Infra Meeting Presentation-April 2023
Infra Meeting Presentation-April 2023
GROUP
MANAGING DIRECTOR
IR. TAN CHEE KIAN
ALL ESTATE
OPERATION MANAGER
GAVIN LIM
ASSISTANT MANAGER
INFRASTRUCTURE
SHURIYAN TAN AH CHIANG
SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SENIOR EXECUTIVE
KB 1/ PB KB 2 / KB 3 LPM SA MOHAMAD HANIF
SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR
SENIOR CLERK KHAIRUL HAZLIN WAN ARIEF AMIR AMRI HEW KON SANG MAINTENANCE CLERK
KB 1/ PB KB 2 / KB 3 LPM
ZARINA BT CHE OMAR VACANT
SENIOR CLERK KHAIRUL HAZLIN WAN ARIEF AMIR AMRI
SITE SUPERVISOR
MOHAMAD ZANZUKI
Total
Machine No of Dedicated Utilisation
Utilisation
Type Units (Hours) (Hours)
(%)
Bulldozer, 366
Backhoe 7 1456 1548 106%
Grader (MMG),
602
Grader
3 624 602 96%
Excavator, 706 (MMG)
Bulldozer, 84 Total
Machine No of Dedicated Utilisation
Utilisation
Type Units (Hours) (Hours)
(%)
KUALA BETIS 1 (KB1) WORKING HOURS KUALA BETIS 2 (KB2) WORKING HOURS
400
250 250
363
350
300 200
184
250 247
TOTAL HOURS
222 150 136
TOTAL HOURS
200 174
150 100
100
50
50 0
0 0
BACKHOE GRADER EXCAVATOR BULDOZER BACKHOE GRADER EXCAVATOR BULDOZER
2 UNITS 2 UNITS 1 UNIT 1 UNIT 3 UNITS 1 UNIT 1 UNIT
(RENTAL UNIT)
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 78
KUALA BETIS 3 (KB3) WORKING HOURS POS BLAU (PB) WORKING HOURS
250 250
231 232
223
200 200
150 150
TOTAL HOURS
TOTAL HOURS
100 100
50 50
18
8
0 0 0
0 0
BACKHOE GRADER EXCAVATOR BULDOZER BACKHOE GRADER EXCAVATOR BULDOZER
1 UNIT 1 UNIT 1 UNIT
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 89
500 2500
472
450
2072
400 2000
350
300 1500
TOTAL HOURS
TOTAL HOURS
200 1000
780
150
100 500
252
50 0 68 84
0 0
BACKHOE GRADER EXCAVATOR BULDOZER BACKHOE EXCAVATOR COMPACTOR BULDOZER LORRY
2 UNITS 1 UNIT 1 UNIT
2 UNITS 3 UNITS 1 UNIT 1 UNIT 9 UNITS
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 1010
1. Distributing EFB 1. Culvert Installation 1. Assist stuck tractor 1. Support heavy machines 1. Breakdown
2. Transporting Decanter 2. Help move ffb to higher
2. Road opening 2. Terracing/Stacking 2. Weather Condition
Cake ground.
