1
Wellhead/Christmas Tree
2
Cellar Pit
3
Downhole completion
1
1 1. 30” conductor
2 2. Conductor setting depth
3 3. 20” surface casing
4 4. 20” shoe
5. Cement
5
6. Formation open to C annulus
6 7. 13 3/8” casing
7 8. Formation open to B annulus
8 9. 9 5/8” production casing
9 10. Liner hanger
10
11. 7” Liner
12. TD – Total Depth
11
12 5
Summary of Well Construction
6
Summary of Well Construction
weld
7
Well Head Assembly
8
Conventional Wellhead and
Christmas Tree Assembly
Section D
Production Tree
Section C
Tubing Spool
Section B
Casing Spool
Section A
Casing Head with
Landing Base 9
Mono-block tree
10
Wellhead Main Functions
• Casing/Tubing suspension.
• Pressure sealing and isolation between casing at surface when many casing
strings are used.
• Provides a means of attaching a blowout preventer during drilling.
• Provides a means of attaching a Christmas tree for production operations.
• Provides a reliable means of well access. (Tubing Head)
• Provides a mean of attaching a well pump. (Artificial Lift)
• Provides pressure monitoring and pumping access to annuli between the
different casing/tubing strings.
11
12
Wellhead Classification
13
Component Requirements Applicable To All Wellheads
14
Component Requirements Applicable To All Wellheads
• Elevated temperature operations span -18 to 345⁰C in 2 ranges (X, Y). Y has
the highest temperature rating
Product Service Level (PSL) defines the degree of testing applied to the wellhead
component
– PSL-1 is the baseline. PSL :Product Specification Level
– PSL-2, PSL-3, PSL-3G, and PSL-4 include additional and ever more stringent
requirements to confirm component suitability for challenging operations (e.g.
high pressure, elevated temperature, sour)
15
Basic Components Of A Wellhead
• Casing Head (Housing)
• Casing Hanger
• Casing Spool
• Annulus Seals
• Tubing Head Spool
• Tubing Hanger
• Tubing Adaptor
16
Casing Head (Housing)
17
Casing Head (Housing)
• The lowest part of the wellhead that is almost
always connected to the surface casing string, and
provides a means of suspending and packing off
the next casing string.
• The starting casing head attaches to the surface
casing by either welding or threading on to the
surface casing.
• The top of the starting casing head has a flange to
mate with the bottom of the BOP.
• The flange must meet both size and pressure
requirements.
• The starting casing head has a profile located in
the inside diameter (ID) that will accept a slip-and-
seal assembly to land and support the next string
of casing.
• The slip-and-seal assembly transfers all of the
casing weight to the surface casing while
energizing a weight-set elastomeric seal.
18
Casing Head (Housing)
19
Casing Head Components
20
Casing Head (Housing)
• Casing head is the primary interface for the surface pressure control equipment, for
example blowout preventers (while drilling) or the Christmas tree (while production).
• Casing Head has a straight bore bowl with 45°landing shoulder design which avoids
damage to sealing areas by drilling tools and prevents test plug and bowl protector.
• Most casing heads allow for the pressure readings to be taken on the annulus and
provide the means to pump out or into if necessary.
• Casing Head provided are normally furnished with threaded outlets and studded outlets
and also can be manufactured by request.
21
Casing Head (Housing)
22
Casing Head (Housing)
Material Class AA / BB / CC / DD / EE / FF / HH
23
Casing Head (Housing)
Pressure testing:
• A pressure test must be carried out using hydraulic oil after cooling of the
base flange.
• Do not exceed 70% of API casing collapse pressure rating.
• During this test, no sweating should occur.
• Upon completion of the test, install a wellhead protection cap to prevent
objects accidentally falling into the wellbore.
• Re-install the 3/4” NPT plug in the test port.
24
25
Casing Spools
26
Casing Spool Components
27
Casing Spool
• The bottom prep of the spool has been engineered to contain a pack off
seal and flange for either a clamp-hub or a standard flange connection.
