Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Greater Visakhapatnam Municipal Corporation (GVMC)

Greater Visakhapatnam Smart City Corporation Limited (GVSCCL)


Project: Multi-Level Semi-Automatic Car
Parking at Jagadamba junction under Smart
Cities Mission.
Project Cost: Rs. 11.45 Cr
PMC: AECOM Asia Company Ltd.
Agency: M/s. Affordable Robotic and
Automation Ltd., Pune

HIGHLIGHTS OF THE PROJECT

o Constructed area - 367.89 Sqm.


o Can accommodate 100 Cars with
ticketing system for public use.
o Decongestion of traffic and reduction of
street parking.
o Maximum vehicle retrieving time 90
seconds.
o Providing safe, secure and efficient
vehicular circulation / passage.

You might also like