Professional Documents
Culture Documents
Loading Unloading
Loading Unloading
Loading Unloading
& Date
LOADING UNLOADING PERMIT
Project & Unit: Emergency Contact Nos
HSEP:12-F09 Agency:
12. Other:
The conditions mentioned in the above checklist are sufficient for safe completion of this activity. These have been checked and found complied before issuing the
Permit, and shall be monitored and ensured throughout the currency of this Permit.
A. Permit Requester/ Receiver (Agency):
Site Engineer: Site HSE Officer:
Signature: Signature:
Name: Designation: Name: Designation:
B. Permit Issuer (BHEL):
Site HSE Officer/ Authorized Representative: Site Engineer/ Authorized Representative:
Signature: Signature:
Name: Designation: Name: Designation:
C. Package-in-charge (BHEL):
Signature:
Name: Designation:
(* Permit valid for 14 days as per overleaf format)
Original: Permittee 2 nd Copy: Agency Deptt. HOS 3rd Copy: BHEL Site HSE
P.T.O. Page 1 of 2
Bharat Heavy Electricals Limited, Power Sector
Permit No. & Date:
__________________________
Daily Work Area Condition Endorsement _
Remarks (if any) & Signature with Date & Time
Day Date Agency Site Engineer Agency HSE Officer BHEL Site Engineer * BHEL HSE Officer *
2
10
11
12
13
14