LIST OF REQUIRMENTS FOR CFEI

Xerox copy of TCT (titulo ng lupa)/Contract Least/NHA Certification-1copy


Affidavit of lot owner authorizing the use property for New connection,Reconnection,Separation,Relocation,
Xerox copy of Tax Declation for Land &Bldg.-1copy
Xerox copy of Realty Tax Receipt (BAYAD NG AMILYAR)-1copy
Accomplished application for Electrical Permit(DPWH form no.96001-E)with Xerox copy of PRC ID and PTR No
Building Permit (XEROX COPY IF ANY)
Electrical Plans & Specs. (AS BUILT)
Temporary Load Schedule
Barangay Clearance (XEROX)
Old bill or Payment (MERALCO)(XEROX)
Yellow Card
House Picture (front)(Printed)
Occupancy Permit
ction,Separation,Relocation,Remodel the service,duly notarized(PAHINTULOT NG MAY-ARI NG LUPA NA MAY NOTARYO)

ox copy of PRC ID and PTR No.for the current year.


NA MAY NOTARYO)
REQUIRMENTS FOR NET METERING
1.P.V. Solar Electrical Plan(sign by P.E.E)
2.Electrical Design Analysis(Duly sign by P.E.E)
3.Picture (house,solar panel,Inverter,location of R.E.C METER)
4.Electrical Safety certification(sign by P.E.E)
5.Bill of materials(sign by P.E.E)
6.Insulation test (sign by P.E.E)
7.Title (xerox)
8.Tax Declaration (LAND &BLDG)(xerox)
9.Occupancy permit(xerox)
10.Yellow card (xerox)
11.Wiring Permit (Duly Sign by P.E.E/R.E.E)

NOTE: please attach a copy of valid PTR&PRC LICENSE with original SIGN & SEALED of P.E.E or R.E.E
BATELEC II REQUIRMENTS FOR NET METERING
Letter of intent
CFEI /Building Permit for Net Metering
Proof of Ownership
Proof of Billing
Electrical Plan with RE System including Single Line Diagram (3 sets)
Technical Specification of the RE System inverter and panel (3 sets)
For DIS requirments (equipments data sheet)
* Voltage and frequency operating range
* Short Circuit current contribution
* AC output rated capacity
* Typical 24 hour generation profile
* Certification (IEC,IEEE,ect.)
Secretary Certificate (if representing the company)
Special Power of attorney ( SPA) ( if reprecenting the individual applicant)
other supporting documents:
* Application form
* Application for COC
*

*
*
*
*
*

*
*
*
*
*
*
*
APPLICATION FOR NET METERING
Identification Documents
For individuals (Valid ID/s)
For Corporations -SEC Registration,BIR Certificate of Registration,Latest General Information Sheet
Application Form/Letter of Intent
Detailed Planning Data(Single Line Diagram)
Equipment Certification(For PV and Inverter
Equipment Data sheet
Certificate of Compliance(COC) form 1
Certificate of Compliance(COC) form 2-(if applicable,for non-individual application)
Secretary Certificate-(if applicable,for non-individual applications)
Plant Parameters Form
Location Sketch
Meralco bill(as reference)
Certificate of Final Electrical Inspection(CFEI)
Difference in Meter Cost Fee (to be determined during application)
Photo of Service Entrance
LIST OF REQUIRMENTS FOR NET METERING
1.Solar Panel Installation Plan (Signed and Sealed)
2.Electrical Wiring Permit Form (Signed and Sealed)
3.As Built Electrical Plan w/ Electrical Analysis ( signed and Sealed)
4.PRC ID AND PTR (Signed ans Sealed)
5.Land Title(Certified True Copy)
6.Certified True Copy of Tax Declaration
7.Certified True Copy of Tax Clearance
8.Certified True Copy of Certificate of Occupancy
9.Authorization Letter of Lot Owner
10.Barangay Clearance
NET METERING REQUIRMENTS
A.YELLOW CARD FROM MERALCO
B.BARANGAY CLEARANCE
C.DULY ACCOMPLISHED ELECTRICAL PERMIT FORM(SIGNED AND SEALED)
D.PROOF OF OWNERSHIP(ANY OF THE FOLLOWING)
*TITLE
*DEED OF SALE
*UNDERTAKING/ADJUDICATION
E.SOLAR SPECIFICATIONS/LOAD SCHEDULE(PLAN)
F.HOUSE PHOTO ,SERVICE ENTRACE
REQUIRMENTS FOR NET METERING
1.DULY ACCOMPLISHED ELECTRICAL FORM,SIGNED AND SEALED BY P.E.E
2.SOLAR PANEL INSTALLATION PLANS,SIGNED AND SEALED BY P.E.E
3.PHOTOCOPY OF LICENSE AND PTR OF SIGNING P.E.E
LIST OF REQUIRMENTS:WIRING PERMIT & CEI
1.Yellow Card from Meralco(xerox)
2.Proof of Ownership
a.)Copy of title (ctc)
b.)Contract to sell
c.)Deed of sale
d.) SLD
3.Valid I.D(owner)
4.Building Permit/Occupancy(if applicable)
5.Undertaking (if applicable)
Authorization letter w/ valid ID (for representative)

Here is the initial list of requirments for your net metering application(MERALCO)
1.Identification Document
2.Copy of Statement of account (Meralco bill)
3.Certification of RE Equipment and brochures of the Renewable Energy and inverter to be used
4.Certificate of Compliance(COC) Form 1-downloadable in the website of ERC
5.Plant Parameters Form - attached in this e-mail
6.Updated list of Electrical Loads + Single Line Diagram including the connection of the renewable Energy