718255309.

xls 01/09/2024 14:35:42 1/2

DESIGN OF WELDED CONNECTION BETWEEN C-CHANNEL AND RHS BEAM

DESIGN NOMINAL REACTIONS (Beam 19 Node 21)


Horizontal force along x- Fx = 3870.00 N ; Refer to STAAD output
Horizontal force along z- Fz = 2.00 N ; Refer to STAAD output
Vertical force along y-axi Fy = 1174.00 N ; Refer to STAAD output
Moment about x-axis Mx = 1.00 N-m ; Refer to STAAD output
Moment about y-axis My = 4.00 N-m ; Refer to STAAD output
Moment about z-axis Mz = 2968.00 N-m ; Refer to STAAD output

CHECK STRENGTH OF WELD

Total length of welds WL = 592.00 mm


Length of weld along z-ax Lz = 0.00 mm
Length of weld along y-ax Ly = 304.00 mm

Centroid of welds X = 76
y = 13

Moment of inertia of weld Iz = 585301.33 mm^3


Moment of inertia of weld Iy = 51376.00 mm^3
Moment of inertia of weld Ix = 636677.33 mm^3 ; Iz + Iy

Load on weld dueto force Fx fx = 6.54 N/mm ; Fx / WL


Load on weld due to force Fz fz = 0.00 N/mm ; Fz / WL
718255309.xls 01/09/2024 14:35:42 2/2

Load on weld due to force Fy fy = 1.98 N/mm ; Fy / WL


Load on weld due to Mx fx1 = 0.12 N/mm
Load on weld due to Mz fz1 = 385.39 N/mm
Load on weld due to My fy1 = 1.01 N/mm

Resultant Load on weld Rv = 386.41 N/mm ;[(fz1 +fy1+fx)2 + (fz)2 + (fy)2 + (fx1)2]1/2

Using 8 mm thk fillet weld


Strength of weld R = 1244.32 N/mm ; 0.70*6*220

if ( R > Rv, SAFE, FAIL ) = SAFE