Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

• 1C – Proved contingent resources

• 1oo2 – One out of two voting (instrumentation)


• 1P – Proven reserves
• 2C – Proved and probable contingent resources
• 2D – two-dimensional (geophysics)
• 2oo2 – Two out of two voting (instrumentation)
• 2oo3 – Two out of three voting (instrumentation)
• 2P – proved and probable reserves
• 3C – three components seismic acquisition (x, y, and z)
• 3C – Proved, probable and possible contingent resources
• 3D – three-dimensional (geophysics)
• 3P – proved, probable and possible reserves
• 4D – multiple 3Ds acquired over time (the 4th D) over the same area with the same
parameters (geophysics)
• 8rd – eight round (describes the number of revolutions per inch of pipe thread)
• A – Appraisal (well)
• AADE – American Association of Drilling Engineers[1]
• AAPG – American Association of Petroleum Geologists[2]
• AAPL – American Association of Professional Landmen
• AAODC – American Association of Oilwell Drilling Contractors (obsolete; superseded
by IADC)
• AAV – Annulus access valve
• ABAN – Abandonment, (also as AB and ABD and ABND)
• ABSA – Alberta Boilers Safety Association
• ABT – Annulus bore test
• ACC – Air-cooled heat condenser
• ACHE – Air-cooled heat exchanger
• ACOU – Acoustic
• ACP – Alkali-cosolvent-polymer
• ACQU – Acquisition log
• ACV – Automatic control valve
• ADE – Advanced decision-making environment
• ADEP – Awaiting development with exploration potential, referring to an asset
• ADROC – advanced rock properties report
• ADT – Applied drilling technology, ADT log
• ADM – Advanced diagnostics module (fieldbus)
• AER – Auto excitation regulator
• AEMO – Australian Energy Market Operator
• AFE – Authorization for expenditure, a process of submitting a business proposal to
investors
• AFP – Active rire protection
• AGA – American Gas Association
• AGRU – acid gas removal unit
• AGT – (1) agitator, used in drilling
• AGT – (2) authorised gas tester (certified by OPITTO)
• AGT – (3) Azerbaijan – Georgia – Turkey (a region rich in oil related activity)[3]
• AHBDF – along hole (depth) below Derrick floor
• AHD – along hole depth
• AHU – air handling unit
• AICD – autonomous inflow control device
• AIChemE – American Institute of Chemi
• This pdf contains 77 electrical inspection checklists taken from the 2014 Electrical
Inspection Manual with
• Checklists. The checklists are in PDF format and can be completed electronically or
printed and used as hard copy.
• The checklists are intended to help inspectors keep track of the numerous aspects of an
electrical installation
• that must be checked, verified, reviewed, determined, or otherwise examined for NEC
→ compliance. The checklists

• are also intended to serve as an organizational tool for contractors, project managers, or
anyone who conducts,
• receives, or is responsible for electrical inspections, or who may wish to perform self-
inspections, of electrical
• installations.
