic Simulation report.
Construction Assessment:
1. Final energy performance verification report.
2. EM/BMS output or overall energy audit report.
122
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
123
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
124
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
INTRODUCTION
MyCREST offers an alternative version of the Design tool and system for what is defined
as “non-air-conditioned buildings”. Generally, in a tropical climate, there are selected
building functions and types which are predominantly naturally ventilated with the use
of mechanical fans. This provision in MyCREST allows projects teams to utilise a specific
scorecard which gains EP (Energy performance) points without demonstrating the EP
points through baseline and proposed design calculations.
MyCREST only allows the use of these exceptional scoring for EP points if the following are
demonstrated:
Essentially these are buildings where the majority of functional and occupied spaces are
naturally ventilated with mechanical assistance such as fans when needed.
2. The building has an estimated value or ratio of 50:50 of occupied areas representing
the ratio between air-conditioned areas and non-air-conditioned areas.
In MYCREST, a non-air-conditioned building is defined as when the air-conditioned
occupied areas represent 50 per cent of the gross occupied areas or less. The non-air-
conditioned areas are defined as “occupied areas” that are bounded by walls and
roof/ceiling but naturally ventilated.
To calculate this ratio, unoccupied areas consisting of toilets, storerooms, patios, and
verandas should not be included in this definition.
In summary, in MyCREST, a building can use the non-AC scoring systems for EP points if
“the building has equal to or less than 50 per cent of its occupied areas air-conditioned
and which utilises decentralised units such as split units and fan coil units to air condition
its AC spaces”.
125
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Should a building fulfil the above ratio requirement but its air-conditioned spaces are
served by a central chiller and these air-conditioned occupied areas are more than 20
per cent of its gross occupied area, then the air-conditioned scorecard and all its
requirements and prerequisites—including Static or Dynamic Simulation and energy
template submission—must still apply and be used to gain the EP points.
The non-air-conditioned areas can contribute to a maximum of two (2) points only and
essentially must comply with the requirements and link to the natural ventilation strategy,
as outlined in the non-air-conditioned scorecard EP16: Heat Gain Control and Comfort
through Natural Ventilation.
126
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP14 ENERGY EFFICIENCY – PERFORMANCE AND ASSESSMENT EP 14 Cr
Use Energy Efficient Equipment and Submit the Annual Predicted
Performance (BEI) of Energy Systems for a Non-Air-Conditioned 1 Point
Building
Aims
To assess and report the energy usage and energy performance of MyCREST-defined
“non-air-conditioned buildings”; AND
To achieve higher levels of building energy performance and reduce annual energy
consumption and environmental impacts associated with excessive energy usage
throughout the whole life of a building.
Requirements
1 POINT:
Use energy-efficient equipment for air-conditioned space areas (if any) in a non-air-
conditioned building with either a minimum of 3-Star Rating AND an EER of more than 11;
AND
Submit the annual predicted performance of energy systems based on conventional
schedules for a non-air-conditioned building.
Justification
The criterion outlines the minimum efficiency requirement of installed systems such as split
units or DX units. It also requires the predicted annual operating energy consumption of
a non-air-conditioned building. Reducing the use of non-renewable energy contributes
to the overall building environmental performance. In Malaysia, energy generation is
primarily through the use of electricity. A reduction of building energy consumption leads
to a direct reduction of CO2 emissions; hence, it is essential to minimise building energy
consumption in a holistic way.
127
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
128
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Each air conditioner has an energy efficiency rating that lists how many BTUs per hour are
used for each watt of power it draws.
For room air conditioners, this rating is the Energy Efficiency Ratio (EER). For central air
conditioners, this rating is the Seasonal Energy Efficiency Ratio (SEER).
These ratings are posted on an Energy Guide Label, which must be attached in a visible
place on all new air conditioners. Many AC manufacturers are voluntary participants in
the Energy Star labelling program. Energy Star-labelled appliances indicate high EER and
SEER ratings.
Carbon Calculator
All energy calculations for this sub- All energy calculations for this sub-
criterion contribute to: criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL02 Energy Model
Template Template - Verification
Submittals
Design Assessment:
1. A summary of the annual total building energy consumption and an input
parameter.
2. Major building layout, elevation drawings, features, building equipment , and
system information required for energy simulation.
3. BEI calculation.
129
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Final energy performance verification report.
130
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP15 Building Energy Efficiency Performance EP 15 Cr
Assess Building Energy Performance by Comparing the Baseline
and Proposed Figure, and Assess Carbon Emission from Energy 2 Points
Production Through Simulation
Aims
The aim is to achieve significant levels of energy efficiency above the average building
energy performance by comparing the baseline and the proposed energy consumption
levels.
CALCULATOR CALCULATOR
EP-CAL01: ENERGY MODEL TEMPLATE EP-CAL01: ENERGY MODEL TEMPLATE - VERIFICATION
Requirements
Assess building energy performance by comparing the baseline and the proposed figure
and assess carbon emission from energy production through static or dynamic simulation.
Justification
The burning of fossil fuels is the single largest contributor to global climate change as well
as contributing to a host of toxic emissions that directly affect communities in the local
and global context. Rising energy prices also impose a significant economic imperative
that requires careful examination to understand how best to significantly reduce the
energy demand. A building cannot be considered green if it is not energy efficient. The
energy used by buildings is mostly generated by the burning of fossil fuels, which release
greenhouse gas emissions that contribute to climate change. No building should be
defined as “green” unless it consumes less energy and generates fewer greenhouse gas
emissions than average or conventional buildings.
131
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
All energy calculations for this sub- All energy calculations for this sub-
criterion contribute to: criterion contribute to:
Calculator ID: EP-CAL01 Energy Model Calculator ID: EP-CAL02 Energy Model
Template Template - Verification
Submittals
Design Assessment:
1. Energy carbon calculation.
2. Energy Static Calculation/Dynamic Simulation report.
Construction Assessment:
1. Final energy performance verification report.
132
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.1 Ci
Aims
To increase the potential of wind-induced ventilation through the building form.
Requirements
2 POINTS:
1. If the layout design is a fragmented and polygonal form, provide a layout design
of the building that demonstrates an open layout and a more fragmented design
as compared to a conventional compact option.
2. If the layout design is “mono-shape” compact such as a circular or square-like
form or a rectangular form, then demonstrate that the design maximises its aspect
ratio values towards the prevailing wind conditions at the site with the intention of
“catching” the prevailing wind into the internal environment, while demonstrating
the provision of adequate solar control.
3. In a tight urban infill where a project has tight site constraints, the strategies of
maximising the openings towards prevailing winds and encouraging and
integrating the introduction of building features that divert wind speeds are
encouraged.
Justification
An open plan provides ventilation (outdoor air) that ensures safe, healthy, and
comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction and operation costs, and reduce the
energy consumption for air conditioning.
To assist cooling effects and increase cross ventilation for comfort cooling of occupants,
Givoni (1998: p. 388) confirms:
133
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. A narrative of the open plan nature of the proposed building layout plan.
2. A conceptual diagram showing the direction of wind flow in line with the
orientation and the potential of catching prevailing winds at the site.
3. A layout plan that demonstrates the principles above.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
134
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.2 Ci
Aims
W hen it is not possible to divert or catch the wind from all directions, then the minimum is
not to obstruct the prevailing wind. If it is not possible through form and opening design,
then specific features should be integrated into the design that can divert and take into
account the prevailing winds.
Requirements
2 POINTS:
Ensure the orientation of the building layout and major openings is according to the
prevailing regime of localised wind as indicated by the wind rose of a location by:
1. Providing an analysis of prevailing wind conditions at the building site either in the
form of:
a. W ind rose.
b. Frequency analysis tabulation.
c. Long-term measurement of local data or from the nearest meteorological
station.
Note: Approximate wind directions summarised in seasonal “wind rose” diagrams
must be obtained from what is available from the nearest Meteorological
Department. If data are taken at stations that are far from the building site, actual
values at a remote building site can differ dramatically.
135
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
Optimum orientation of a building layout and massing will improve the circulation of
natural ventilation (outdoor air) to achieve acceptable comfort conditions. When
carefully designed, natural ventilation can reduce building construction costs, operation
costs, and energy consumption.
This also pertains to high-rise residential buildings. Hence, the project must demonstrate
how its overall form and general disposition of service core, staircases and lifts, the
orientation of the building, glazing and shading systems including the use of fins to divert
wind, the use of recessed balconies, and the integration of multi-storey atria and
projections can result in wind-induced ventilation. The aim is to generate air movement
while maintaining adequate comfort, where the “bioclimatic” element is manipulated
to achieve higher energy savings yet ensure acceptable or better thermal comfort in the
tropics as illustrated in Figure 32.
Carbon Calculator
None
136
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. A summation or a concise description of weather data on the direction of
prevailing winds based on the above in terms of:
a. Range of magnitude.
b. Direction.
c. Average wind speed value averaged from the last 3–20 years of data of winds
on-site.
2. W ind rose data or frequency of winds tabulation.
3. Submission of a drawing which includes a superimposition of the layout/plan of
the proposed design on a wind rose diagram or visual of wind direction frequency
on-site to demonstrate the alignment of the orientation of the building on the main
cardinal points and the pattern of prevailing winds.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
137
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.3 Ci
Aims
Cross ventilation represents one of the most effective forms of ventilation from a thermal
comfort and occupants’ health viewpoint.
Requirements
2 POINTS:
Occupied Areas
The layout design should provide openings on opposite sides and attempt to limit any
individual room depth from the window wall to a maximum of 6 meters. Beyond 6 meters,
for typical rooms, cross ventilation may not be effective at average wind speeds.
However, this point can be achieved if the majority of the occupied NV spaces are not
more than 15 meters of maximum depth for spaces with opposite facing openings.
The design must prove that this is achieved for at least 70 per cent of the occupied areas.
However, within 6–15 meters, cross ventilation can still be effective provided that:
1. Openings are located at “opposite ends of the occupied space”.
2. The locations of openings do not result in short circuiting of natural airflow in the
room.
3. The openings are located to sufficiently ventilate at normal human height; this can
effectively result in airflow at the body height to achieve thermal comfort.
Justification
Design for cross ventilation provides ventilation (outdoor air) to ensu re safe, healthy, and
comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction costs, operation costs, and the energy
consumed for air conditioning.
138
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
principle is based on the requirement of ensuring a fresh and comfortable indoor climate.
This is done with minimal energy consumption and at low costs as depicted in Figure 33.
Carbon Calculator
None
Submittals
Design Assessment:
1. Building layout.
2. Building section.
3. Conceptual design of airflow ingress and egress.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
139
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.4 Ci
Aims
W indows must be operable by occupants to facilitate natural ventilation when needed.
Requirements
2 POINTS:
1. Provide operable windows in ALL occupied areas.
2. W indow openings should be operable by the occupants.
Justification
Operable windows provide ventilation (outdoor air) to ensure safe, healthy , and
comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction costs, operation costs, and the energy
consumed for air conditioning.
Carbon Calculator
None
Submittals
Design Assessment:
1. Building plan.
2. Detail window drawing with type.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
140
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP 16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.5 Ci
Aims
In addition to the primary consideration of airflow in and out of a building, airflow
between rooms in the building is important. W hen possible, interior doors should be
designed to be open to encourage whole-building ventilation. If privacy is required,
ventilation can be provided through high louvres or transoms.
Requirements
2 POINTS:
Allow for adequate internal airflow.
Justification
Adequate internal airflow improves the circulation of air to create safe, healthy, and
comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction costs, operation costs, and the energy
consumed for air conditioning.
Carbon Calculator
None
Submittals
Design Assessment:
1. Documentation verification.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
141
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.6 Ci
Aims
W here skylights are designed, these must be optimised based on solar heat gain control,
thermal comfort requirement, and ventilation aims.
Requirements
2 POINTS:
Design Clerestories or Vented Skylights
A clerestory will provide an opening for stale air to escape in a buoyancy ventilation
system. The light well of the skylight could also act as a solar escape to augment the flow.
Openings lower in the structure, such as basement windows, must be provided to
complete the ventilation system.
Justification
Clerestories or vented skylights are high level windows that help to exhaust hot air under
hot & humid conditions, reduce internal heat gain, and create thermal stratification in a
multi-volume space to ensure healthy and comfortable conditions for building
occupants. W hen carefully designed, such natural ventilation strategies can work
effectively under hot & humid conditions and reduce operational costs and energy
consumption.
142
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
sun
sun
view view
Carbon Calculator
None
Submittals
Design Assessment:
1. Conceptual diagram showing the predicted air movement by the stack effect
and the location of air outlets and inlets.
2. The highlighted area affected by stack effect on the layout plan.
3. Narrative on the predicted mechanism of the skylight vent during the day and at
night time.
4. Layout plan and sectional drawings.
5. Detail section of the vent.
143
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
144
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.7 Ci
Aims
To reduce heat gain through the roof.
Requirements
2 POINTS:
Provide roof ventilation passively or actively:
In buildings with attics or spaces at the underside of roofs, ventilating the attic space
greatly reduces the heat transfer to conditioned rooms below. Ventilated attics are
about 30°F cooler than unventilated attics.
Justification
Attic ventilation helps to reduce internal heat gain in ensuring safe, healthy, and
comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction costs, operation costs, and energy
consumption through air conditioning.
One of the reasons for ventilating roof spaces is that during the year under hot conditions,
heat and moisture accumulate in every attic. When left uncontrolled, the excessive heat
and moisture often result in significant damage to the roof, hence, structure-reducing its
normal life expectancy.
Carbon Calculator
None
Submittals
Design Assessment:
1. Documentation verification.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
146
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP 16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.8 Ci
Aims
To improve indoor air conditions.
Requirements
2 POINTS:
Provide fan-assisted cooling strategies:
Ceiling and whole-building fans can provide up to 9°F effective temperature drop at
one-tenth the electrical energy consumption of mechanical air conditioning systems.
Justification
Fan-assisted cooling strategies help to reduce internal heat gain in ensuring safe, healthy,
and comfortable conditions for building occupants. W hen carefully designed, natural
ventilation can reduce building construction costs, operation costs, and the energy
consumed through air conditioning.
Carbon Calculator
None
Submittals
Design Assessment:
1. Documentation verification.
Construction Assessment:
2. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
147
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
148
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING OPERATIONAL CARBON – ENERGY PERFORMANCE IMPACTS
POINT
EP16 Heat Gain Control and Comfort Through Natural Ventilation EP 16.9 Ci
Aims
To ensure the reduction of heat gain for comfort in a hot climate.
Requirements
2 POINTS:
Up to 50 per cent of eastern and western facing glazed openings are recessed, shaded
with deep overhangs (more than 1 m), or have self-shading mechanisms including
strategies such as projection of overhead balconies, cantilevers, and use of veranda and
patios.
Justification
Due to the fast pace of development, current designs have not adequately considered
the impact of deep recesses in buildings. Vernacular buildings in the tropics have
integrated verandas and patios. The insertion of deep recesses can obstruct peak solar
gain and impact during the day from the incidence of direct sunlight on exposed walls
and windows. Direct sunlight not only elevates solar gain through glazed openings but
also is absorbed by thermal mass such as a concrete wall,and reradiated back into
internal spaces during the night time. Hence, this basic passive strategy must be
considered as the incorporation of deep balconies such as veranda s and patios on any
eastern or western exposed walls and glazed openings of a building will reduce heat
gain both through conduction and radiation.