3. Land Corrosion Repair 3. Digging sump 3. Support tractor breakdown 3. Clearing new road 3. Standby for FFB
4. Arranging bunds along
4. Culvert Cleaning 4. Assist tractor loading 4. Under servicing
road
5. Transporting Sludge Cake
24 24
56
6 4 23
16
109 72
165
113
76
10
8
KB1 KB3 SA
HE26 SHE01 SHE02
Breakdown/
Machine Off/No Total
Estate Road Work Maintenance FFB Support Project Standby Under
Operator Backup (Hours)
Maintenance
KB1 (HE26) 10 165 0 0 16 0 56 247
KB3 ( SHE01) 8 76 0 109 6 0 24 223
SA (SHE02) 113 72 0 0 23 4 24 236
Grand Total 131 313 0 109 45 4 104 706
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 13
14
24 24 4 24
4 24
8
21 13 15
16 8
24 29
176 18 8
112
171
119 108
18
160
134
84
160 158
30
8
68 76
38 20
10
LPM LPM LPM LPM LPM LPM LPM
BZ01 SVR01 HE08 HE09 HE21 SBH04 SBH07
Breakdown/
Machine Off/No Total
Estate Road Work Maintenance FFB Support Project Standby Under
Operator Backup (Hours)
Maintenance
BZ01 0 0 0 84 0 0 0 84
SVR01 68 0 0 160 0 0 24 252
HE08 38 0 0 160 16 14 40 268
HE09 10 20 0 158 0 10 56 254
HE21 76 0 0 134 0 0 48 258
SBH04 30 22 0 0 0 0 0 52
SBH07 0 8 0 0 0 8 0 16
Grand Total 222 50 0 696 16 32 168 1184
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 916
LPM 168
LPM 40 174
LPM 214
LPM 68 5 85
LPM 226
LPM 60 50 146
LPM 132 20 16 24
LPM 176 24 24
LPM 196 16
Type Of Work VAN 5767 VAS 8658 BKM 3943 VAD 6186 VAS 8692 VAH 2082 VAQ 9217 VAN 5765 VDA 8011 Grand Total
Road Work 0 0 0 60 0 68 0 40 0 168
EFB/Boiler Ash Transfer 196 176 132 50 226 5 0 0 0 785
LPM/LPG Support 0 0 0 0 0 0 0 0 0 0
Project 0 0 20 146 0 85 214 174 168 807
Standby 0 0 0 0 0 0 0 0 0 0
Breakdown/
0 24 16 0 0 0 0 0 0 48
Under Maintenance
No Operator/
16 24 24 0 0 0 0 0 0 64
Machine Offwork
Total (Hours) 212 224 192 256 226 158 214 214 168 2072
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 16
17
MACHINE/
KB1 KB2 KB3 PB SA TOTAL
LORRY
SA
28% BACKHOE 18,674.52 13,695.33 12,787.76 12,859.12 25,323.58 83,340.31
KB1
30%
GRADER 12,788.58 8,161.44 1,080.19 - 12,263.50 34,293.71
PB
6% KB2
KB3 19% EXCAVATOR 13,560.50 - 21,032.64 - 21,038.95 55,632.08
17%
COMPACTOR - - - - - -
BULDOZER,
RENTAL +
27% MACHINE/
DIESEL OPERATOR COST KB1
LORRY
SALARY
BACKHOE 2,967.79 15,706.73 18,674.52
EXCAVATOR, GRADER 1,581.85 11,206.73 12,788.58
22%
EXCAVATOR 2,873.00 10,687.50 13,560.50
BACKHOE,
30% BULDOZER 2,922.93 13,384.62 16,307.55
COMPACTOR - - -
LORRY - - -
GRADER, 21% SUB-TOTAL 10,345.58 50,985.58 61,331.15
BEFORE
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 22
21
RENTAL +
MACHINE/
DIESEL OPERATOR COST KB2
BULDOZER LORRY
45% SALARY
BACKHOE 2,878.02 10,817.31 13,695.33
GRADER 1,296.05 6,865.38 8,161.44
BACKHOE
34% EXCAVATOR - - -
BULDOZER 4,142.00 13,932.69 18,074.69
GRADER COMPACTOR - - -
21%
LORRY - - -
BEFORE SUB-TOTAL 8,316.07 31,615.38 39,931.46
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 22
22
BULDOZER, 2%
RENTAL +
MACHINE/
DIESEL OPERATOR COST KB3
LORRY
EXCAVATOR,
SALARY
59% BACKHOE 2,792.57 9,995.19 12,787.76
GRADER 171.54 908.65 1,080.19