• The checklists are organized as follows:
• • Chapter 1: Introduction
• — Checklist 1-1: General Safety Checklist for Electrical Inspections
• • Chapter 2: General Requirements Inspections
• — Checklist 2-1: General Requirements for Electrical Inspections
• • Chapter 3: Wiring Methods and Devices
• — Checklist 3-1: General Wiring Methods
• — Checklist 3-2: Boxes and Conduit Bodies
• — Checklist 3-3: Cabinets and Cutout Boxes
• — Checklist 3-4: Switches and Receptacles
• • Chapter 4: Services, Feeders, and Branch Circuits
• — Checklist 4-1: Services
• — Checklist 4-2: Feeders
• — Checklist 4-3: Branch Circuits
• • Chapter 5: Grounding and Bonding
• — Checklist 5-1: Service Grounding and Bonding
• — Checklist 5-2: Equipment Grounding and Bonding
• • Chapter 6: Dwelling Units and Mobile/Manufactured Home Sites
• — Checklist 6-1: Residential Rough Inspection: General Requirements (All Areas)
• — Checklist 6-2: Residential Rough Inspection: Kitchen
• — Checklist 6-3: Residential Rough Inspection: Dining Room
• — Checklist 6-4: Residential Rough Inspection: Bathrooms
• — Checklist 6-5: Residential Rough Inspection: Other Habitable Rooms
• (Bedrooms, Family Rooms, Parlors, and Dens)
• — Checklist 6-6: Residential Rough Inspection: Hallways and Foyers
• — Checklist 6-7: Residential Rough Inspection: Stairways
• — Checklist 6-8: Residential Rough Inspection: Closets
• — Checklist 6-9: Residential Rough Inspection: Laundry Area
• — Checklist 6-10: Residential Rough Inspection: Basements and Attics
• — Checklist 6-11: Residential Rough Inspection: Attached Garages and Detached Garages or
• Accessory Buildings With Electric Power
• — Checklist 6-12: Residential Rough Inspection: Outdoors
• — Checklist 6-13: Residential Rough Inspection: Services and Feeders and System
Grounding
• — Checklist 6-14: Residential Rough Inspection: Feeders and Panelboards
• Copyright © 2015 by Jones & Bartlett Learning, LLC, an Ascend Learning Company
• Electrical Inspection Manual Checklists
• — Checklist 6-15: Residential Finish Inspection: General Requirements (All Areas)
• — Checklist 6-16: Residential Finish Inspection: Kitchen
• — Checklist 6-17: Residential Finish Inspection: Dining Room
• — Checklist 6-18: Residential Finish Inspection: Bathrooms
• — Checklist 6-19: Residential Finish Inspection: Other Habitable Rooms
• (Bedrooms, Family Rooms, Parlors, and Dens)
• — Checklist 6-20: Residential Finish Inspection: Hallways and Foyers
• — Checklist 6-21: Residential Finish Inspection: Stairways
• — Checklist 6-22: Residential Finish Inspection: Closets
• — Checklist 6-23: Residential Finish Inspection: Laundry Area
• — Checklist 6-24: Residential Finish Inspection: Basements and Attics
• — Checklist 6-25: Residential Finish Inspection: Attached Garages and Detached Garages or
Accessory Buildings
• With Electric Power
• — Checklist 6-26: Residential Finish Inspection: Outdoors
• — Checklist 6-27: Residential Finish Inspection: Service Equipment, Feeders, and
Panelboards
• — Checklist 6-28: Residential Finish Inspection: Mobile/Manufactured Home Site
Inspections
• • Chapter 7: Commercial and Industrial Inspections
• — Checklist 7-1: Motors
• — Checklist 7-2: Air-Conditioning and Refrigerating Equipment
• — Checklist 7-3: Transformers