W alls, in particular masonry walls and glazed openings, are sources of heat gain due to
conductive and radioactive processes as thermal mass impacts of masonry act to
absorb the heat and the greenhouse impact of glass traps in the incoming solar
radiation. Traditional and vernacular architecture in this region highlights and
demonstrates the use of deep recesses, which are important strategies for achieving
both thermal comfort and the reduction of heat gain incident on masonry walls in times
when air conditioning was non-existent. Due to modernisation, many of these principles
have been neglected. Daily and annual heat gain and absorption will be effectively
reduced if these walls were protected from daily exposure to solar radiation.
Carbon Calculator
None
Submittals
Design Assessment:
1. Documentation verification.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
150
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Aims
To minimise energy usage while achieving an acceptable level of comfort, and to
enhance occupants’ satisfaction and well-being.
Requirements
Use an acceptable multi-zonal analysis tool to calculate the air change and predict
comfort in buildings. Through the use of commercially available and MyCREST-
recognised CFD (computational fluid dynamics) tool:
1 POINT:
Based on local wind data and distribution analysis, undertake analysis with CFD
simulation to show the distribution of natural ventilation through a selection of occupied
areas throughout an average day including the calculation of volume flow rate within
the spaces.
1 POINT:
Prove sufficient natural ventilation or show performance improvements by simulating the
effect of wind walls, towers, scoop, stacks, or massing of buildings.
Justification
Energy savings can be achieved through the utilisation of natural ventilation. However,
thermal comfort must be assured during periods of low air level. CFD analysis can show
the actual situation of natural ventilation throughout the year. This information is useful in
considering alternative designs with better passive systems or in considering mechanical
ventilation. CFD simulation is an important tool in predicting the performance of such
measurements.
The use of averaged wind data will be essential as the wind situation varies across
the day. Show the pressure variation and flow rate through the building's openings
throughout the day using averaged wind data. Provide a framework where
valuable information on wind, including velocity and surface pressure distributions,
can be analysed. It also provides a platform for the applications for rapid
151
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
To analyse interior conditions, CFD must also take into account the environment
around, within, and over building and urban forms surrounding the project.
Zone analysis can also be used to analyse infiltration and natural ventilation in
buildings. A zone airflow model is used to calculate the bulk air movement in and
through the building, driven by wind- and buoyancy-induced pressures.
2. Predict internal cross ventilation or stack effect in at least 50 per cent of the main
occupied areas of the building
One of the focuses of this point is to demonstrate the effectiveness of wind
penetration into internal spaces and rooms such as occupied rooms, corridors,
internal light wells, gaps between buildings, and courtyards. Another focus is to
assess the comfort implications of a series of “what if” options with respect to the
building form. As a result, a closed plan can be developed into a more open
design. It is, therefore, possible to investigate the wind penetration into elements
such as internal light wells, gaps between buildings, and courtyards. By assessing
the comfort implications of a series of “what if” options with respect to the building
form, a closed plan can be developed into a more open design, while at the same
time ensuring air movement and enlivening the internal environments.
The CFD modelling shall be carried out using validated software. The CFD solver shall
have the minimum capability of solving the Navier-Stokes fluid flow equations for three-
dimensional incompressible flows at steady state on a body-conforming computational
grid. Turbulence modelling shall also be included with the minimum requirement of using
the standard k-Ɛ turbulence model, coupled with standard wall function.
152
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
For external pressure simulation, the computational domain shall include the
development of interest, and the characteristics of the immediate surroundings and
buildings reside within the proximity of a minimum of 3 times or more of the length of the
longest distance measured across the boundary of the development. In the event that
the building and surrounding development are located on hilly terrain, topography
information shall be included in the simulation models. The computational domain shall
be further extended from the outer edge of the proximity regions to the boun dary such
that it would not result in non-physical airflow solution after the solution has converged.
The computational domain shall also be aligned along with the wind flow direction. The
domain height shall be extended, approximately 3 times the height of the tallest building
within the defined vicinity.
The computational grid generated for all simulations should resolve the salient flow
features in apartment units and around the development. As a guide, the dimension of
the computational element should be set at 0.1 to 0.2 m in an apartment unit, 0.5 to 1.0
m at all buildings and ground level, and 10 m at the far-field boundary with a minimum
of 50 m away from the ground.
Based on the local climatic wind condition, meteorological data on the prevailing wind
direction and velocity of the proposed site location for at least three prevailing wind
directions shall be used for the CFD simulation. Examples of the prevailing wind condition
such as the following mean speed and direction shall be taken from the table below. The
inbound vertical wind profile shall be assumed to be given by the logarithmic law with a
reference height of 10 m.
The CFD results must be compiled and tabulated, and included in a report which
highlights the following:
a. Geometrical model including
i. Isometric view of the model.
ii. Domain size used.
iii. Plan and 3D isometric model.
b. Simulation settings.
i. Boundary conditions.
ii. CFD software/models used/numerical scheme.
iii. Mesh/cell sizing.
iv. Solution control-convergence criteria.
c. Results and discussions.
i. Pressure and velocity vector salient findings.
ii. Average wind velocity within each selected unit, where applicable.
iii. Highlight areas with good natural ventilation.
d. Conclusion.
e. The following plots are to be placed in the appendices.
i. Simulation results for each direction.
ii. Static pressure (plan view-ground & mid-elevation, isometric views on
building facade).
153
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
iii. Velocity vector and contour, showing the plan view at ground & mid-
elevation of the building.
Carbon Calculator
None
Submittals
Design Assessment:
1. Prediction of external pressures around the building.
2. The CFD output and analysis report.
Construction Assessment:
1. Demonstrate compliance with the committed design specifications, making
reference to the as-built drawings.
154
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH Req1 Air Quality Performance OH Req1 S
Aims
To design and maintain good indoor air quality in an occupied space by establishing the
minimum indoor air quality (IAQ) performance. To enhance indoor air quality in buildings,
thus contributing to the comfort and well-being of occupants.
Requirements
REQUIRED:
Meet the minimum requirements of Section 4 through 7 of ASHRAE Standard 62.1,
Ventilation for Acceptable Indoor Air Quality or any applicable loca l code, whichever is
more stringent.
Justification
This prerequisite requires applicants to demonstrate that the delivered minimum zone
outdoor airflow for each zone and the outdoor air intake flow for each system meets or
exceeds the point required by ASHRAE.
Building mechanical and passive ventilation systems seek to ensure that adequate fresh
air is available for occupants in a space. Under-ventilated buildings may be stuffy,
odorous, uncomfortable, and/or unhealthy for occupants. The standard takes into
account the density of people within an area, the type of activity that is expected to
occur within the space, and the nature of the ventilation air delivery system.
For air-conditioned buildings, use either the Ventilation Rate Procedure (most common
and easier) or the Indoor Air Quality Procedure. In the Ventilation Rate Procedure
155
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
(Section 6.2), the breathing zone outdoor airflow is equal to the sum of the outdoor airflow
rate required per person multiplied by the zone population, plus the outdoor airflow rate
per unit area multiplied by the zone floor area.
For non-air-conditioned or naturally ventilated spaces (Section 5.1), the standard requires
that all naturally ventilated spaces be permanently open to and within 7.6 meters of
operable wall or roof openings and that the operable area be a t least 4% of the net
occupied floor area.
Carbon Calculator
None
Submittals
Design Assessment:
Narrative describing the project’s ventilation design, including specifics about fresh air
intake volumes and special considerations that affect the project’s ventilation design.
Construction Assessment:
1. As-built drawings to illustrate the project’s ventilation system design.
2. Narrative describing the project’s ventilation design, including specifics about
fresh air intake volumes and special considerations that affect the project ’s
ventilation design.
156
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH1 Indoor Smoking Restriction OH 1 S
Aims
To enforce a smoking restriction at premises in line with the Control of Tobacco Product
(Amendment) Regulations 2004 & 2008.
Requirements
1 POINT:
Ensure compliance with regulations through restriction on smoking in buildings/ premises.
Location of non-smoking signs must be visible in signage location plans.
Provide a designated area for smokers outside the building, 10 m away from the main
entrance.
Justification
The indoor smoking restriction credit is aimed at limiting the exposure of building
occupants to environmental tobacco smoke. The smoke is a result of the burning of
cigarettes, pipes, or cigars, which contain thousands of compounds, many of which are
known as carcinogens. It is essential to maintain a healthy living workspace through the
protection of indoor environments from contaminants. The expected results of the credit
are increased occupants’ comfort, higher productivity rates, lower absenteeism, and
fewer illnesses.
Carbon Calculator
None
Submittals
Design Assessment:
1. Floor plans displaying signage on smoking-restricted areas.
Construction Assessment:
1. As-built drawing of the no smoking signage location.
2. Photographic evidence.
157
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
158
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
Control and Strategies to Reduce Mould Occurrence (for Air-
OH2 OH 2 S
Conditioned Buildings)
Aims
To prevent mould in building areas and lodges in order to ensure building users’ health
and harmony.
Requirements
1 POINT:
Comply with any local/international indoor mould prevention guideline such as:
1. Mechanical or natural air ventilation system should maintain sufficient air
movements in ventilated spaces in order to prevent air stagnation.
2. W alls subjected to natural ventilation must be maintained at a temperature higher
than the dew point at the space conditions without any use of active control (e.g.
electric heater).
3. Avoidance of cold air diffuser being near or directed to wall surfaces etc.
Justification
Mould has the potential to cause health problems. It produces allergens (substances that
can cause allergic reactions), irritants, and in some cases, potentially toxic substances.
Inhaling or touching mould or mould spores may cause allergic reactions in sensitive
individuals. Hence, mould prevention is important in ensuring the health of building
occupants.
It is important to prevent any wet or damp areas on building surfaces or on related items
in order to prevent mould growth.
Humidity around all room areas and any air vents must be controlled and kept below
saturation levels during construction and building occupancy.
All windows must be left open continuously during post-construction and before
occupancy to allow sufficient time for moisture levels in the building materials to
decrease to below the danger level.
159
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Other measurements:
1. Proper insulation of air conditioning ducting system.
2. Prevention of leakage of rainwater through roof and walls.
3. Prevention of infiltration of humid air into air-conditioned spaces.
4. Improved ventilation in buildings (for mechanically ventilated buildings).
5. Avoidance of air-conditioned air supply diffuser from being very close to wall
surfaces.
6. Prevention of water leakage into the basement level.
7. Prevention of pipe leakage or broken pipes.
8. Complete control of indoor moisture sources and avoiding the creation of
humidity.
Carbon Calculator
None
Submittals
Design Assessment:
1. Basic report outlining the strategies that will be implemented to fulfil the
requirements for mould prevention by highlighting the measurements taken to
satisfy the requirements of this point.
Construction Assessment:
2. Provide a report on the reading of RH and temperature logging.
160
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH3 Indoor Air Quality Pollutants OH 3 S
Aims
To reduce the quantity of indoor air contaminants that are odorous, irritating, and harmful
to human health.
Requirements
3.1 Low-VOC Materials – for Paints and Coatings
1 POINT:
Low-VOC materials for paints and coatings.
Justification
Volatile organic compounds (VOCs) are emitted as gases from certain solids or liquids.
VOCs include a variety of chemicals, some of which may have short- and long-term
adverse health effects like eye, nose, and throat irritations; headaches; loss of
coordination; nausea; and damages to the liver, kidneys, and the central nervous system.
Specifying low-VOC materials helps to reduce indoor air pollution at the source, which is
one of the effective indoor air pollution control strategies.
1. Use only zero-/low-VOC paints. All paints used in the interior of the building must be
certified as containing zero VOC or less than the limits specified in Table 4 below.
161
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
2. Ensure all the sealants and adhesives used are water-based rather than solvent-based
or have a low solvent content. Most construction adhesives offer adequate bond
strengths in water-based varieties. Acrylics, silicones, and siliconised acrylics are the
safest sealants to use in the interiors and have the lowest solvent content. W hile
solvent-based products such as urethanes and butyls should preferably not be used
indoors as sealants, their use for the exteriors does not pose any concern.
3. Adhesives usually have a high-VOC emission potential. Hence, use adhesives with low-
VOC or zero-VOC emissions such as acrylics or phenolic resins (phenol-formaldehyde)
indoors.
Carbon Calculator
None
Submittals
Design Assessment:
1. Extract of the tender specification showing the requirement to use adhesive with
low-VOC materials.
2. Cut sheets, specification sheets, and commercial brochures of the low-VOC
emission finishes or products used.
3. A certificate from the manufacturer for each of the categories, as applicable to
the applicant, stating clearly that the materials used have zero VOCs or low VOCs
(g/litre), as specified under limits.
Construction Assessment:
1. Purchase orders/delivery orders of low-VOC paints and coatings, and/or
adhesives and sealants to demonstrate compliance with the committed design
specifications.
2. As-built drawing plan showing the location of installed materials.
3. Cut sheets, specification sheets, and commercial brochures of the low-VOC
emission finishes or products installed.
4. Photographic evidence.
162
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
163
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH4 Indoor Noise Level (for Air-Conditioned Buildings) OH 4 S
Aims
Ensure the monitoring and control of noise at levels which are effective in ensuring the
comfort of building users.
Requirements
1 POINT:
The maximum noise allowed in occupied spaces is not more than 45 dB.
Justification
Noise is one of the major causes of low productivity and health concerns among office
workers. Noise causes physiological and psychological problems among office workers.
Investigations of the literature show that noise lowers productivity and increases stress,
absenteeism, hypertension, and even causes permanent loss of hearing, resulting in
financial losses due to work-related compensation.
Carbon Calculator
None
Submittals
Design Assessment:
1. A design report on strategies for ensuring the internal noise level is maintained at
the prescribed levels.
2. Floor plans showing the location of core, M&E, and equipment rooms.
164
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. A report describing the measured internal and external noise sources and the
features installed to achieve the required noise level.
2. As-built drawings showing the noise control features.
3. Manufacturer’s data sheets of the acoustic materials used in buildings.
165
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH5 Carbon Dioxide Level Control (for Air-Conditioned Buildings) OH 5 Ci
Aims
Ensure the monitoring and control of carbon dioxide (CO₂) at levels which are effective
in ensuring comfort and harmony for building users and plant rooms.
Requirements
1 POINT:
Install a monitoring system and control the CO₂ level in AHU rooms with at least 1 CO₂
sensor at the main return air duct at each level to ensure that the CO₂ levels are
maintained at ≤ 1000 ppm.
Justification
Install a permanent monitoring system that provides feedback on ventilation system
performance in order to ensure that the systems are maintaining the design ’s minimum
ventilation requirements. Configure all monitoring equipment to generate an alarm when
the conditions vary by 10% or more from the set point, via either a building automation
system alarm to the building operator or a visual or audible alert to building occupants.
Potential Issues
CO₂ control and monitoring systems are installed but do not fully function according to
the need of the original design, especially during building operations. Such a situation is
possible in the absence of comprehensive maintenance.
It is recommended to use CO2 sensors that require recalibration no less than every 5 years.
166
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Confirmation of the type of ventilation system and installed controls.
2. Narrative describing the project’s ventilation design and CO 2 monitoring system.
Include specific information on the location and quantity of installed monitors,
operational parameters, and set points.
3. Provide design drawings displaying a schematic illustration of the monitoring
systems and CO₂ controls.
Construction Assessment:
1. As-built drawing displaying a schematic illustration of the monitoring systems and
CO₂ controls.
