TO: From:
ABB ELDS Bac Ninh Factory
No.1 Road TS-23, Tien Son Industrial Zone
16 0000, Bac Ninh Province, Vietnam
Quotation*
Project Name: Hai Phong 1-5
This ABB budgetary offer is preliminary and not final and as such non-binding. It is tendered for
discussion only, does not constitute a term to contract and ABB can, without notice, make any change in
ABB’s own discretion.
This quotation is in accordance with the ABB GENERAL TERMS AND CONDITIONS
In case of any discrepancy between the provisions of this offer and the foregoing conditions the provision
of this offer shall prevail.
Page 1 of 3
Quotation Number: OPP-20-xxx
Quotation Date: 23-Oct-20 Revision: R0
TO: From:
ABB ELDS Bac Ninh Factory
No.1 Road TS-23, Tien Son Industrial Zone
16 0000, Bac Ninh Province, Vietnam
Quotation*
Project Name: Hai Phong 1-5
This ABB budgetary offer is preliminary and not final and as such non-binding. It is tendered for
discussion only, does not constitute a term to contract and ABB can, without notice, make any change in
ABB’s own discretion.
This quotation is in accordance with the ABB GENERAL TERMS AND CONDITIONS
In case of any discrepancy between the provisions of this offer and the foregoing conditions the provision
of this offer shall prevail.
* The present Quotation is valid only for this project and number of units specified in the table above, as well
as the scope given in appendix (appendices) hereto
Page 2 of 3
Quotation Number: OPP-20-xxx
Quotation Date: 23-Oct-20 Revision: R0
TO: From:
ABB ELDS Bac Ninh Factory
No.1 Road TS-23, Tien Son Industrial Zone
16 0000, Bac Ninh Province, Vietnam
Quotation*
Project Name: Hai Phong 1-5
This ABB budgetary offer is preliminary and not final and as such non-binding. It is tendered for
discussion only, does not constitute a term to contract and ABB can, without notice, make any change in
ABB’s own discretion.
This quotation is in accordance with the ABB GENERAL TERMS AND CONDITIONS
In case of any discrepancy between the provisions of this offer and the foregoing conditions the provision
of this offer shall prevail.
Page 3 of 3