• — Checklist 7-4: Capacitors
• — Checklist 7-5: Elevators, Dumbwaiters, Escalators, Platform Lifts, and Stairway Chairlifts
• — Checklist 7-6: Electric-Vehicle-Charging Equipment
• — Checklist 7-7: Signs and Outline Lighting
• — Checklist 7-8: Field-Installed Skeleton Tubing (Neon) and Wiring
• • Chapter 8: Hazardous Locations
• — Checklist 8-1: Class I Locations
• — Checklist 8-2: Class II Locations
• — Checklist 8-3: Class III Locations
• — Checklist 8-4: Commercial Garages
• — Checklist 8-5: Aircraft Hangars
• — Checklist 8-6: Motor Fuel-Dispensing Facilities
• — Checklist 8-7: Bulk Storage Plants
• — Checklist 8-8: Spray Application, Dipping, and Coating Processes
• • Chapter 9: Special Occupancies
• — Checklist 9-1: Health Care Facilities
• — Checklist 9-2: Assembly Occupancies
• — Checklist 9-3: Theaters and Audience Areas of Motion Picture Studios
• — Checklist 9-4: Carnivals, Circuses, Fairs, and Similar Events
• — Checklist 9-5: Agricultural Buildings
• — Checklist 9-6: Recreational Vehicle Parks
• — Checklist 9-7: Marinas and Boatyards
• • Chapter 10: Swimming Pools and Related Installations
• — Checklist 10-1: Initial Inspection: Prior to Pouring of Concrete or Burial
• — Checklist 10-2: Intermediate and Final Inspections
• — Checklist 10-3: Storable Swimming Pools and Storable Spas and Hot Tubs
• — Checklist 10-4: Spas and Hot Tubs: All Installations
• — Checklist 10-5: Spas and Hot Tubs: Indoor Installations Only
• — Checklist 10-6: Fountains
• — Checklist 10-7: Therapeutic Pools and Tubs
• — Checklist 10-8: Hydromassage Bathtubs
• Copyright © 2015 by Jones & Bartlett Learning, LLC, an Ascend Learning Company
• Electrical Inspection Manual Checklists
• • Chapter 11: Emergency and Standby Systems and Fire Pumps
• — Checklist 11-1: Emergency Systems
• — Checklist 11-2: Legally Required Standby Systems
• — Checklist 11-3: Optional Standby Systems
• — Checklist 11-4: Fire Pumps
• • Chapter 12: Remote-Control, Signaling, and Fire Alarm Circuits and Optical Fiber Cables
• — Checklist 12-1: Class 1, Class 2, Class 3, Remote-Control, Signaling, and Power-Limited
Circuits
• — Checklist 12-2: Fire Alarm Systems
• — Checklist 12-3: Optical Fiber Cables and Raceways
Click on the Document Title to go to that section of the document
Table of Contents
Document Number Rev. Document Title Page
Number
B115-060-16-50-DS-
4025
A DATA SHEET FOR CABLE 492
B115-060-16-51-SP-
4010.
D1 INSTRUMENTATION JOB SPECIFICATIONS FOR 494
B115-060-16-51-DS-
0001
A DATA SHEET 519
B115-060-80-43-VL-
4010
B Vendor list (S&ME) 534
B115-060-16-51-SK-
3002
0 DRAWING 542
B115-060-YE-IOF-
4010
B I/O Count for membrane system 543
B115-060-16-51-SK-
3202
B1 DRAWING 545
B115-000-16-54-DB-
0001
0 SITE SPECIFIC SEISMIC SPECTRA 546
6-44-0012 4 Standard specification for fabrication and erection of piping 552
6-44-0013 4 Standard specification for inspection, flushing and testing of piping
systems.
567
6-44-0015 1 Piping Specification for package units 576
6-44-0018 0 Standard specification for fabrication of piping spools 582
6-44-0051 6 Technical notes for pipes. 591
6-44-0052 7 Technical notes for valves. 601
6-44-0053 6 Technical notes for flanges, spectacle blinds and drip rings. 621
6-44-0054 6 Technical notes for butt welded, socket welded and screwed
fittings.