2. Photographic evidence.
167
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
OH6 Appointment of Safety, Health, and Environment Officer OH 6 S
Aims
To encourage the establishment of environmental quality and hygiene management
strategy and to implement the strategy effectively during the construction stage.
Requirements
4 POINTS:
Appoint a Safety and Health Officer to:
Provide personnel to manage Safety, Health, and Environment whose tasks can be
applied as follows:
1. To develop a Construction Site Air, Noise, and W ater Pollution, and Dust Control
Management Plan; AND
2. To develop a Safety and Health Management Plan; AND
3. To monitor and conduct regular inspection on the effectiveness of air pollution,
noise, and dust control measures; AND
4. To monitor and conduct regular inspection of the effectiveness of water pollution
control measures; AND
5. To monitor and conduct regular inspection of site conditions to identify health and
hygiene problem areas; AND
6. To provide training and information on air and water pollution control and health
and hygiene issues to construction site workers.
Justification
Air, Noise, and W ater Quality
Reduce air, noise, and water quality problems that result from the construction process
in order to help sustain the comfort and well-being of construction workers and
surrounding society.
Hygiene
Many construction sites are notorious for dirty toilets. This criterion aims to encourage the
contractor to provide a better and more hygienic environment for site workers.
168
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Hygiene
1. The contractor is to formulate a hygiene management plan for the construction
site. The management strategies can be in the form of education, instructions, or
guidelines for site staff and both long- and short-term workers. In addition, the
management plan shall include the identification of hygiene problems and their
possible locations, methods to maintain the hygiene performance, and an
emergency action plan.
2. The contractor is to designate a member of site staff to inspect the construction
site regularly and to identify health and hygiene problem areas. A minimum
inspection frequency of once a week is expected; for instance, stagnant water
offers a breeding ground for mosquitoes, which may bite site workers and cause
the transmission of diseases. This aims to eliminate health risks, such as mosquito
growth within the construction/demolition site. A designated person is required to
inform the project site staff of the requirement of health risk remedial works, such
as stagnant water removal.
3. To maintain and improve health and hygiene knowledge and technique among
site staff through education and training provided by the contractors. Good
health and a hygienic environment are best achieved by staff’s good habits and
practice.
4. A large quantity of cleaning products is consumed during construction works.
Some of the cleaning products are toxic and non-biodegradable, which will
cause adverse impacts on the environment. This criterion is assigned to encourage
the use of environmentally friendly cleaning materials and products.
169
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 36. Poor air quality due to the absence of dust control measures.
Carbon Calculator
None
Submittals
Design Assessment:
1. A declaration letter/tender specification/bill of quantity to show the commitment
to implement the strategies.
Construction Assessment:
1. Air, noise, and water pollution management strategy.
2. Strategy implementation records including an air and water quality testing report.
170
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC Req1 Recycling Facility EC Req1 Ci
Aims
To assist in waste reduction arising from occupancy and to divert a majority of waste from
landfills into a recycling facility.
Requirements
REQUIRED:
During the Construction Period:
Implement accessible specified area(s) for the collection and storage of recycled
wastes. Materials include steel, wood, paper, and plastic.
The following are the requirements for providing solid waste management facilities:
1. Total number of building occupants (including staff and customers).
2. Total wet/dry waste (in kg) produced per day by the building occupants.
3. A building plan to indicate the locations proposed for 3 bins and Disposal Rooms.
Justification
Building construction produces a lot of waste, which needs to be managed properly.
Through proper waste management, waste can be diverted from entering landfills.
Therefore, the construction site and building need to be equipped with a proper
collection and storage apparatus.
Identify valid local waste contractors for glass, plastic, metal, office paper, newspaper,
and cardboard. Educate occupants on recycling measures.
The building owner (through the Facilities Manager) needs to provide the total number
of building occupants, which include the staff and customers of the building. Malaysians
produce approximately 0.45 to 1.44 kg/day of solid waste per capita, with a ratio of 70%
of wet waste and 30% of dry waste.
171
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
W aste production should be divided into two measurements, namely wet waste and dry
waste. The following tables show the calculations to obtain the total waste production in
kg (max population × waste production × wet (or dry) waste ratio) (refer Table 5.1 and
5.2).
The Facility Manager needs to allocate the location of the facilities on the building plan.
Three bins should be located at a strategic place to ease the segregation of wastes.
Disposal Rooms are important to store the cleaning apparatus and enhance the
segregation of wastes (refer Figure 37 and 38).
172
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. A building plan, displaying the location and size of the recycling collection area
for building occupants.
Construction Assessment:
1. A building plan, displaying the location and size of the recycling collection area
during construction.
2. As-built drawing plan showing the location and size of the recycling collection
area for building occupants.
3. Photographic evidence during construction and for the building occupants.
173
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC1 Life Cycle Analysis EC 1 Ci
Provide the Calculation of Embodied Carbon for at Least 3
Construction Components of Assembly Materials from Gate to Site 1 Point
(Excluding All Structural Elements Listed in EC7)
Aims
To encourage the assessment of embodied energy or carbon and the compilation of
data in terms of environmental emissions associated with the gate to site life cycle of
major building materials.
Requirements
1 POINT:
Verify the relevant carbon emission released during the transportation of materials and
the environmental emission associated with the gate to site life cycle by:
*Assembly materials consist of all parts of each building element. For example, ceiling
finishes are composed of parts such as boards and tee joints. The total value of embodied
carbon calculated for ceiling finishes is inclusive of every single one of these parts.
Justification
The evaluation of embodied carbon levels can encourage the specification of more
environmentally friendly production of materials. The goal of the Life Cycle Analysis (LCA)
sub-criterion is to take the first step in an iterative process for the development of a tool
that allows for more holistic approaches and considerations for the major assemblies and
structural materials in buildings. It is the start of a publicly available resource that uses a
life cycle approach to measure the impacts of building assemblies.
W ith further research and data, new strategies will emerge for better target reductions in
the major environmental impact categories.
174
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
Submittals
Design Assessment:
1. A declaration letter/tender specification/bill of quantity to show the commitment
to implement the strategies.
Construction Assessment:
1. Value of tCO2e from gate to site of at least 3 assembly materials.
2. Product brochure including manufacturer details.
175
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC2 Green Products EC 2 Ci
Aims
To encourage the use of green products in the construction industry.
Requirements
1 POINT:
Target JKR/SIRIM Standard, Green Products Scoring System (GPSS) of 40% to 49%.
2 POINT:
Target JKR/SIRIM Standard, Green Products Scoring System (GPSS) of 50% to 59%.
*Products that are able to score higher than 59% can claim a maximum of 2 points under
Innovation.
Justification
The application of the JKR/SIRIM Standard 1, “Manual for Green Product Scoring System
(GPSS)” is to encourage the project team to specify the green products to be used in
their projects. It is also to educate and create awareness among the stakeholders on
environmentally friendly products and services and to encourage manufacturers to
apply for green certification for their products.
The GPSS calculation for buildings considers only the superstructure elements and M&E
systems. Substructure components for the building and all temporary works shall be
removed from the GPSS calculation. The GPSS calculation for road excludes electrical
works, mechanical works, and road furniture.
176
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The scoring calculation method is based on a point scale as specified in the GPSS
manual:
SCORE DESCRIPTION
The product used is not considered green or do not have any form of
0
certification
Product is self-declared green by the manufacturer with certification
from an independent body, e.g. compliance with ISO 14000
OR
1
*Type II: Self-declarations or claims made by manufacturer:
Any certificate or accreditation from any green/eco-friendly
organisation from all over the world
*Type I: Based on multiple criteria and life cycle considerations, e.g.
product or materials that have an eco-label
2
OR
Certificate from any members of Global Eco-Label Network (GEN)
Carbon Calculator
None
Submittals
Design Assessment:
1. Product certification and brochure.
2. Specification of the products used.
3. Calculation of the JKR/SIRIM Green Product Scoring System prepared by the
consultant.
Construction Assessment:
1. Product certification and brochure.
2. Specification of the products used.
3. Pictures of the installed materials.
4. Verification of using green products based on the calculated JKR/SIRIM Green
Product Scoring System.
177
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC3 Sustainable Sourcing of Materials and Products EC 3.1 Ci
Aims
To encourage the practice of timber selection from environmentally responsible forest
management.
Requirements
1 POINT:
Ensure ≥ 50% (based on cost) of wood-based materials and products used (structural
framing and general dimensional framing, flooring, sub-flooring, wood doors, and
finishes) are certified by the Forest Stewardship Council (FSC) or the Malaysian Timber
Certification Council (MTCC).
Justification
Deforestation is considered as one of the contributing factors to global climate change.
The negative environmental impacts of irresponsible forest practices can include forest
destruction, wildlife habitat loss, soil erosion and stream sedimentation, water and air
pollution, and waste generation.
The FSC and MTCC ensure that the wood used for a project comes from environmentally
responsible forest management. It incorporates many criteria that contribute to the long-
term health and integrity of the forest ecosystem including sustainable timber harvesting,
preserving wildlife habitat and biodiversity, maintaining soil and water quality , and
conserving endangered and old growth forest.
Carbon Calculator
None
Submittals
Design Assessment:
1. Record of all wood-based materials identified for the project; verify which
materials are FSC and MTCC certified.
2. Calculation of the percentage of certified wood used.
178
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. List all new wood products used in the project and identify which components are
FSC and MTCC certified.
2. The volume of each wood product must be shown.
3. The vendor’s chain-of-custody (COC) number must be shown in the invoice to
verify FSC and MTCC certifications.
4. Calculation of the percentage of certified wood used.
179
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC3 Sustainable Sourcing of Materials and Products EC 3.2 Ci
Aims
The need to increase the recycled content in building materials is a viable and practical
strategy for all building owners in pursuit of green building certification. The use of
recycled content is able to result in a lowered embodied carbon rate in any given
building material, apart from reducing waste production levels arising from
manufacturing activities.
Requirements
The project is required to utilise recycled content materials so that the total of post-
consumer recycled content plus half of the pre-consumer content constitutes at least
10% or 15%, based on the material cost, of the total value of the materials in the project.
The recycled content within a building material is determined by its weight. The recycled
content portion in the building material is then multiplied by the cost of assembly to
determine the recycled content value. Other costs such as mechanical and electrical
costs, plumbing costs and so forth are not included in the calculation. Only permanently
installed materials are considered.
Justification
Encouraging the use of recycled content in building materials is a strategy to reduce the
impacts of processing and harvesting virgin sources. This contributes to the reduction of
carbon emission from traditional material processing, thus decreasing the embodied
carbon of a building material.
Carbon Calculator
None
Submittals
180
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Design Assessment:
1. Calculation of the total percentage (based on cost) of materials with recycled
content against the actual total value of the materials for the project.
2. The percentage of post-consumer and/or pre-consumer recycled content must
be established based on cost. The calculation of the recycled content value of
each material must be provided.
3. Product brochure of each installed recycled content material showing the
percentage of post- and pre-consumer recycled content.
4. Green label certification (if any).
Construction Assessment:
1. Photographic evidence of the installed materials.
2. Calculation of the total percentage (based on cost) of materials with recycled
content against the actual total value of the materials for the project.
3. The percentage of post-consumer and/or pre-consumer recycled content must
be established based on cost. The calculation of the recycled content value of
each material must be provided.
4. Product brochure of each installed recycled content material showing the
percentage of post- and pre-consumer recycled content.
5. Green label certification (if any).
181
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC4 Industrialised Building System (IBS) EC 4 Ci
Aims
To reduce the wastage of construction materials and to reduce the wastage going to
landfills. It is possible to reduce materials’ carbon emission with the reduction of wastage
without compromising building quality.
Requirements
2 POINTS:
Calculated IBS Score ≥ 50 points
3 POINTS:
Calculated IBS Score ≥ 70 points
Justification
Industrialised Building System (IBS) is known to be part of efficient construction methods
where the materials used are precast or manufactured off-site. Apart from improving
construction productivity and quality, IBS also reduces construction waste on-site and at
the same time reduce the transportation waste sent to landfills.
Target which elements are to be used for IBS in the design stage. The six (6) commonly
used components in Malaysia are:
1. Pre-cast Concrete Framing, Panel, & Box System.
2. Steel Framing Systems.
3. Prefabricated Timber Framing Systems.
4. Steel Formwork Systems.
5. Block W ork Systems.
Carbon Calculator
None
Submittals
Design Assessment:
1. IBS Score Calculation, prepared by the consultant using the CIDB standard form.
182
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Verification of the actual achievement of the calculated IBS Score.
2. Photographic evidence showing the installed materials.
183
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC5 Quality Assessment System in Construction (QLASSIC) EC 5 Ci
Aims
To ensure the quality output of construction work for a given project.
Requirements
3 Points: QLASSIC score of ≥ 70%.
4 Points: QLASSIC score of ≥ 80%.
5 Points: QLASSIC score of ≥ 90%.
Justification
The adaptation of the Quality Assessment System in Construction (QLASSIC) ensures the
quality of the building workmanship is up to standard.
Carbon Calculator
None
Submittals
Design Assessment:
1. A declaration letter/tender specification/bill of quantity to show the commitment
to implement the strategies.
Construction Assessment:
1. QLASSIC certification.
184
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC6 Life Cycle Analysis EC 6 Ci
Provide the Calculation of Embodied Carbon for the Construction
Components of Assembly Materials from Cradle to Gate 5 Points
(Maximum of 5 Materials)
Aims
To verify the installation and data documentation of the relevant energy and materials
consumed, and environmental emissions associated with the cradle to gate life cycle of
selected building materials.
Requirements
To verify the relevant carbon emission released during the harvesting, extraction, and
manufacturing of materials, and environmental emissions associated with the cradle to
gate life cycle of the selected building materials by:
Example: The total value of embodied carbon for ceiling finishes includes boards and tee
joints.
185
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
The evaluation of embodied carbon can define more environmentally friendly
production of materials. The goal of the life cycle analysis (LCA) sub-criterion is to take
the first step in an iterative process for the development of a tool that allows for more
holistic approaches and consideration for the major assemblies and structural materials
in buildings. It is the start of a publicly available resource that uses a life cycle approach
to measure the impacts of building assemblies.
W ith further research and data, new strategies will emerge to better target reductions in
the major environmental impact categories.
Carbon Calculator
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. Value of tCO2 e of 1 assembly.
2. Manufacturer’s details/ letter/ declaration on the value of tCO2e.
1. UNEP-SETAC Life Cycle Initiative. (2009). Guidelines for social life cycle assessment
of products. Social and socio-economic LCA guidelines complementing
environmental LCA and Life Cycle Costing, contributing to the full assessment of
goods and services within the context of sustainable development. Paris: UNEP.
2. British Standards Institution Malaysia. (2011). Specification for the assessment of the
life cycle greenhouse gas emissions of goods and services (PAS 2050:2011).
Retrieved on 25 April 2013.
3. International Organization for Standardization. (2006). Environmental
management – Life cycle assessment – Principles and framework (ISO 14040:2006).
186
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC7 Life Cycle Analysis (LCA) – Building Works* EC 7 Cr
Aims
To encourage the construction team in the selection of low carbon emission building
materials.
CALCULATOR** CALCULATOR**
EC-CAL01: LIFE CYCLE ANALYSIS (LCA) – EC-CAL02: LIFE CYCLE ANALYSIS (LCA) -
BUILDING WORKS BUILDING WORKS VERIFICATION
Requirements
Verify the environmental emissions associated with the cradle to gate life cycle of
building material are below the stated baseline:
2 POINTS:
Reduction of carbon emission to 5% below the baseline level.