BACKHOE, 36% EXCAVATOR 6,023.02 15,009.62 21,032.64
BULDOZER 134.39 615.38 749.77
COMPACTOR - - -
LORRY - - -
SUB-TOTAL 9,121.51 26,528.85 35,650.36
BEFORE AFTER
GRADER, 3%
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 2323
RENTAL +
MACHINE/
DIESEL OPERATOR COST PB
LORRY
SALARY
BACKHOE 1,482.20 11,376.92 12,859.12
GRADER - - -
EXCAVATOR - - -
BACKHOE
100% BULDOZER - - -
COMPACTOR - - -
LORRY - - -
SUB-TOTAL 1,482.20 11,376.92 12,859.12
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 24
24
RENTAL +
MACHINE/
DIESEL OPERATOR COST SA
EXCAVATOR LORRY
36%
SALARY
BACKHOE 4,900.50 20,423.08 25,323.58
GRADER 854.85 11,408.65 12,263.50
EXCAVATOR 5,154.33 15,884.62 21,038.95
BACKHOE
43% BULDOZER - - -
GRADER
21%
COMPACTOR - - -
LORRY - - -
SUB-TOTAL 10,909.68 47,716.35 58,626.03
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 24
25
RENTAL +
MACHINE/
DIESEL OPERATOR COST LPM
LORRY
SALARY
BACKHOE 635.00 2,942.31 3,577.31
GRADER - - -
EXCAVATOR LORRY
34% 56% EXCAVATOR 31,791.80 67,500.00 99,291.80
BULDOZER 2,974.00 7,673.08 10,647.08
COMPACTOR 2,477.52 11,267.31 13,744.83
LORRY 16,720.46 144,639.69 161,360.15
SUB-TOTAL 54,598.78 234,022.38 288,621.16
BACKHOE
1%
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 24
26
ESTATE KB2 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 TOTAL
WORK HOURS 289 276 259 250 1074
BACKHOE
COST 18,570.40 16,796.81 15,893.83 13,695.33 64,956.37
WORK HOURS 56 26 136 218
GRADER
COST 3,140.50 1,500.13 8,161.44 12,802.07
WORK HOURS 86 86
EXCAVATOR
COST 7,891.55 7,891.55
WORK HOURS 184 184
BULDOZER
COST 18,074.69 18,074.69
WORK HOURS 66 66
COMPACTOR
COST 3,422.00 3,422.00
WORK HOURS 497 276 285 570 0 0 0 0 0 0 0 0 1628
TOTAL
COST 33,024.45 16,796.81 17,393.96 39,931.46 - - - - - - - - 107,146.68
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 24
27
ESTATE PB Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 TOTAL
WORK HOURS 256 264 260 232 1012
BACKHOE
COST 15,848.09 15,926.08 15,209.41 12,859.12 59,842.70
WORK HOURS 0
GRADER
COST -
WORK HOURS 0
EXCAVATOR
COST -
WORK HOURS 0
BULDOZER
COST -
WORK HOURS 0
COMPACTOR
COST -
WORK HOURS 256 264 260 232 0 0 0 0 0 0 0 0 1012
TOTAL
COST 15,848.09 15,926.08 15,209.41 12,859.12 - - - - - - - - 59,842.70
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 24
28
ESTATE LPM Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 TOTAL
WORK HOURS 54 116 122 68 360
BACKHOE
COST 3,352.81 6,779.27 7,341.34 3,577.31 21,050.73
WORK HOURS 0
GRADER
COST -
WORK HOURS 502 823 969 780 3074
EXCAVATOR
COST 65,125.38 92,266.84 113,635.62 99,291.80 370,319.64
WORK HOURS 183 84 267
BULDOZER
COST 22,062.72 10,647.08 32,709.80
WORK HOURS 102 279 272 252 905
COMPACTOR
COST 5,288.54 15,515.13 16,486.96 13,744.83 51,035.46
WORK HOURS 1633 1652 1723 2072 7080
LORRY
COST 126,102.69 122,384.41 132,024.93 161,360.15 541,872.18
WORK HOURS 2291 2870 3269 3256 11686
TOTAL
COST 199,869.42 236,945.65 291,551.57 288,621.17 - - - - - - - - 1,016,987.81
LIQUID PALM GROWER SDN BHD | INFRASTRUCTURE DEPT 25