• It also provides a seal in the bottom bowl to pack off the previous
casing string and isolate the ID seals from internal casing pressure.
28
Casing Spool
29
Casing Spool Features
30
Casing Hangers
• Casing hangers are devices that allow casing to be set in the
well bore during the drilling phase of an oil or gas well.
• There are two basic designs of casing hanger:
Slip-Type
Mandrel.
• The slip-type is the conventional and most commonly used.
• The mandrel-type is normally used when special needs
arise during drilling of the well.
• Both allow for the Tens of Thousands of pounds in weight of
the casing string weight to be transferred from the derrick of
the drilling rig to the load shoulder in a casing head or spool.
31
Casing Hangers
• A Casing Hanger performs the following functions:
• Suspends the casing load
• Transfers casing weight
• Centers casing
• Provides a primary seal in the casing annulus
• Creates an annular space
• Allows for testing of connections
32
Casing Hanger
Casing Hanger (Load-carrying components)
• It is that portion of a wellhead assembly which provides support for the casing
string when it is lowered into the wellbore.
• It serves to ensure that the casing is properly located. When the casing string
has been run into the wellbore it is hung off, or suspended, by a casing
hanger, which rests on a landing shoulder inside the casing head or casing
spool.
• Casing hangers must be designed to take the full weight of the casing, and
provide a seal between the casing hanger and the spool.
• Has a sealing device to isolate the casing annulus from upper wellhead
components
33
Casing Hangers
Casing weight is transferred to the starting casing
head and intermediate spools with two different
types of hanger systems:
A Slip-and-Seal Casing-Hanger Assembly.
A Mandrel-Style Casing Hanger.
Casing
Hanger
Slips
Casing
head
Bowl
20” casing
Casing hanger
13 3/8” casing
36
Slip Casing Hanger Components
37
Tubing Head introduction
• Tubing head is a body with two flange that can supports the tubing string on
a oil well, seals off the pressure between the casing and tubing annulus, and
connect with tubing adapter on the top.
• Tubing Heads &tubing spool are a straight bore bowl with 45° landing
shoulder design which avoids damage to sealing areas by drilling tools, and
provides wedging of the tubing hangers, bowl protectors and test plugs.
Main Parameters:
• Working pressure: 2000-15,000PSI
• Working medium: oil, natural gas, mud etc.
• Working temperature: -46℃ - 121℃(Class LU)
• Material class: AA、BB、CC、DD、EE、FF
• Specification level: PSL1-4
• Performance level: PR1
38
Tubing Heads Spool
• The Tubing Head Spool is the top spool on a surface wellhead. It is typically installed over the
last string of pipe suspended in the well, the production casing.
• It allows for suspending the production tubing in the wellbore.
• Provides a seal bore for the Tubing Hanger.
• Incorporates Lock Down Screws to retain the Tubing Hanger and energize its seals in the seal
bore.
• Supports the blowout preventers (i.e. “BOP’s”) while drilling.
• Provides outlets for fluid returns.
• Provides a means to test the blowout preventers while drilling.
• Has a seal area in the bottom flange for a secondary seal between the casing annulus and the
flanged connection.
• Utilize a test port in the bottom flange that allows for the secondary seal and the flanged
connection to be pressure tested
39
Tubing Head Spool
40
Tubing Head Spool
41
TUBING HANGER
Functions
The tubing hanger fulfils several different tasks in the completion
string:
It transfers the weight of the completion string to the wellhead.
It seals the top of the production annulus (this is a barrier function,
i.e. it prevents pressure in the annulus from leaking past the tubing
hanger to the Xmas tree or out to the atmosphere or the sea, or
vice-versa).
It allows an internal plug to be installed.
It provides a seal around hydraulic and electrical control lines which
have been “drawn” through the tubing hanger.
42
Tubing Hanger
43
Tubing Hangers
44
Tubing Hanger Components
45
Functions Of Tubing
Hangers
The tubing with a production packer and 0-Rings
completion accessories are run inside the
production casing. BPV Threads
Tubing Spool 46