3 POINTS:
Reduction of carbon emission to 10 % below the baseline level.
4 POINTS:
Reduction of carbon emission to 15% below the baseline level.
5 POINTS:
Reduction of carbon emission to 20% below the baseline level.
6 POINTS:
Reduction of carbon emission to 25% below the baseline level.
* There are eight (8) elements are listed in the 1 st version of the LCA calculator. The
MyCREST calculator will be updated from time to time. Project teams have the option
and opportunity to include any other element or assembly (other than the 8 listed in the
calculator) into their embodied energy calculation should the values be known.
However, in this case, baseline values must be justified from “other similar conventional
counterpart materials”. This justification must be included and submitted with the
justification in the LCA baseline calculation for that specific element. This justification must
be founded upon the basis that the baseline materials and elements constitute or
represent conventional elements and assemblies in a typical reinforced concrete
structure or building in Malaysia. Points will be awarded:
1. Through the use of MyCREST Calculator, OR/AND
2. Based on verification using commercially known LCA software for analysis such as
Simapro and Gabi.
In the case of (1), the baseline is 0.4. (Please refer Appendix 1 No. 3).
In the case of (2), the baseline must be justified by the project team based on standard
and “conventional” construction.
187
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
**The current MyCREST calculator deals with basic structural elements only.
Justification
Replacing part of energy-intensive materials with less energy-intensive materials and/or
by utilising regionally available materials will demonstrate a commitment to lowering
carbon in the structural application of building materials such as roofing/flooring,
columns, and load-bearing walls for structural applications. Use such technologies to
demonstrate a minimum reduction in the overall embodied energy when compared to
equivalent products for the same application for the structural system used in a building,
thus meeting the equivalent strength requirements. Strategies can include specified fly-
ash in concrete mix and using low embodied carbon materials to reduce the release of
carbon emissions to the environment.
Use recycled content materials which are known to release less carbon emission rather
than using new raw materials.
Request carbon emission data from several manufacturers to compare which material
has a lower emission impact.
Carbon Calculator
Submittals
Design Assessment:
1. Calculation of the reduction of tCO2e.
2. List and description of the types of materials included in the calculation.
188
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Photographic evidence of the installed materials.
2. Delivery order of the installed materials.
3. Manufacturer details/letter/declaration on the value of tCO2e (if using another
value than ICE).
189
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
190
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC8 Solid Waste Management – Route and Recyclers EC 8 Ci
Aims
To navigate the management of solid waste through a policy and waste management
route.
Requirements
1 POINT:
Establish the Waste Management Route and provide recycler details.
Justification
The Solid W aste Management Route is important to the facilities management team as
it will provide information on how solid waste will be managed according to the W aste
Management Hierarchy and Solid Waste Management Policy.
Carbon Calculator
None
Submittals
Design Assessment:
1. A design brief describing a specific Solid Waste Management Route according to
the type of building being assessed.
2. A design brief describing a Solid Waste Management System (if any) designed for
the building (e.g. chute system).
Construction Assessment:
1. As-built drawing plan of the overall building plan, showing the location of waste
area/recycled bin and general bin.
191
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
192
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Building Waste
Reduce Awareness Reducing
programme amount of
waste
Dry
Waste Reuse Re-usage
containers
Other
Waste Dispose Waste bins Landfill
193
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC9 Salvaged and Reused Materials EC 9 Ci
Aims
To reuse building materials in order to reduce the demand for virgin materials, and to
reduce waste, thus lessening the impacts associated with the extraction and processing
of virgin resources.
Requirements
1 POINT:
Salvage or reuse construction materials for 2% of building materia ls based on the total
material cost (extracted from the bill of quantities).
Justification
Reusing materials found on-site or off-site divert the materials from the construction waste
stream, reduce the need for landfill space, and reduce the environmental impact of
associated water and air contamination. It also helps to reduce the production of new
materials.
Project teams shall include materials only permanently installed in the project.
Mechanical, electrical, and plumbing assemblies are excluded from the calculation.
Carbon Calculator
None
Submittals
Design Assessment:
1. A list of proposed salvaged materials.
2. A calculation of the value of reused materials against the estimated total value of
the materials for the project.
Construction Assessment:
1. Photographic evidence showing the utilisation of reused materials.
2. A final calculation of the value of reused materials against the estimated total
value of the materials for the project.
194
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
195
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING THE EMBODIED CARBON
POINT
EC10 Construction Waste Management EC 10 Cr
Produce and Execute a Construction Waste Management Plan
W hich Recycles or Salvages 50% of Non-Hazardous Construction 2 Points
Debris and Avoids Disposal to Landfills
Aims
To minimise the disposal of construction waste materials to the landfills.
CALCULATOR
Requirements
1 POINT: WM-CAL01: CONSTRUCTION WASTE
Prepare a Construction W aste Management Plan. MANAGEMENT
1 POINT:
Recycle and/or salvage 50% of the volume of non-hazardous construction debris.
Justification
Building construction produces high volumes of waste, which needs to be managed
properly. Through proper waste management, waste can be diverted from entering the
landfills. The aim of this sub-criterion is to recycle either 50% or 70% of non-hazardous
construction waste.
Figure 40.1. Concrete and steel bars from demolition works are to be segregated for recycling.
196
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 40.2. Concrete and steel bars from demolition works are to be segregated for recycling
Carbon Calculator
Submittals
Design Assessment:
1. Construction W aste Management Plan.
Construction Assessment:
1. Documentation of possible recycled/salvaged construction waste and the
quantity (based on weight).
2. Receipt of recycling activities verified by the contractor.
3. A calculation of recycled construction waste over the overall construction waste
on-site.
197
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
LOWERING EMBODIED CARBON
POINT
EC11 Construction Materials Transportation EC 11 Cr
Aims
To reduce the transportation of materials to the site. To encourage the sourcing of local
construction materials and products for the project as well as the selection of low carbon
emission building materials. To reduce the transportation corridors on-site, thus reducing
carbon emissions in the transportation of materials to the site throughout the construction
stage.
CALCULATOR
EC-CAL03: CONSTRUCTION
MATERIALS TRANSPORTATION
Requirements
To verify the carbon emission released during the transportation of materials from factory
to site:
3 POINTS:
Reduction of carbon emission to 20% below the baseline.
4 POINTS:
Reduction of carbon emission to 30% below the baseline.
5 POINTS:
Reduction of carbon emission to 40% below the baseline.
Justification
Transportation is one of the main carbon emission sources. Selecting materials that are
locally made and near to the site can reduce the carbon emission caused by
transportation.
198
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The aim to use local construction materials must be considered at the design stage, and
the use of local materials must be reflected in the tender stage. The list of local materials
can be referred at but not limited to:
a. MITI (List of local manufacturers).
b. Treasury listing under SIRIM QAS http://www.malaysiancertified.com.my
c. List of local construction materials by IKRAM QA.
Carbon Calculator
Construction Assessment
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. Calculation of the carbon emission released for material transport.
2. Manufacturer details (address).
199
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
WATER EFFICIENCY FACTORS
POINT
WE Req1 Reduce Potable Water – 10% reduction WE Req1 Cr
Aims
To design efficient water and plumbing strategies and to reduce the water consumption
of building occupants.
CALCULATOR CALCULATOR
WE-CAL01: WATER CONSERVATION WE-CAL02: WATER CONSERVATION
STRATEGIES STRATEGIES - VERIFICATION
Requirements
Required:
Reduce potable water usage by 10%.
Justification
To encourage and promote efficient usage of water by using a better type of water
fittings system and flow rates.
Baseline
W ater fittings efficiency is measured based on the water flow rate. From the baseline
levels given below, the team must calculate the reduction of their proposed water fittings
from the baseline. The baseline for the calculation of water efficiency is shown below:
200
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The baseline is generated based on the minimum flow rate/water consumption for 1 Star
rating in the Guideline for Voluntary Water Efficient Products Labelling Scheme, April 2013,
Suruhanjaya Perkhidmatan Air Negara (SPAN).
The carbon emission factor for processed water is derived from CIS 20:2012, Green
Performance Assessment System in Construction (Green PASS), Item 3.4, Construction
Industry Development Board Malaysia (CIDB).
Proposed Design
The estimated water consumption is based on the proposed fitting and flow rate. The
requirement for this criterion is that the calculation must show the efficiency of the
building in terms type of fittings, flow rates, and building occupancy by 10%.
Carbon Calculator
Submittals
Design Assessment:
1. W ater fittings specification with the flow rate.
2. W ater fittings efficiency calculation.
Construction Assessment:
1. Photographic evidence of the installed water fittings.
2. Specification of installed water fittings with the flow rate.
3. Final calculation of water fittings efficiency.
201
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
202
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
WATER EFFICIENCY FACTORS
POINT
WE1 Water Conservation Strategies WE 1 Cr
Aims
To use water efficiently.
CALCULATOR CALCULATOR
WE-CAL01: WATER CONSERVATION WE-CAL01: WATER CONSERVATION
STRATEGIES STRATEGIES - VERIFICATION
Requirements
1 POINT:
10% carbon emission reduction compared to W EPLS standard by SPAN.
2 POINTS:
30% carbon emission reduction compared to W EPLS standard by SPAN.
3 POINTS:
50% carbon emission reduction compared to W EPLS standard by SPAN.
Justification
To encourage and promote efficient usage of water by using a better type of water
fittings system and flow rates.
Baseline Building
The baseline is generated based on the minimum flow rate/water consumption for 1 Star
rating in the Guidelines for Voluntary W ater Efficient Products Labelling Scheme (W EPLS)
by SPAN. The building occupancy must be the same as that of the Proposed Building.
203
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Proposed Building
The Proposed Building’s water consumption is generated using the actual design based
on the type of fittings, flow rates, and building occupancy.
Carbon Calculator
Submittal
Design Assessment:
1. Specification of the water fittings with the flow rate.
2. W ater fittings efficiency calculation.
Construction Assessment:
1. Photographic evidence of the installed water fittings.
2. Specification of installed water fittings with the flow rate.
3. Final calculation of water fittings efficiency.
204
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
WATER EFFICIENCY FACTORS
POINT
WE2 Reduced Potable Water for Landscape WE 2 Ci
For Landscape Irrigation, Pursue a Designed System Which
Reduces Potable Water Source Through Alternative Means OR 2 Points
Refuses Potable W ater Use Completely
Aims
To promote landscaping strategies and elements, and to encourage rainwater
harvesting that reduces the use of potable water for landscape and irrigation.
Requirements
1 POINT:
Reduce potable water source by ≥ 50% through alternative methods for landscaping
uses, i.e., rainwater harvesting.
2 POINTS:
100% reduction of the potable water used for landscaping, i.e., completely refuse the
use of potable water.
Justification
To encourage and promote efficient usage of water irrigation by using a better type of
irrigation system and low irrigation type of landscape.
Carbon Calculator
None
Submittals
Design Assessment:
1. Narrative of the strategies and descriptions of how the system meets the
requirement.
2. Narrative by the landscape architect, explaining the selection of native or
adaptive plants, the efficient irrigation system and indicating that it will meet all
the requirements.
3. Calculation of landscape water consumption and reduction.
Construction Assessment:
1. Photographic evidence of the installed system and planted vegetation.
2. Final calculation of landscape water consumption and reduction.
205
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
EFFECTIVE WATER USE MANAGEMENT
POINT
WE3 Water Sub-Meter and Leak Detection WE 3 Ci
Install Individual Sub-Meters to Monitor Major Water Usage,
Linking All Private Meters to the Energy Management System 2 Points
(EMS) for Leak Detection
Aims
To reduce/avoid water wastage in case of leakage through early detection by having a
water leak detection system.
Requirements
1 POINT:
Install individual sub-meters to monitor major water usage in all these locations:
1. Cooling towers and make-up water tank.
2. Landscape watering system.
3. Kitchens.
4. Leased areas.
5. Fire resistant water tank system.
6. Main pipe distribution from tank OR internal domestic water tank pipe.
7. Rainwater harvesting system.
8. Recycled wastewater system.
1 POINT:
Link all private meters to the Energy Management System (EMS) for leak detection .
Justification
W ater sub-meters are used to measure water consumption, and the water leak detection
system is used to avoid water wastage.
Carbon Calculator
None
Submittals
Design Assessment:
1. W ater sub-meter specification.
2. Schematic drawings of water sub-meter installation.
3. W ater leak system specification.
4. Schematic drawings of the water leak detection system installation.
206
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. W ater sub-meter installation technical report.
2. As-built schematic drawings of water sub-meter installation.
3. W ater leak installation system technical report.
4. As-built schematic drawings of water leak detection system installation.
207
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
EFFECTIVE WATER USE MANAGEMENT
POINT
WE4 Recycled Grey Water WE 4 Ci
Aims
To encourage recycled wastewater use (grey water) for activities not related to food
and beverage (non-potable use) such as cleaning and landscaping in order to reduce
domestic water usage.
Requirements
1 POINT:
Recycle ≥ 10% of wastewater by using a wastewater filtering system.
2 POINTS:
Recycle ≥ 20% of wastewater by using a wastewater filtering system.
Justification
To encourage and promote the use of recycled wastewater system by using a
wastewater filtering system, and to reduce the consumption of potable water.
Potential Issues
Acceptance, as the concept of recycled wastewater is new in Malaysia.
Submittals
Design Assessment:
1. Design report and the calculation on the wastewater recycling system.
2. Schematic drawings of the wastewater recycling system.
Construction Assessment:
1. As-built schematic drawings of the wastewater recycling system.
2. Final calculation of the recycled grey water.
Carbon Calculator
None
208
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
209
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
WATER EFFICIENCY FACTORS
POINT
WE5 Water Conservation Strategies On-Site WE 5 Cr
Aims
To reduce the usage of potable water within on-site facilities during the construction
period.
CALCULATOR
1 POINT:
Use an efficient fitting tap in the construction site office/showroom.
Justification
Efficient water usage can be encouraged by using rainwater harvesting or recycled
storm water and efficient water fittings at the site. Saving water will reduce the cost of
both the main water supply and wastewater disposal (i.e., potable water and trade
waste), as less water will enter and leave the site.
Saving water can also provide opportunities for developing efficiencies in other areas.
For example, using less water may mean that pumping water around the site is reduced,
leading to savings in energy costs and greenhouse emissions. It can also reduce the risk
of environmental contamination or pollution, as water efficiency initiatives will lead to less
wastewater.
Baseline
W ater efficient fittings are measured based on the water flow rate. From the baseline
given below, the team must calculate the usage reduction from their proposed water
fittings against the baseline. The water efficient baseline is shown below:
210
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Proposed Design
The estimated water consumption is based on the proposed fittings and flow rate. The
requirement for this criterion is that the calculation must show the efficiency of the water
fittings during the construction stage.
Carbon Calculator
Stage 1
1. Daily usage.
2. Occupants.
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. Photograph showing the water fittings installed in the toilets on-site.
2. Calculation of the reduction of potable water usage.
211
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
WATER EFFICIENCY FACTORS
POINT
WE6 Rainwater Harvesting System During Construction WE 6 Cr
Aims
To reduce potable water usage during construction activities through the harvesting of
rainfall by focusing on the water usage for vehicle cleaning and usage in portable toilets
on- site.
Requirements
2 POINTS:
50% reduction of potable water usage for lorry cleaning and toilets.
