4 Shift cross bracing as marked ( Roof bracing line to be match.) Its Done
.
5 wind load are applied along grid C & 15, It should be removed. its done
I.E. Wind load is not applicable at internal locations.
6 Ref. observation given in Load calculation sheets. Its Done as per discussion
We observed, along grid 16 rafter actracting higher moment as Its was due to the additional load due to
8 compared to frames along grid 17,18,19. but Load are same. collateral load assigned twice. Its its removed
Kindly confirm and things are is order
Two times pipe rack Load is applied on structure, one is dead We have taken Self Weight and Pipe rack load
10
load & another is in collateral load. Seperatly.