628
6-44-0056 4 Technical notes for gaskets. 637
6-44-0057 4 Technical notes for bolts and nuts. 642
6-44-0067 1 Technical notes for strainers 647
6-44-0068 1 Technical notes for sample coolers 656
6-44-0070 1 Technical notes for spring support assemblies 661
6-51-0006 5 Specification for flameproof control stations. 669
6-51-0051 8 Specification for medium and high voltage cables & accessories. 676
6-51-0064 1 Specification for energy efficient medium voltage induction motors 686
6-51-0082 5 Specification for cable installation. 698
6-51-0084 4 Specifications for earthing installation. 709
6-51-0087 3 Specification for field inspection, testing and commissioning of
electrical installations
716
6-51-0093 5 Specification for electrics of package equipment. 724
6-52-0002 4 Standard specification for electromagnetic flowmeters. 734
6-52-0004 4 Std. Spec. for orifice plates and flanges 744
6-52-0031 4 Standard specification for control valves. 751
6-52-0037 2 Standard specification for on-off valves 774
6-52-0040 2 Standard specification for programmable logic controllers. 794
6-52-0046 7 Standard specification for signal cables. 830
6-52-0052 3 Standard specification for instrumentation of package units. 838
6-52-0071 2 Standard spec. for special level instruments. 912
6-76-0002 2 Standard specification for application of torque and hydraulic bolt
tension for flange joints
926
6-78-0001 1 Specification for quality management system requirements from
bidders
959
6-78-0002 1 Specification for documentation requirement from contractors 966
Page 3 of 1296
Click on the Document Title to go to that section of the document
Table of Contents
Document Number Rev. Document Title Page
Number
6-78-0003 1 Specification for documentation requirement from suppliers 975
6-81-1006 3 ITP for flameproof control stations 984
6-81-1032 5 ITP for MV motors 989
6-81-1051 3 ITP for MV & HV cables & accessories 995
6-82-0002 3 Standard specification for positive material identification (PMI) at
construction sites
1001
6-82-0003 2 Standard specification for colour coding of piping material 1010
7-44-0350 4 Vent & drains (on lines 1 1/2" & below). 1022
7-44-0351 4 Vents and drains (on lines 2 and above). 1023
7-44-0352 4 Orientation of orifice taps (class 600 & below. 1024
7-44-0353 4 Wells installation 1 1/2" dia taps (up to class 600). 1026
7-44-0354 4 Pressure tappings (PA, PG, PC, PT, PIC etc). 1028
7-51-0116 7 Equipment earthing schedule. 1029
7-52-0001 4 Instrument connection on vessel, standpipes and tanks. 1030
7-52-0002 4 Instrument connection on pipes. 1034
7-52-0035 3 Thermowell. 1037
7-52-0036 4 Thermocouple / RTD assembly with thermowell. 1040
7-52-0041 4 Orifice plates and flanges dimensional details. 1041
7-52-0101 3 Instrument support single instrument 1055
7-52-0102 3 Instrument support two instruments 1058
7-52-0104 3 Support details for junction boxes 1061
7-52-0105 3 Fabricated canopy for instruments 1062
7-52-0107 3 Perforated tray supports & cables clamping details 1063
7-52-0202 5 Tubing hook-up control valve with pressure gauge. 1064
7-52-0207 5 Tubing hook-up control valve with solenoid valve. 1065
7-52-0212 1 Tubing hook-up control valve with smart positioner 1066
7-52-0406 5 Flow instrument DP type liquid & cond. vapour service integral
manifold meter below
1067
7-52-0407 5 Flow instrument DP type liquid service integral manifold meter
above.
1068
7-52-0408 5 Flow instrument DP type dry gas service integral manifold meter
below.
1069
7-52-0410 5 Flow instrument DP type dry gas service integral manifold meter
above.
1070
7-52-0430 0 Pressure Gauge Liquid / Gas Services High Pressure 1071
7-52-0432 5 Pressure gauge liquid/gas service. 1072
7-52-0433 5 Pressure gauge steam service. 1073
7-52-0437 5 Pressure instrument liquid & cond. vapour service meter below. 1074
7-52-0438 5 Pressure instrument liquid & cond. vapour service meter above. 1075
7-52-0439 5 Pressure instrument dry gas service meter below. 1076
7-52-0440 0 Pressure Instrument (Pressure Transmitter & Pressure Gauge)
Diaphragm Seal Type-Vessel Mounted
1077
7-52-0441 5 Pressure instrument gas service meter above. 1078
7-52-0447 3 Pressure instrument gas service (on vessel) meter below. 1079
7-52-0448 3 Pressure instrument gas service (on vessel) meter above. 1080
7-52-0452 5 Differential pressure instrument DP - type meter below. 1081
7-52-0468 5 Level instrument diaphragm seal type. 1082
7-52-0469 6 Level / diff. press. instrument DP type on vessel meter below. 1083
7-52-0473 5 Level instrument- DP type on standpipe meter below. 1084
• 7-52-0475 0 Level Instrument Guided Wave Radar on Vessel /

You might also like