Justification
Saving water will reduce the cost of both the main water supply and wastewater disposal
(i.e., potable water and trade waste), as less water will enter and leave the site.
Saving water can also provide opportunities for developing efficiencies in other areas.
For example, using less water may mean that pumping water around the site is reduced,
leading to savings in energy costs and greenhouse emissions. It can also reduce the risk
of environmental contamination or pollution, as water efficiency initiatives will lead to less
wastewater.
Carbon Calculator
All water calculations for this sub-criterion contribute to:
Calculator ID: W E-CAL03 W ater Conservation Strategies On Site
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
212
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Site plan showing the location of collected rainwater.
2. Report on the activities that use rainwater.
3. Photographic evidence on the collection of rainwater and also during the use of
it.
213
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC Req1 Design for Social Responsibility SC Req1 S
Aims
To assess and provide the relative ease of access and use of facilities for persons with
disabilities. In doing so, the building takes one step ahead in the pursuit of sustainability
by encompassing human ease and comfort without discrimination towards people with
different physical or mental forms.
Requirements
REQUIRED:
Prepare disabled-friendly amenities based on all legal and expert requirements but not
restricted to the following:
1. Uniform Building By-Laws; AND
2. MS 1183: Part 8 Code of Practice for Precautions in the Design and Construction
of Buildings: Part 8: Code of Practice for Means of Escape for Disabled People;
AND
3. MS 1184 Code of Practice on Access for Disabled Persons to Public Buildings (First
Revision); AND
4. MS 1331Code of Practice for Access of Disabled People Outside Buildings; AND
5. Guideline for Preparation of Minimum Amenities for the Disabled at Building
Projects by JKR, Architects Department, IPJKR October 2006 (JKR 20802 -0007-
2006); AND
6. Planning, Guidelines 7 Standards: Facilities of the Disabled, Town & Country
Planning Department, Ministry of Housing & Local Government Malaysia (JPBD
1/2000) 2002.
Justification
The credit is aimed at integrating all members with different abilities into society. It
presents a guide in the design process to help cater for the usability, safety, comfort, and
convenience without discrimination towards any occupants. By providing these qualities,
there is a probable increase in productivity rates and decrease in absenteeism.
214
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Plan on disabled facilities.
2. Detailed drawing of the facilities for the disabled.
Construction Assessment:
1. As-built plan for disabled facilities.
2. Photographic evidence.
215
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC1 Access to Views from Work Areas SC 1 S
Design ≥ 60% of the NLA Has a Direct Line of Sight Through Vision
1 Point
Glazing
Aims
To promote higher levels of well-being, productivity, and human comfort.
Requirements
1 POINT:
Design ≥ 60% of the occupied building spaces to have a direct line of sight through vision
glazing and measured between 0.8 m and 2.3 m above the finished floor plan levels.
Justification
W indows provide daylight in buildings and may also provide a view of the outdoors. The
character of the view is important to human well-being. Extensive research in
environmental psychology has established that access to outside views and nature, both
through a view and through immersion in natural settings, is beneficial.
For instance, hospital patients with a view of green spaces, as opp osed to those with a
view of a blank brick wall, recovered more quickly from surgery and required less post -
operative pain medication. This benefit is not simply associated with the possibility of
receiving higher light exposure from a more exposed façade. Recent studies have
proven that having access to views of nature in the workplace will provide relief from
boredom, anxiety, and stress, thus increasing occupants’ health and productivity.
216
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 41. Example of open-plan office layout with a maximum line of sight for outdoor view.
Carbon Calculator
None
Submittals
Design Assessment:
1. Typical floor plans indicating and clearly marked with the identified occupied
building spaces.
2. Plan and sectional drawings clearly showing the line of sight drawn from occupied
building spaces to the vision glazing perimeter.
3. Design strategy of the interior layout that will be designed or recommended to
maintain the view to the outside.
Construction Assessment:
1. As-built typical floor plans indicating and clearly marked with the identified
occupied building spaces.
2. As-built plan and sectional drawings clearly showing the line of sight drawn from
occupied building spaces to the vision glazing perimeter.
217
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC2 Compatibility of Urban and Façade Design to Cultural Values SC 2 S
Aims
The presence of culture and heritage is enhanced through its integration with recent
designs and current developments.
Requirements
1 POINT:
The project requirement will be determined later. However, this sub-criterion is open to
the project team to apply and propose. It will be decided on a case by case basis.
Justification
Cultural expression in buildings is at times incorporated in an abstract and modernised
manner. This point promotes and allows the award of 1 point based on the cultural
intentions of the building design.
Carbon Calculator
None
Submittals
Design Assessment:
1. Proof and documentation of the intent, proposed requirement, document
submittals, and design approach of the proposed sub-criterion.
Construction Assessment:
1. As-built drawing.
2. Design brief report.
3. Photographic evidence.
218
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC3 SHASSIC SC 3 S
SHASSIC 3 Points
Aims
To improve the health and safety conditions on the construction site.
Requirements
1 POINT:
SHASSIC Score 55% to 69%
Potential and significant high risks/hazards at the workplace are managed and
documented, but there are few medium-risk work activities that are neglected.
2 POINTS:
SHASSIC Score 70% to 84%
Potential and significant high risks/hazards at the workplace are managed and
documented, but there are few low-risk activities that are neglected.
3 POINTS:
SHASSIC Score 85% to100%
Potential and significant high risks/hazards at the workplace are managed and
documented.
Justification
The SHASSIC was originally developed to complement the normal contractual
requirements and specifications of a project. The rating system in SHASSIC is meant to
give recognition to the project for their efforts in ensuring safety and health at the
worksite. The SHASSIC is preferably conducted during construction in order to include the
different workers and trades involved at the site. The SHASSIC is recommended when the
actual physical work progress is between 25% and 75%.
Project developers should not use the SHASSIC independently as the working
requirements and specifications. Unless specified in the project contract, a safety and
health designated person should not use the SHASSIC to decide if the project site or parts
of the project site is in accordance with the requirements of the relevant Acts and
Regulations or the OSH Management System. Rather, project developers are still
obligated to the requirements of local legislation, approved standards, code of
practices, guidelines, specifications and contractual requirements.
Hence, assessment using the SHASSIC system sets out the safety and health management
and practices of the contractor for various aspects of construction activities as shown in
Figure 42. The SHASSIC covers three (3) main components of assessment, namely
document check, workplace inspection, and employees interview. It also covers
components such as OSH policy, OSH organisation, HIRARC, OSH training and promotion,
machinery and equipment management, materials management, emergency
preparedness, accident investigation and reporting, and records management and
performance monitoring.
Figure 42. Provide safety signage at scheduled waste storage area and the project site
entrance.
Carbon Calculator
None
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. SHASSIC certification.
220
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC4 Workforce Facilities SC 4 S
Aims
To ensure the health and safety of workers during construction, with effective provision
for basic facilities such as sanitation, drinking water, and safety equipment or machinery.
Unhygienic site sanitation facilities cause damage to the environment and to the health
of construction workers.
Requirements
1 POINT:
Provide at least the minimum level of sanitation/ safety facilities for construction workers.
Justification
Many local authorities and laws require employers to provide a safe working environment
for their workers as long as it is reasonably practicable. This constitutes the welfare and
personal hygiene needs of employees. It ensures that the workers are not exposed to risks
as a result of the project construction, by taking measures such as preventing the spread
of germs and disease, preventing ill health from the exposure to contamination, and
meeting the basic human needs of employees.
221
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. Site plan showing the location of workers’ facilities, including a septic tank.
2. Site photographs to demonstrate compliance by the contractor.
3. Detailed narrative on the provision of safe drinking water and sanitation facility for
construction workers and site personnel.
222
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SOCIAL AND CULTURAL SUSTAINABILITY
POINT
SC5 Construction IAQ Management SC 5 S
Aims
To reduce indoor air quality (IAQ) problems resulting from constru ction or renovation
activities and to promote the health and well-being of workers and building occupants.
Requirements
1 POINT:
Develop and implement an IAQ management plan for the construction and
preoccupancy phases of the building, as follows:
- During construction, meet or exceed the recommended control measures of Sheet
Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guidelines
for Occupied Buildings Under Construction, 2nd Edition 2007, ANSI/SMACNA 008-2008
(Chapter 3).
1. Protect stored on-site and installed absorptive materials from moisture damage.
2. If permanently installed air handlers are used during construction, filtration media
with a minimum efficiency reporting value (MERV) of 8 must be used at each
return air grille, as determined under ASHRAE Standard 52.2. Replace all filtration
media immediately prior to occupancy.
Justification
Construction activities are large polluters of the environment. Large volumes of
suspended particulate matters are released during the construction work, leading to air
pollution. Green buildings should address these issues. The Indoor Air Quality (IAQ) plan is
to prevent indoor air quality problems resulting from the construction/renovation process
in order to help sustain the comfort and well-being of construction workers during the
construction process, and also to protect the building occupants after construction is
complete and people move into the building.
If possible, avoid using permanently installed air handlers for temporary heating/cooling
during construction.
223
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. IAQ management plan during construction.
2. Report on the implementation of the IAQ plan on-site, including photographic
evidence.
224
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
DEMOLITION AND DISPOSAL FACTORS
POINT
DP1 Responsible Sourcing of Materials DP 1 Ci
Aims
To provide the specification of products and materials with responsible sourcing where
the manufacturer or supplier has initiated recycling activities to collect back their end
product wastes, thus reducing the wastes sent to landfills.
Requirements
1 POINT:
Provide at least three (3) product agreements of any building components/assemblies
sourced from manufacturers or suppliers who can collect or have a buyback programme
within the life cycle or at the end of the materials’life for recycling or reuse purposes.
Justifications
To maximise the recovery of resources from recyclable and biodegradable waste and
to reduce the burden on landfills. Manufacturers and suppliers are willing to collect back
old/used products for them to reprocess and at the same time, reduce virgin materials
from being harvested.
Carbon Calculator
None
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. List of the materials targeted to achieve this point; AND
2. A certificate/letter from the supplier/manufacturer as proof that they will collect
back the products supplied.
225
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
226
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
DEMOLITION AND DISPOSAL FACTORS
POINT
DP2 Design for Disassembly DP 2 Ci
Provide more than 3% (based on cost) of any building
components/assemblies that can be dissembled for future reuse 1 Point
or recycling
Aims
To design and specify the materials used that can be disassembled for future reuse or
recycling, thus reducing the waste to be sent to landfills.
Requirements
1 POINT:
Provide more than 3% (based on cost) of any building components/assemblies that can
be disassembled for future reuse or recycling; AND
Provide the building owner with the disassembly materials records and plan for major
disassembly materials installed in the building.
Justification
Design for disassembly allows the reutilisation of building components at the end of the
building life cycle. Hence, the aim is to encourage the installation of building
components/assemblies that can be easily disassembled for future use.
Carbon Calculator
None
Submittals
Design Assessment:
1. List of material specifications or manufacture data sheets.
2. Product brochure.
3. Calculation to prove the requirement has been achieved.
227
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Construction Assessment:
1. Photographic evidence of the installed materials.
2. Final calculation of the installed assembly materials.
3. Manufacturer details on the specifications and disassembly technique (if any).
228
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
DEMOLITION AND DISPOSAL FACTORS
POINT
DP3 Reusing Existing Structural Materials DP 3 Ci
Aims
To encourage the use of existing building construction and structure materials that are
found on-site.
To reduce waste and the carbon impact of manufacturing and transportation.
Requirements
1 POINT:
Maintain ≥ 30% of the existing area of any two of the following structures:
1. W all.
2. Floor.
3. Roof structure and finishes.
This point is eligible for ONE (1) exceptional score if the project succeeds in maintaining
> 50% of the existing area of two of the above structures.
Justification
Existing walls, floor, and roof can be maintained through good planning and a sound
method of demolishment. This can reduce waste and the construction cost of the new
building.
Conserve the present building structure (structural floor and roof decking) and envelope
(the exterior skin and framing, not including window assemblies and non -structural
roofing material).
Potentially unsafe materials that are reused are not included in the calculation of the
percentage.
229
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
TOTAL 530 m2
Carbon Calculator
None
Submittals
Design Assessment:
1. Calculation of the reused shell and structure.
2. Calculation of the reused content value of each material must be provided.
3. Calculation of the value of reused materials against the estimated total value of
the materials for the project.
Construction Assessment:
1. Photographic evidence of the existing structure that is maintained.
2. Final calculation of the value of reused materials against the estimated total value
of the materials for the project.
230
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
DEMOLITION AND DISPOSAL FACTORS
POINT
DP4 Recycling of Demolition DP 4 Ci
Aims
To reduce and recycle construction waste materials, thus reducing the waste sent to
landfills.
Requirement
1 POINT:
Recycle and/or salvage 50% (in volume) of non-hazardous demolition waste.
Justification
The contractor must have a good plan to manage construction waste. Segregation of
materials that can be recycled at a proper location and a bin are a must before sending
to a recycler for reprocessing into a new product.
Carbon Calculator
None
Submittals
Design Assessment:
1. Declaration letter/tender specification/bill of quantity to show the commitment to
implement the strategies.
Construction Assessment:
1. Documentation of possible recycled/salvaged construction waste and the
quantity.
2. Photographic evidence of the existing structure before the demolition activity
takes place.
3. Receipt of recycling activities, verified by the contractor.
231
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN1 Sustainable & Low Carbon Initiatives IN 1 S
Aims
To ensure MyCREST goals and processes are implemented and to assist in the design
stage in order to enhance the application and certification processes.
Requirements
2 POINTS:
A minimum of one (1) key member of the project team will be a MyCREST Facilitator.
Submittals
Design and Construction Assessment
1. Proof of appointment of the named MyCREST Facilitator.
232
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Aims
These are innovation points which should contribute to the effort towards gaining a
higher level of performance than what is stated in MyCREST. It is a recognition of
additional or outstanding efforts taken by a project applicant that extend beyond the
guidelines and requirements laid out by MYCREST that contribute to the reduction of
carbon emission.
Requirements
1 POINT awarded based on the innovation strategies, with a maximum of 6 points. All
Sustainable & Low Carbon Initiatives are required to reduce carbon emission and/or
contribute to sustainability by complying with at least one of the following three
mandatory criteria:
Carbon Sequestration
Any effort to capture and store carbon through bio-sequestration, principally tree
planting, preservation, relocation etc.
233
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Only six (6) Sustainable & Low Carbon Initiatives are allowed in a single certification, while
one (2) point is allocated to the Certified MyCREST Facilitator. These initiatives are
available in, but not limited to, the list below from MyCREST with priority given to carbon
sequestration, carbon reduction (CR), and carbon impact (CI) initiatives as a means to
reduce the carbon emissions of a building.
Exceptional scores are points achieved by any project which scores ABOVE the
maximum performance threshold in the MyCREST Scorecard.
Each threshold jump above the maximum performance in the MyCREST Scorecard is
given 1 point, as shown in the table below.
Please note that only a maximum of 2 (TW O) points can be achieved from the
Exceptional Score list.
234
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
235
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
The MyCREST Innovation sub-criterion provides opportunities for project teams to propose
new Sustainable and Low Carbon Initiatives as part of their scoring plan. The innovation
should not be part of a project’s main scorecard or scoring plan and not replicated from
the tools used. Preferences will be given to strategies that achieve a verifiable and
significant impact on carbon reduction. Each MyCREST innovation scoring proposal will
be evaluated for each project on a case-by-case basis while keeping in mind that the
implementation of any single initiative does not automatically approve a similar initiative
in other projects or future developments.
