The most important activities at the department is the covering of clinker at Razel. There casuals
worker are assigned of the uncovering and covering of clinker, recycle of cement at the 84BC02.
At the 83BC02 casuals are involved in the extraction of cement stones at the conveyor bell
At the DPC of the 66 line handymen are assign of recycling, spell clinker on the conveyor belt.
P.p : Most of times as well the handymen are line helper on where they establish the lubrification of
the autopacker with the help of diesel, in the same way they also supervised the arrangement
cement bags on the waitiing track they do so in case of there can less or more cement loaded on the
truck.
JETTY
At this department, the ship is in charge of delivring clinker at the hopper, and they handymen
cleaners act as recycler of at 66BC02 fall.
HSE
During this month, the handymen were in the changing of tyre of the fire fighting truck, desinfecting
of the HSE office, cleaning of green spaces and same of them were sent at the store.
STORE
This department is in charge of delivering empty cement bags for the packing plant using the robot
plat-form.
HSE TRANSPORT
At the living erea mainly at the HSE Transport department, the were incharge of housekeeping of the
environment
ELECTRICAL DEPARTMENT
At this department, 02 casuals workers were ordered by M. LAZARIUS for the duration of 07 days and
their task consisted of removed , deherbage, entassage and picking. And for this, JSA and work
parmit took place.
CIVIL ENGINEERING
This month, they were in charge of removing slabs in order to clean gutters
MECANICAL