The MyCREST Sustainable and Low Carbon Initiatives allow project teams to pursue their
own innovative strategies provided the strategies are supported with proper
documentation, namely detailed narrative proposing the strategy or Innovation, detailed
list of the requirements to fulfil the sub-criterion, detailed list of submittals to fulfil this sub-
criterion, and the possible design approaches to achieve this strategy.
Submittals
Proof and documentation of the Innovation initiative.
236
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 Cr
Aims
To help address vehicle issues caused by transportation to and from the building and to
contribute to a reduction in vehicle usage.
Requirements
1 POINT:
Initiate carbon capture/sequestration strategies and possible carbon deposit into areas
that will not affect the atmosphere.
Submittals
Proof and documentation of the carbon storage initiative.
237
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 Ci
Aims
To remove vehicle exhaust fumes—mainly carbon monoxide—during normal car park
usage, creating an acceptably air-conditioned environment; and to remove smoke in
the event of a fire to assist in providing a safe means of escape.
Requirements
1 POINT:
Install car park mechanical ventilation that is controlled by carbon sensors.
Apart from removing hazardous exhaust gases to ensure cleaner air within the parking
area, this system provides fire authorities with the ability to purge smoke in the event of a
fire.
Submittals
1. Relevant documentation and verification of the use of ventilation fans in
accordance with the above.
238
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 Ci
Aims
To allow countries with emission reduction commitments to meet part of their
commitments by investing in projects in developing countries that reduce GHG emissions.
Requirements
1 POINT:
Implement CDM in the building design and/or operations as an optional method to
receive capital or technology for building sustainability.
Justification
The W orld Resources Institute defines a carbon offset as “a unit of carbon dioxide-
equivalent CO2e) that is reduced, avoided, or sequestered to compensate for emissions
occurring elsewhere”. Common renewable energy offsets are wind power, solar power,
hydroelectric power, and biofuel. Some of these offsets are used to reduce the cost
differential between renewable and conventional energy production, increasing the
commercial viability of choice to use renewable energy sources.
Once it has been accredited by the UNFCCC, a carbon off-set project can be used as
carbon credit and linked with official emission trading schemes, such as the European
Union Emission Trading Scheme or Kyoto Protocol, as Certified Emission Reductions.
239
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Figure 36. National CDM project cycle (retrieved from Malaysia CDM Information Handbook).
Submittals
1. Relevant documentation and verification of CDM implementation.
References
1. Ministry of Natural Resources and Environment. (n.d.). Malaysia CDM Information
Handbook.
240
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 S
Aims
To preserve the heritage of existing buildings.
Requirements
1 POINT:
The exact project requirement will be determined later. However, this sub-criterion is open
to project teams to apply and propose. It will be decided on a case-by-case basis.
Justification
The aim of this point is to award projects which allow the preservation of heritage
artefacts, monuments, and ruins within the project itself even though these entities must
not be within the project scope.
Submittals
1. Proof and documentation of the intent, proposed requirement, document
submittals, design approach of the proposed sub-criterion, and the carbon
calculation.
References
None
241
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 Cr
Aims
To encourage developers to pursue and achieve above the requirement of any credit
stated in MyCREST.
Requirements
1 POINT:
Achieve beyond performance for a maximum of TW O (2) credits in either MyCREST New
Construction or MyCREST Existing Building.
243
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
1. Proof of achievement and specification of strategies to gain exceptional
performance through official documentation as per the respective sub-criterion.
244
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
SUSTAINABLE & LOW CARBON INITIATIVES
POINT
IN2 Innovation IN 2 Cr
Aims
To provide teams with the opportunity to achieve exceptional performance above the
requirements set through their own creative, innovative, and practical strategies.
Requirements
1 POINT:
One point is awarded for each innovation achieved with the submittal of the (1) intent,
(2) proposed requirement, (3) documents, (4) design approach of the proposed
innovation credit, (5) carbon calculation, and (6) the fulfilment of the initiative.
Submittals
1. Proof and submittal of the intent, proposed requirements, documents, design
approach of the proposed sub-criterion, and the carbon calculation.
245
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
ELECTIVE:
HEALTHCARE
246
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
HC1 Connection to the Natural World HC 1 S
Provide Outdoor Places of Respite on the Healthcare Campus
to Connect Healthcare Patients, Staff, and Visitors to the Health 1 Point
Benefits of the Natural Environment
Aims
Provide outdoor places of respite on the healthcare campus to connect healthcare
patients, staff, and visitors to the health benefits of the natural environment.
Requirements
1 POINT:
Provide patients, staff, and visitors accessible outdoor places of respite equal to 5% of the
net usable programme area. Qualifying areas are defined below:
1. Provide additional dedicated outdoor place(s) of respite for staff, equal to 2% of
the net usable programme area.
2. Exterior places of respite shall be subject to occupancy, located within 60 meters
of a building entrance or access point, and must be spaces where no medical
intervention or direct medical care is delivered. Qualifying areas shall be open to
fresh air, the sky, and the natural elements, including seasonal weather. In
addition, qualifying areas shall comply with all of the following:
a. Seating areas shall provide options for shade or indirect sun. Provide shade
structures, a trellis or tree-shaded wheelchair accessible seating areas at a
minimum of 1 space/1 square meter of garden area with 1 wheelchair space
per 5 seating spaces.
b. Horticulture therapy or other specific clinical special use gardens (Cancer
Healing Garden, for example), not available to all building occupants, may
be used to meet up to 50% of the required area.
c. Universal access with places to pause, available to staff and/or patients.
(Nature trails may comprise up to 30% of the required area, provided trail
access is available within 200 feet of the building entrance).
Justification
Healthcare facility design should address the physical, emotional, and spiritual needs of
patients and/or residents, staff, family members, and visitors that inhabit these buildings.
Privacy, confidentiality, security, dignity, comfort, orientation, and connection to nature
are key elements and issues that need to be addressed in the design of supportive
environments.
Places of respite connected to the natural environment are key elements in defining a
supportive, high-performance healing environment with proven effects on the well-being
of patients, staff, and visitors and with improved clinical outcomes. A growing body of
research indicates that patients and medical staff experience positive benefits from
direct access to nature. Providing direct access to exterior spaces for patients, families,
247
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Consider issues of way finding and orientation, accessibility, strength and stamina,
activity and interest, privacy and security, and independence of the patient.
Provide choice and variety in the design of spaces (for example, spaces that engage all
the senses but also areas with limited sensory stimulation). Consider a variety of smaller
spaces conveniently located throughout the facility rather than one large space. Also,
consider integrating these exterior spaces with interior public spaces to enhance the
connection to nature throughout the facility. Design considerations should include
freedom from distractions, such as noise from mechanical systems, facility administrative
activities, and medical treatments.
Carbon Calculator
None
Submittals
Design Assessment:
1. A report of the intentions and aims with design diagrams describing a nd
demonstrating strategies that gear towards the goal that 75% of all inpatients and
75% of qualifying outpatients with > 4 hour LOS have access to secure and
supervised outdoor space in compliance with the credit goals.
Construction Assessment:
1. As-built floor plan showing the outdoor space connected to the patient area.
248
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
INFRASTRUCTURE AND SEQUESTRATION
POINT
HC2 Equipment and Medical Equipment Efficiency HC 2 S
Aims
To prevent contaminant releases to air, land, and water.
Requirements
1 POINT:
Establish oil interceptors at all drains from parking areas and central plant areas in
compliance with local regulations.
Justification
Healthcare facilities store and manage chemicals in both underground tanks and other
outdoor facilities. Along with run-off from parking areas, these are significant potential
sources of surface and groundwater contamination. By minimising potential exposure,
healthcare facilities can contribute to protecting the health of the surrounding
community.
249
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
4. Provide a continuous monitoring system for the tank system. The monitoring system
must be capable of detecting the entry of both liquid- and vapour- phase of fuel
oil and water into the secondary containment.
Carbon Calculator
None
Submittals
Design Assessment:
1. Compile the design documentation of on-site fuel oils to the storage system(s),
verifying compliance with the credit goals.
2. Compile a plan indicating the location of all storage facilities and a narrative
describing secondary containment provisions, verifying compliance with the
credit goals.
Construction Assessment:
1. As-built drawing plan showing the location of all storage facilities and on-site fuel
oils to the storage system.
250
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
Control and Strategies to Reduce Mould Occurrence for HC 3 S
HC3
Healthcare Buildings
Aims
To prevent mould growth in healthcare building areas and lodges to ensure building
users’ health and harmony.
Requirements
1 POINT:
1. Use double wall with proper insulation for 24-hour air-conditioned spaces.
2. Use proper PU or equivalent insulation to prevent thermal bridging around all 24
hours air-conditioned spaces; OR
3. Use any other methods or technology that can prevent mould growth in the
mentioned areas.
Justification
Mould can potentially cause health problems. It produces allergens (substances that can
cause allergic reactions), irritants, and in some cases, potentially toxic substances.
Inhaling or touching mould or mould spores may cause allergic reactions in sensitive
individuals. Hence, mould prevention is important in ensuring the health of building
occupants. For a healthcare building, this point is more important as patients will be very
sensitive to mould and air quality.
It is important to eliminate wet or damp areas on all surfaces to prevent mould growth.
Humidity must be controlled in air-conditioned spaces. Air movement must be enhanced
in non-air-conditioned spaces and thermal bridging shall be avoided.
251
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Carbon Calculator
None
Submittals
Design Assessment:
1. Basic report outlining the strategies that will be implemented to fulfil the
requirements for mould prevention.
2. CFD simulation of naturally ventilated spaces that are adjacent to air-conditioned
spaces, indicating the air movement and wall temperatures at critical times.
3. W alls and slabs details around the 24 hours air-conditioned spaces, indicating
proper thermal bridging prevention strategy.
4. Basic post-construction building commissioning plan, indicating sufficient moisture
removal from the building construction before occupancy.
Construction Assessment:
1. Provide a report on the reading of RH and temperature logging.
252
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
HC4 Indoor Leisure Areas HC 4 S
Aims
Connect patients, visitors, and staff to the natural environment through views of nature
from indoor places of respite.
Requirement
1 POINT:
Provide patients, visitors, and staff accessible indoor places of respite with 90% of the
occupied area of those spaces having direct views of nature. To qualify, these spaces
must have a direct connection to the natural environment and must have spaces where
no medical intervention or direct medical care is delivered and where no facility
administration or maintenance is being conducted.
Audio-visual technology that simulates nature may be used to fulfil up to 20% of the credit
goal in spaces that are not accessible to nature.
Justification
Research shows that physical and visual connections to the natural environment (access
to outdoor space, views of nature, natural daylighting) provide social, psychological,
and physical benefits. Such connections also assist in patient recovery and healing,
reduce stress, and improve the overall healthcare environment. Similar benefits accrue
to staff, thus leading to improved delivery of services to the patients they serve.
Carbon Calculator
None
253
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Submittals
Design Assessment:
1. Floor plans, highlighting places of respite with views of nature.
2. Building programme and calculation, showing that 90% of these spaces meet the
credit goal of having direct views or connection to nature.
3. Compile annotated and descriptive plans graphically , demonstrating the site
planning principles to maximise the experience of significant natural features for
therapeutic value.
4. A list of all places of respite in the building programme. Identify their intended
activities and areas, with a calculation showing that 90% of the aggregate area
of those spaces meets the credit goal of having direct views or connection to
nature.
5. Compile floor plans, highlighting all places of respite and indicating those with
views of nature.
Construction Assessment:
1. As-built floor plan, showing the places of respite with views of nature.
254
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
HC5 Daylight & Views: Lighting & Circadian Rhythm HC 5 S
555 Reinforce Natural Circadian Rhythm (Sleep/Wake Patterns) in
Patients and Daytime Staff, and Promote Alertness in Both Day- 1 Point
Shift and Night-Shift Staff
Aims
To reinforce natural circadian rhythm (sleep/wake patterns) in patients and daytime
staff, and to promote alertness in both day-shift and night-shift staff.
Requirements
1 POINT:
Establish electric lighting and daylighting systems and controls for patient areas and staff
work areas based upon the principles of circadian rhythm (a self-sustained biological
rhythm, which in an organism’s natural environment normally has the period of
approximately 24 hours).
Justification
The human body’s hormone levels are largely influenced by its daily exposure to light and
darkness. Natural light reportedly helps regulate the circadian rhythm and thus has a
significant effect on one’s physical and emotional wellness. Lighting and circadian
rhythm can improve the healing environment by supporting patient comfort and staff
performance with light that adapts to individual needs. It simulates natural daylight while
indoors, thus helping to maintain the biorhythm and speed up the healing of patients.
This connection has been observed in hospitals wherein patients who are exposed to
generous amounts of sunlight have reported feeling less pain and stress, and even use
up to 22 per cent less medication per hour.
Staff Areas
In staff areas, establish lighting to support work performance and alertness through both
daytime and night time lighting cycles. Ensure that the area has multiple levels of lighting
available.
255
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
1. Provide sleeping areas which are close to complete darkness for staff and
residents. If more than one person uses the sleeping room, provide a night-time
navigational lighting system in the amber to red area of the colour spectrum.
2. Provide at least one location for night-shift staff that provides a separately
controlled vertical lighting element of 4000 K or greater colour temperature with a
target vertical luminance level of 250 foot candles when two (2) feet away at eye
height measured. Provide a control that turns the lighting element off when the
space is unoccupied. Provide space for stretching and/or mild physical activity to
support alertness. Ensure that staff are not required to walk through this area to
access the sleeping area.
3. Provide access to daylight for all staff on their regularly traversed work path
without the need to enter a patient’s room or other private space.
The timing of an individual’s circadian function will typically vary depending upon their
population group (i.e. the young, the aged, those undergoing chemotherapy, day -shift
versus evening- or night-shift staff). Therefore, any lighting system that helps to support a
healthy circadian rhythm must be capable of being tuned to the individual patient or
staff. Care must be taken to educate staff on the use of such a system because when
the lighting works against the establishment of a healthy circadian rhythm, adverse
impacts may occur.
Carbon Calculator
None
Submittals
Design Assessment:
1. Drawings and specification information in compliance with the credit goals.
Construction Assessment:
1. Lighting specification.
2. As-built plan, showing the installed circadian rhythms lighting.
256
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
MAXIMUM
OCCUPANT AND HEALTH
POINT
HC6 PBT Source Reduction – Mercury in Lamps HC 6 S
Reduce the Release of Persistent Bio-Accumulative and Toxic
Chemicals (PBTs) Associated with the Life Cycle of Building 1 Point
Materials
Aims
Reduce the release of persistent bio-accumulative and toxic chemicals (PBTs) associated
with the life cycle of building materials.
Requirements
1 POINT:
Specify and install low-mercury fluorescent lamps according to the following criteria as
specified in European lighting industry standards (Directive 2011-65, ELC, CELMA):
Type
Mercury in single capped(compact) fluorescent lamps not exceeding
1
(per burner):
1 (a) For general lighting purposes < 30W : 5 mg
1 (b) For general lighting purposes ≥ 30Wand < 50W: 5 mg
1 (c) For general lighting purposes ≥ 50W and < 150W : 5 mg
1 (d) For general lighting purposes ≥ 150W: 15 mg
For general lighting purposes with circular or square structural shape and
1 (e)
tube diameter ≤ 17 mm
1 (f) For special purposes: 5 mg
Mercury in double-capped linear fluorescent lamps for general lighting
2 (a)
purposes not exceeding (per lamp):
Tri-band phosphor with a normal lifetime and a tube diameter < 9 mm
2 (a) (1)
(e.g. T2): 5 mg
Tri-bandphosphor with normal lifetime and a tube diameter 2:9mm and
2 (a) (2)
17mm (e.g. T5): 5 mg
Tri-band phosphor with a normal lifetime and a tube diameter > 17mm
2 (a) (3)
and ≤28 mm (e.g. T8): 5 mg
Tri-band phosphor with normal lifetime and a tube diameter > 28 mm (e.g.
2 (a) (4)
Tl2): 5 mg
2 (a) (5) Tri-band phosphor with long lifetime (≥ 25000 h): 8 mg
2 (b) Mercury in other fluorescent lamps not exceeding (per lamp):
2 (b) (1) Linear halophosphate lamps with tube > 28 mm (e.g. T10 and Tl2):10 mg
2 (b) (2) Non-linear halophosphate lamps(all diameters):15 mg
2 (b) (3) Non-linear tri-band phosphor lamps with tube diameter > 17mm (e.g. T9)
Lamps for other general lighting and special purposes(e.g. induction
2 (b) (4)
lamps)
257
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
258
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
259
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Justification
PBTs are toxic chemicals of particular health concern because they do not break down
quickly in the environment, they become widely distributed geographically, and they
bio-magnify or concentrate in the tissue of living organisms as they move up the food
chain. With a few exceptions, the major source of human exposure to PBTs in the general
population occurs from the consumption of contaminated food in the ordinary diet.
These toxic chemicals cause a range of adverse wildlife and human health effects,
including cancer, and developmental impacts in nervous, reproductive, and immune
systems.
Immature, developing organisms are often the most sensitive to exposure to PBTs.
Because of their toxicity, persistence, and bio-accumulative characteristics, even very
small, difficult to detect releases can lead to harmful exposure. This has led to an
emphasis on strategies targeting the elimination of the production and use of PBT
substances, or those that are known to lead to their formation, rather than attempting to
control emissions. Mercury is a potent neurotoxin. Significant amounts of mercury
released into the environment are transformed into methyl-mercury, which bio-
concentrates in the food chain.
260
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
building materials or unavoidably produced and released into the environment during
one or more stages of the material’s life cycle.
Carbon Calculator
None
Submittals
Design Assessment:
1. Compile the documentation, verifying compliance with the credit goal criterion
for mercury content in fluorescent lamps.
Construction Assessment:
1. Lighting specification.
2. As-built plan, showing the installed low mercury lighting.
261
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 1
Technical Notes on MyCREST Baseline
262
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
INTRODUCTION
This technical report represents a summary of the deriv ation of the MyCREST
baseline in each carbon emission calculator.
NO CALCULATOR ID CODE
1 IS-CAL01
CARBON ACCOUNTING IN SITE CALCULATOR
IS-CAL02
EP-CAL01
2 ENERGY MODEL TEMPLATE CALCULATOR
EP-CAL02
3 EC-CAL01
LIFE CYCLE ANALYSIS – BUILDING W ORKS CALCULATOR
EC-CAL02
4 W E-CAL01
W ATER CONSERVATION STRATEGIES CALCULATOR
W E-CAL02
5 EMISSION REPORTING: CONSTRUCTION MACHINERY
IS-CAL05
CALCULATOR
6 CONSTRUCTION MATERIALS TRANSPORTATION CALCULATOR EC-CAL03
7
CONSTRUCTION W ASTE MANAGEMENT CALCULATOR W M-CAL01
263
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
INTRODUCTION
Tree Species
Examples of biodiversity for plant less than 11 inch are - Ferns (1 family consists
of 11000 species), Aroids, Gingers (more than 1000 species), Bamboo (10
families and more than 50 genera), Orchids (most diverse), Bryophyte (such as
mosses), Rattan, Shrubs, Ground covers, Liana, Palms (8 families with 60
genera), cycads (250 species) and annuals
Tree Size
11 inch trees sequester more carbon which can be claimed later based on
carbon sequestration rate. In this section, it can be claimed based on
percentage. There are 2 ways to get credit, either through carbon
sequestration rate or percentage of preserved trees.
Tree Planting
Based on the rate of sequestration and both percentage as well as ca rbon
rate.
264
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Sequestration Rate
Coefficient rates for individual species are different. It involves time and cost to
get the exact sequestration rate for each individual species. On top of that,
data availability on sequestration rate in Malaysia is very limited. Therefore, we
use a standard coefficient rate for your ease. Any effort made to get the exact
sequestration rate is really appreciated.
Landscaping Process
In this section, all data will be based on flora inventory and analysis done by
botanist/horticulturist. During this process, only tree with a trunk diameter of 11
inch and above will be counted. However, if effort made to hire botanist to
conduct inventory and analysis for trees with a trunk diameter less than 11 inch,
credit can be claimed based on carbon sequestration rate but time and cost
will be affected. The cost to identify single species is 200.00/specimen. All the
information on invasive or non-invasive species will be provided by the botanist
at the first stage of site inventory and analysis report. The type of fertilizer is not
relevant in this section, only trees or greenery area.
Baseline
As baseline, the site of original Greenfield area will be measured by cutting all
trees.
A. W ater bodies
B. Trees
C. Grass
The calculation on carbon sequestration will be divided into these three types
of trees:
A. Water bodies
265
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
B. Trees
Ms = 0.0313*(D2H)0.9733
Mb = 0.136*Ms1.070
Ml = 1/Ml=1/(0.124Ms0.794)+1/125
C. Grass
266
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Derivation of Baseline
3. Baseline Tree taken from FRIM derive from Kato et al. (1978).
267
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
b Carbon sequestration- Why 11 inches? Does an 11-inch tree sequester more or less carbon than a sapling?
preservation
In this section, all data will be based on flora inventory and analysis done by a
botanist/horticulturist. During this process, only trees with a trunk diameter of 11-
i) For non-urban areas:
inch and above will be counted. However, if effort made to hire a botanist to
conduct an inventory and analysis for trees with a trunk diameter less than 11-
Preserve 60 - 80 Percent
inch, credit can be claimed based on carbon sequestration rate but time and
of trees with trunk
cost will be affected. Examples of biodiversity for plant less than 11-inch are -
diameter larger than 28
Ferns (1 family consists of 11000 species), Aroids, Gingers (more than 1000
cm
species), Bamboo (10 families and more than 50 genera), Orchids (most diverse),
Preserve more than 80
Bryophyte (such as mosses), Rattan, Shrubs, Ground covers, Liana, Palms, (8
Percent of trees with trunk
families with 60 genera), cycads (250 species) and annuals.
diameter larger than 28 CR Cost to identify single species – 200.00/ specimen
cm
ii) For urban areas: Furthermore 11-inch trees sequester more carbon which can be claimed later
based on carbon sequestration rate. In this section, it can be claimed based on
percentage. There are 2 ways to get credit, either through carbon sequestration
Preserve 70 - 80 Percent
of trees with trunk rate or percentage of preserved trees.
diameter larger than 28 In this case, we based on percentage to get point later on other section we used
cm carbon rate to get another point.
Preserve more than 80
Percent of trees with trunk
diameter larger than 28
cm
268
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Approach and Strategy identify variation in sequestration rate but this does not seem
to be taken into account.
Coefficient rate for an individual species is definitely different. It involves time and
Carbon sequestration- cost to get the exact sequestration rate for each individual species. On top of
preservation (Cont’d) that, data availability on sequestration rate in Malaysia is very limited. Therefore,
we use a standard coefficient rate for your ease. Any effort made to get the
i) For non-urban areas: exact sequestration rate is really appreciated.
Preserve 60 - 80 Percent
of trees with trunk Brown field site with no trees cannot achieve any credit in this category.
diameter larger than 28
cm No trees. Propose more trees to credit.
Preserve more than 80
Percent of trees with trunk
How is ‘integration to architectural design’ assessed?
diameter larger than 28
cm
Based on the percentage of green area per site area
ii) For urban areas:
Preserve 70 - 80 Percent
of trees with trunk
diameter larger than 28
cm
Preserve more than 80 Percent
of trees with trunk diameter
larger than 28 cm
c Carbon sequestration restoration Reference to LEED – are US horticultural solutions applicable to Malaysia?
(new tree/s planting )
CR It depends on a situation, or else hire a Malaysian horticulturist as a consultant to
Plant new vegetation on advice on certain things. For instance, soil in US is more alkaline while in Malaysia,
30% of site area excluding it is more acidic and this will influence types of fertilizer and maintenance wise
building foot print
269
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Plant new vegetation on Define ‘tree planting’ – are the criteria only based on rate of sequestration?
40% of site area excluding
building foot print No, but they will be based on both percentage and carbon rate as stated earlier
Plant new vegetation on
50% of site area excluding
building foot print Are the information on invasive and noxious weeds provided? What types of fertilizer
Replant vegetation on are required or permitted?
more than 50% of site
area excluding building All information on invasive or non-invasive species will be provided by the
foot print botanist at the first stage of site inventory and analysis report
Produce carbon sequestration Types of fertilizer are not relevant in this section, only trees or greenery area
of not less than 0.5tCO2e
270
MyCREST/App1/ver2.0/19062020
MyCREST© 2020 Reference Guide Operation & Maintenance Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
In MyCREST’s operational energy calculations, points are awarded according
to improvement of the baseline model and its predicted energy consumption.
The baseline model is a model that is based on the basic geometry of the
proposed design.
Passive Design:
The baseline must achieve a minimum of OTTV = 50 W /m2, RTTV = 25W /m2 (with
skylights) and minimum U values as stated in MS1525.
The followings are the additional characteristics of the baseline model:
W indows
W WR = 50% and must be evenly distributed on ALL facades
271
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Active Design:
Equipment
Active design shall follow the requirements as stated in the MyCREST
MODELLING GUIDE as per Appendix 2.
Baseline spaces by space Lighting Power Density (LPD) are as stated in the EP4
Artificial Lighting.
The ACMV Basis of Design must comply with the ASHRAE 62.1 and the ASHRAE
55.
OR
2. If the MyCREST calculator is used and In lieu of the above, the baseline
model average OTTV value for all facades can be calculated to reach
a combination of passive parameters to achieve a value not exceeding
50 W /m2.
Effects of the orientations can be included by assuming that with the
values of the passive design, the building is assumed to orientate exactly
at north- south based on the site boundaries.
Derivation of Baseline
The carbon emission factor for electricity derived from the CIS 20:2012, Green
Performance Assessment System in Construction, pg: 31, Construction Industry
Development Board Malaysia (CIDB).
272
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
Baseline for total structural element embodied carbon must be < 0.34
tCO2e/m2. The propose materials embodied carbon are deducted from
baseline to get the percentage of reduction. The point given will be based on
the percentage reduced from baseline.
Derivation of Baseline
The development of the baseline for MyCREST LCA calculator was based on
two case studies. Two projects with similar material specifications and close to
conventional type of building have been chosen to get the baseline for this
calculator. For the purpose of this criterion, only the following structural
elements were taken into account:
Slab
Column & Beam
W all
Roofing
W indow frame & glazing
The value of the embodied carbon for each material listed above was taken
from
the Green PASS embodied carbon building materials.
Challenges &Limitation
No database on the embodied carbon per m2 for different types of
buildings materials normally used in Malaysia.
273
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
W ater efficient fitting is measured from the water flow rate. From the baseline
given below, the team must calculate the reduction of their proposed water
fitting from the baseline. The water-efficient baseline is as shown:
The carbon emission factor for processed water is 0.419 kg CO2e/ m3.
Derivation of Baseline
The baseline is generated from the minimum flowrate / water consumption for
1 Star rated in Guideline for Voluntary W ater Efficient Products Labelling
Scheme, April 2013, SuruhanjayaPerkhidmatan Air Negara (SPAN).
The carbon emission factor for processed water derived from the CIS 20:2012,
Green Performance Assessment System in Construction, pg: 31, Construction
Industry Development Board Malaysia (CIDB).
274
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
The MyCREST Construction Transportation & Machinery Emission Calculator
calculates all onsite activities that require transports and machineries. The
following table shows the construction activities from site clearing to external
works.
There is no baseline for this calculator as the applicant only needs to report the
total carbon emission released by their machineries for the total duration of
construction stage.
Type of
Activity
Transportation/Machinery Energy source
Lorry Varies
Site Clearing Back hoe Diesel
Crane Diesel
Lorry Varies
Earthwork Back hoe Diesel
Crane Diesel
Lorry Varies
Substructure work Back hoe Diesel
Crane Diesel
Lorry Varies
Superstructure
Back hoe Diesel
work
Crane Diesel
External works Lorry Varies
(excluding Back hoe Diesel
landscape
Crane Diesel
works)
275
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
This calculator was developed to consider the reduction of carbon emission in
materials transportation when purchasing regional materials within 500km
distance from site. All materials transportation use diesel-engine, heavy truck
type with a distance of 500km between the factory and the project site.
Carbon emission of diesel-engine, heavy truck = 2.7CO2 kg/litre
Derivation of Baseline
Data of carbon emission of diesel-engine, heavy truck was taken from: The
Contribution of Road Transport to a Cleaner Environment, DAF,
http://www.daf.eu/UK/Trucks/Documents/Road-Transport-and-the-Environment.pdf
AND
CIS 20:2012, Green Performance Assessment System in Construction, pg: 31,
Construction Industry Development Board Malaysia (CIDB).
276
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Baseline
There are seven categories of waste listed in the calculator. Each category will
have its own type of waste. For the baseline, each type of waste is set to be
sent to landfill 100% as a mode of disposal and the mode of transportation is
diesel lorry. The details of the baseline are as follows:
BASELINE
Energy
Main Source
Mode of tCO2e/t tCO2e/unit of
Category Types of waste Transportation (Electricity/D
Disposal Waste Transportation
Mode iesel/Petrol/
Natural Gas)
Used Cooking Landfilled
Lorry Diesel 0.0027
Oil
Schedule
Paint Landfilled Lorry Diesel 0.0027
Batteries Landfilled 0.075 Lorry Diesel 0.0027
Glass Landfilled 0.026 Lorry Diesel 0.0027
Metal Landfilled 0.02 Lorry Diesel 0.0027
Recyclable
Aluminium Landfilled Lorry Diesel 0.0027
Cardboard Landfilled 0.58 Lorry Diesel 0.0027
Residual Landfilled Lorry Diesel 0.0027
Biodegradable Landfilled 0.213 Lorry Diesel 0.0027
Concrete Landfilled Lorry Diesel 0.0027
Wood Landfilled Lorry Diesel 0.0027
Inert
Cement Landfilled Lorry Diesel 0.0027
Tiles Landfilled Lorry Diesel 0.0027
Mixed Municipal Food Landfilled Lorry Diesel 0.0027
Solid Food Packaging Landfilled Lorry Diesel 0.0027
Reusable Landfilled Lorry Diesel 0.0027
Derivation of Baseline
Carbon emission for waste disposal process and transportation was taken from the CIS
20:2012, Green Performance Assessment System in Construction, pg: 32-34, Construction
Industry Development Board Malaysia (CIDB).
277
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 2
MyCREST Building Baseline Modelling Guideline
278
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
279
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
INTRODUCTION
1. This document guides on the use of the MyCREST Simulation tool and the
Baseline Building Energy Model (SBEM). It also guides for the use of other
approved software tools comprising the MyCREST Baseline Calculation
Methodology (BCM) when demonstrating compliance for:
a. MyCREST Design
2. This document is under a continuous review. It will be updated as and when
the need for additional clarification is identified.
3. To be approved, the software tool must satisfy the criteria as published by
MyCREST Panel. These requirements are updated from time to time and cover
a number of generic issues as follows:
a. The software tool has to demonstrate that the calculations are
technically robust and that they cover a necessary minimum set of
energy flows.
b. The software tool has to demonstrate that it follows the procedures for
compliance and certification as defined in this document, including the
use of the BCM databases. The definitions of Baseline and Reference
buildings and other issues are defined from time to time.
c. The software tool has to demonstrate that it reports a minimum set of
output parameters and that these parameters can be passed
appropriately to standard modules for:
i. Compliance checking
ii. Deriving a set of recommendations for energy efficiency
improvements.
4. In addition to ensuring that the software tools are compatible in terms of
technical scope, the approval process also checks that the procedural
guidance is being followed in terms of the calculation and reporting processes.
VERSION POLICY
5. All software tools, including the MyCREST template tool and the approved
Dynamic Simulation Models (DSM), evolve with time as improvements are
made to functionality and the quality of the underlying algorithms.
6. All calculation methods involve a degree of simplification and there are two
classes of software tools available for Building Regulations compliance for
buildings other than dwellings. The tools are:
a. The MyCREST Static tool
280
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
281
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
BUILDING ENVELOPE
7. For the Baseline Building, the windows, doors and roof light areas need to be
modeled to comply with OTTV 50 W /m2 and OTTV 25W /m2. The following of the
characteristics is for the baseline model:-
a. Passive Design:
The Baseline must achieve a minimum of OTTV = 50 W /m 2, RTTV = 25W/
m2 (with skylights and minimum U values as stated in MS1525.The
following are the additional characteristics of the baseline model:
W indows
W WR = 50% and must be evenly distributed on ALL facades
b. Active Design:
Equipment
Active design shall follow the requirements as stated in the MyCREST
MODELLING GUIDE. Baseline spaces by space Lighting Power Density
(LPD) are as stated in the ACMV Basis of Design, which must comply with
ASHRAE 62.1 and ASHRAE 55.
HVAC SYSTEM
8. Each space in the Baseline building will have the same level of servicing as the
equivalent space in the Actual building.
9. A space is only considered as having air-conditioning if the system serving that
space includes refrigeration. Night cooling using mechanical ventilation is not
air-conditioning. If the same mechanical ventilation system that is used for night
cooling is also used to provide normal ventilation, then the space should be
regarded as being mechanically ventilated.
10. For Baseline Building, the active design shall follow the baseline requirement for
EQUIPMENTS as below:-
a. Chiller Efficiency : MS1525
b. Motor efficiency : MS 1525
AUXILIARY ENERGY
11. Baseline auxiliary for motor and pump should be complied as below:
a. Motor efficiency : MS 1525
12. The ambient lighting in the Baseline building is shown in table below without
compromising the occupant comfort.
282
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
283
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
284
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
General Exhibition 11
Restoration 18
Bank/Office – Banking Activ ity Area 16
Religious Buildings
Worship Pulpit, Choir 26
Fellow ship Hall 10
*Values taken from MS1525 in order to take into account the technology presence in
the market.
Baseline should comply with the LPD guidelines to improve energy efficiency by
reducing wasteful design through limiting power allowed for lighting without
compromising occupant comfort and visual performance. Reduce connected
lighting power density below than allowed by IESNA or ASHRAE standard 90.1 2007
using either space by space method or area weighted whole building lighting power
average. The lux level according to the spaces must comply with the minimum
standards in the IESNA Standard Handbook 2000. (In exception of office and selected
spaces which has been derived from MS1525).
LIGHTING
13. Lighting is modeled according to the baseline and designed Lighting Power
Density with the compliance of lux level according to IESNA.
14. The general lighting in the Actual building will include any capabilities of
modeling daylight harvesting, and occupancy sensor control.
15. The CO2 emissions from the Actual and Baseline building is based from KETTHA
conversion. This conversion will be updated from time to time. The current
conversion is 1kW h equal to 0.747 kgCO2e (MGTC 2011).
285
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
ENERGY AUDIT
PURPOSE
SCOPE
1. The whole building office area and car park area including landscape areas
286
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
THE REPORT
287
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 3
MyCREST Guide for PV Solar Energy Generation
Estimation
288
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The following is a simple set of guidelines for projects to estimate the annual electrical
energy generation for solar renewable systems in MyCREST. In MyCREST, solar energy
generation is calculated under ‘renewable energy’ and represents carbon amount
that can be offset from the carbon emission. In MyCREST, the solar energy generated
cannot be used to attain points under ‘Energy Performance’, but can attain points
under ‘Renewable energy’ and ‘Innovation’.
Various factors can contribute to the amount of electrical energy that can be
generated by Solar panels. These include the solar panel specifications, the available
solar radiation and cloudiness of the sky, the degree of orientation of the panel
towards the annual sun path and the solar panel area and material of the solar cells
itself.
Essentially, the following steps should be taken:
289
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 4
Method of Modelling CFD
290
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
By analyzing the varied geometry of buildings through CFD and visualization tools, the
environment around, within and over the urban forms can be analysed. Wind and
sunlight are strong directional factors that can influence the microclimate around and
inside a building - these studies will further enhance the knowledge of the accuracy
of these predictions in order to assist in strategic design decisions. The methodology
emphasises to use the current developments in computational fluid dynamics and
sunlight visualisation software to analyse the impact of bioclimatic parameters.
Because these models and simulation process make heavy demands on input and
computing time, the necessary hardware and software are crucial for this
achievement.
The parameters that can be analysed are external and internal i.e. Room air
distribution, pressure regime analysis, temperature profiles analysis and external
temperature analysis.
CFD or Computational Fluid Dynamics (CFD) system is concerned with the numerical
simulation of air flow and heat transfer. It gives building designers the information they
need for detailed predictions of air flow and heat transfer processes in and around
building spaces - taking into account boundary conditions such as the effects of
climate, internal energy sources and HVAC systems.
291
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Zonal analysis can also be used for analysing infiltration and natural ventilation in
buildings. It uses a zonal airflow model to calculate bulk air movement in and through
the building, driven by wind and buoyancy induced pressures.
2. Predict internal cross ventilation or stack effect in at least 50 percent of the main
occupied areas of the building
One of the focuses of this point is to demonstrate how effective is the wind penetration
into internal spaces and rooms such as occupied rooms, internal light wells of corridors
as well as gaps between buildings and courtyards. Another focus is to assess the
comfort implications of a series of ‘what if’ options with respect to building form. As a
result, a closed plan can be developed into a more open design. It is therefore
possible to investigate the wind penetration into elements such as internal light wells
as well as gaps between buildings and courtyards. By assessing the comfort
implications of a series of ‘what if’ options with respect to building form, a closed plan
can be developed into a more open design – while at the same time, ensuring air
movement and enlivening the internal environments.
The CFD modelling shall be carried out using well validated software. The CFD solver
shall have the minimum capability of solving the Navier-Stokes fluid flow equations for
three dimensional incompressible flows at steady state on a body conforming
computational grid. Turbulence modelling shall also be included with the minimum
requirement of using the standard k-Ɛ turbulence model, coupled with standard wall
function.
All simulation models shall be carried out under isothermal condition of 33.0°C air
temperature at steady state condition.
292
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
and surrounding development are located within hilly terrain, the topography
information shall be included in the simulation models. The computational domain
shall be further extended from the outer edge of the proximity regions to the boundary
such that it would not result in non-physical airflow solution, after the solution has
converged. The computational domain shall also be aligned along with the wind flow
direction. The domain height shall be extended, approximately 3 times the height of
the tallest building within the defined vicinity.
The computational grid generated for all simulations should resolve the salient flow
features in the apartment units and around the development. As a guide, the
dimension of the computational element should be set at 0.1 to 0.2 m in the
apartment unit, 0.5 to 1.0 m at all buildings and ground level and 10 m at the far field
boundary with a minimum of 50 m away from the ground.
Based on local climatic wind condition, meteorological data on the prevailing wind
direction and velocity of the proposed site location for at least three prevailing wind
directions shall be used for the CFD simulation. Examples of the prevailing wind
conditions such as the mean speed and direction for Singapore shall be taken from
table below. The inbound vertical wind profile shall assume to be given by the
logarithmic Law with reference height at 10 m.
Table 1: Tabulation of Prevailing W ind Direction & Speed obtained from NEA over a
Period of 18 Years.
North 2.0
North-East 2.9
South 2.8
South-East 3.2
There shall have two large scale simulation models using the specified computational
domain and grid to assess the wind flow conditions and air-flow pattern within the
development and units. The simulation modelling can be conducted based on the
two best prevailing wind directions for the building development that is North or North -
East (N or E) and South or South-East (S or SE).
293
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
294
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
The selected space is deemed to have good natural ventilation if the area -weighted
average wind velocity of the unit is not less than 0.6 m/s. The overall percentage of
units achieving good natural ventilation is given by:
∑ (No. of Selected Units for Each Layout x Area-W eighted Average W ind Velocity) x
Total Number of Selected Units x 0.60 m/s
100%
The Qualified Person (QP) and other appropriate practitioners shall ensure that the
following report is available as evidence to demonstrate compliance with the
ventilation simulation framework. The report should comprise the following items:
i. Cover page with a proper title, photo of development, developer’s information
(including developer’s name and address and person-in-charge), Consultant’s
detail (including the principal’s name and authorized signature, firm’s address
and person-in-charge)
ii. Table of contents
iii. Executive Summary
Background of the development
Main findings
Concluding remarks
iv. Background/ Introduction
v. Methodology
Describe methodology used in the study
Provide rationale for the units selection as well as salient information such
as the total no. of units and different design units layout and location
vi. Geometrical Model should include
Isometric view of the development from various angles
Domain size used
Plan and 3D isometric model of units form various angles
vii. Simulation settings
Boundary conditions
CFD software/ models used/ numerical scheme
Mesh/ cell sizing
Solution control-convergence criteria
viii. Results and discussions
Simulation results for the development for all direction showing the main
graphical plots of the plan pressure and velocity vector salient findings
Tabulation showing the listing and details of all typical unit types and the
selected unit types as well as the corresponding number of units and the
area-weighted average wind velocity within each selected unit where
applicable.
Calculation of percentage of units with good natural ventilation and
area-weighted average wind velocity of 0.60 m/s or more.
ix. Conclusion
x. The following plots are to be placed in the appendices
295
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
296
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 5
Occupants’ Satisfaction Survey Sheet
297
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
4. How would you describe the 10. Are you near to an exterior wall
work you do? (within 15 feet)?
Administrative support Yes
Technical No
Professional
Managerial/ supervisory
Other 11. Are you near a window (within
15 feet)?
5. W hat is your age? Yes
30 or under No
31-50
Over 50 12. W hich of the following best
describes your personal
6. W hat is your gender? workspace?
Female Enclosed office, private
Male Enclosed office, shared with
other people
Cubicles with high partitions
(about five or more feet high)
Cubicles with low partitions
(lower than five feet high)
W orkspace in open office
with no partitions (just desks)
Other
298
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
299
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
300
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
31. How satisfied are you with the 36. Overall, does the acoustic
amount of light in your quality in your workspace
workspace? enhance or interfere with your
1 Very satisfied ability to get your job done?
2 1 Enhances
3 2
4 3
5 Very dissatisfied 4
5 Interferes
32. How satisfied are you with the
visual comfort of the lighting Cleanliness and Maintenance
(e.g., glare, reflections,
contrast)? 37. How satisfied are you with
1 Very satisfied general cleanliness of the
2 overall building?
3 1 Very satisfied
4 2
5 Very dissatisfied 3
4
33. Overall, does the lighting quality 5 Very dissatisfied
enhance or interfere with your
ability to get your job done? 38. How satisfied are you with
1 Enhances cleaning service provided for
2 your workspace?
3 1 Very satisfied
4 2
5 Interferes 3
4
Acoustic Quality 5 Very dissatisfied
34. How satisfied are you with the
noise level in your workspace? 39. How satisfied are you with
1 Very satisfied general maintenance of the
2 building?
3 1 Very satisfied
4 2
5 Very dissatisfied 3
4
35. How satisfied are you with the 5 Very dissatisfied
sound privacy in your
workspace (ability to have 40. Does the cleanliness and
conversations without your maintenance of this building
neighbours overhearing and enhance or interfere with your
vice versa)? ability to get your job done?
1 Very satisfied 1 Enhances
2 2
3 3
4 4
5 Very dissatisfied 5 Interferes
301
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Unit of Acceptable
Parameter Measure
Measure Range/ Limits
1. Thermal i. Temperature
C 23 – 26
comfort
ii. Relative humidity % 55 – 70
302
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 6
MyCREST Commissioning Flow Chart
303
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
CONSTRUCTION/INSTALLATION
building systems
304
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Implement Result
Measure performance
305
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
APPENDIX 7
MyCREST Calculator Formula
306
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
307
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
I1
I2
I3
I4
I5
I6
I7
I8
I9
10
11
Total AGB (kg) SUM (I1:I11) = SUM 1
Biomass (ton) SUM 1/1000 = SUM 2
Carbon (ton) SUM 2*0.47 = SUM 3
Carbon* Coefficient for open grown tree in city (tonne) SUM 3*0.41 = SUM 4
CO2 sequestration (tonne) SUM 4*44/12
*The diameter of the tr ee is measur ed at 1.5 meter above gr ound level.
308
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Ms = 0.0313*(D2H)0.9733
Mb = 0.136*Ms1.070
Ml = 1/Ml=1/(0.124Ms0.794)+1/125
* cm to inch = 0.3937
309
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
B) GRASS
c) WATER BODIES
310
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
IS-CAL03 & IS-CAL04 URBAN HEAT ISLAND MITIGATION (DESIGN & VERIFICATION)
Type of Planting
Grass, Shrubs and Groundcovers
Shady Trees
For Grass, Shrubs and Groundcovers
Total Grass Area m2
Total Dry Weight (TDW) 0.00 kg
Total Carbon Weight (TCW) 0.00 kg
Carbon Sequestration, tCO2e 0.0000 tCO2e
311
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
Trees
Diameter Total AGB
Height (m) Ms Mb 1/Ml Ml Total AGB (kg
(cm) (kg)/tree
Number of
Trees 1/H=1/(2.0*D)+1/ Ms=0.0313*(D2H)0. Mb=0.136*Ms1. 1/Ml=1/(0.124M Total AGB (kg)/tree
D Ml=1/ML Ms+Mb+Ml
61 9733 070
s0.794)+1/125 *No of trees
I1
I2
I3
I4
I5
I6
I7
I8
I9
10
11
Total AGB (kg) SUM (I1:I11) = SUM 1
Biomass (ton) SUM 1/1000 = SUM 2
Carbon (ton) SUM 2*0.47 = SUM 3
Carbon* Coefficient for open grown tree in city (tonne) SUM 3*0.41 = SUM 4
CO2 sequestration (tonne) SUM 4*44/12
*The diameter of the tr ee is measur ed at 1.5 meter above gr ound level.
312
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
313
M yCREST © 2020 Reference Guide Design and Construction Stage
MyCREST
Malaysian Carbon Reduction and Environmental Sustainability Tool
314
M yCREST © 2020 Reference Guide Design and Construction Stage