Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Sealine is a specialized Marina Construction Company delivering turn key projects from Marina design to Fabrication, Construction and

Installation. We offer service from site assessment to concept design and actual project documentation, design and execution.

Sealine is an ISO Certified Organization with qualified marina professionals, fabricators, welders, electricians, and Carpenters. Sealine
Marine Services FZE is located in the Emirate of Sharjah of United Arab Emirates with a total infrastructure of 75000 sqft areas. In
addition to the operations from Sharjah, Sealine management has recently open its door by setting up a new fabrication unit in India at
Chennai under the name of Sealine Indian PVT Ltd to grab the business opportunity in the region and Supply the right deliverable to the
Indian market. Sealine as a group of companies, can also undertake jobs from the Marine Industry providing Mechanical, Electrical &
Fabrication jobs.
Sealine understands that every Marina project is different and has different requirements. Sealine with its established
associate companies have the industrial knowledge and experience to provide operational, technical support and full project
management expertise. In Co-ordination with reliable transportation companies to secure an efficient supply chain that would
ensure that our products reach our customers inside and outside UAE in a timely punctual manner to meet our projects
delivery time frames.
Sealine Pontoon systems are always design to the best to suit the project’s requirements. Depending on project requirement
and clients preferences, applying professional value engineering analysis either Concrete Pontoon system, Aluminium
Pontoon system or Plastic Pontoon system can be used.

All our Pontoon systems are available as modular and of any shapes & configuration. All systems can be moored either using
piles or Seaflex. Our Pontoon systems are durable and require only minimal maintenance throughout their lifetime. Concrete
Pontoon system consist of steel reinforced concrete pontoons connected to each other at site. All units have positive floatation
due to their EPS core that ensures the most efficient required lifetime buoyancy.

Aluminium Pontoon system can be equipped with either wood plastic composite, hardwood or GRP Decking. Floats are
made either of GRP filled with EPS or reinforced concrete with EPS Core.
SEALINE MARINE SERVICES FZE is accredited to the Integrated Management System as below
ISO 901:2015
ISO 14001:2015
ISO 45001:2018
The Quality Objective are:

 Improve the profitability and company value to our Customer


 Reduce Risk
 Solidify our identity with our customers
 Improve employee well being
 Crate an efficient Integral management system

It is a Sealine Marine Services FZE policy to identify our customer requirements and provide a product or service or service that meets customer
satisfaction, delivery on time or exceeds these, by the use of processes, materials or product that avoid, reduce or control pollution and comply with all
relevant laws, standards and other regulations applicable to business.

Recognizing the hazards, present in our industry, Sealine Marine Services FZE will take every practicable step to provide and maintain a safe and
healthy work environment for all employees, subcontractors, visitors and other stake holders who may be affected or come into contact with Sealine.

In order to achieve our aims, Sealine Marine Services FZE has implemented a Quality Management System (QMS) based on the requirements of ISO
9001: 2015

Targets are established and measured to assist Sealine Marine Services FZE in seeking improvement in all aspect of the QMS.

The Policy is communicated to all our staff is available to the public and will be periodically reviewed to ensure its continued stability.
Sealine is an ISO certified organization with the team of well qualified and experienced manpower from top management to the bottom level.
AL DHABIYA AL RUMAITHA VILLA – ABU DHABI
RAS GHURAB ISLAND DEVELPOMENT – ABU DHABI
KOCHI WATER METRO TERMINAL – KOCHI INDIA
PREVIOUS PROJECTS

CLIENT NAME PROJECT NAME PROJECT LOCATION START DATE END DATE SCOPE OF WORK CURRENT STATUS
SUPPLY OF ALUMINIUM
GANGWAYS, RAISED PLATFORM,
MARINAS PERFORMANCE AL REEM ISLAND DEVELOPMENT ABUDHABI Nov - 2017 Jul-18 COMPLETE
SECURITY GATE,
MEP WORKS

SUPPLY OF SS HANDRAILS
MARINAS PERFORMANCE SEA PALACE ABUDHABI May-18 Jun-18 COMPLETE
WITH WOODEN TOP RAIL

REFURBISHMENT OF ALUMINIUM PONTOONS AT SUPPLY OF


HAWK MARINE LLC ABUDHABI Sep-18 Dec-18 COMPLETE
ABU DHABI INTERNATIONAL MARINE SPORTS CLUB ALUMINIUM
PONTOONS
SUPPLY OF ALUMINIUM
GANGWAYS, ELEVATED
MARINAS PERFORMANCE BLUE WATER - RTA FERRY BERTH DUBAI Feb-18 Jun-18 COMPLETE
PLATFORM, INTERMEDIATE MS
PILE PLATFORM

SUPPLY OF ALUMINIUM
SEPTECH EMIRATES LLC MARASI PARK DUBAI Dec-21 Jan-18 COMPLETE
GANGWAYS, FLOATING LADDERS

SUPPLY OF ALUMINIUM
MARINETEK CONTRACTING LLC DEIRA ISLAND 6 MARINAS DUBAI Sep-18 Dec-18 GANGWAYS, SS PILE COMPLETE
GUIDES,FLOATING LADDERS

SUPPLY OF
TARGET ENGG COMPANY LLC DEIRA ISLAND 6 MARINAS DUBAI Nov-18 Jan-19 COMPLETE
ALUMINIUM
GANGWAYS

MARINA MEP WORKS, SECURITY


APCC CONTRACTING LLC DEIRA ISLAND 6 MARINAS DUBAI Nov-18 Oct-19 COMPLETE
GATES, HANDRAILS

SUPPLY OF ALUMINIUM
SEPTECH EMIRATES LLC DUBAI HARBOUR ZONE 4D(EAST) DUBAI Jan-20 Apr-20 GANGWAYS, ALUMINIUM PILE COMPLETE
GUIDES, FLOATING LADDERS

SUPPLY OF ALUMINIUM
OVERSEAS AST LLC DUBAI HARBOUR ZONE 4D(WEST) DUBAI Mar-20 Jun-20 COMPLETE
GANGWAYS, RAISED PLATFORM
SUPPLY OF MILD STEEL
PLATFORM, ALUMINIUM
TARGET ENGG COMPANY LLC MARSA AL ARAB DEVELOPMENT DUBAI Mar-20 Aug-20 COMPLETE
ELEVATED PLATFORM,
CONNECTION RAMPS
EPC FOR AL DABIYYA AL THAMAMA SUPPLY OF ALUMINIUM
MARINAS PERFORMANCE ABUDHABI Jul-20 Sep-20 COMPLETE
ZONE B TRANSITIONZONE DEVELOPMENTS GANGWAY.

SUPPLY OF ALUMINIUM
HESICO KNPC PORT DEVELOPMENT KUWAIT Oct-20 Jan-21 COMPLETE
GANGWAYS

SUPPLY OF ALUMINIUM
ARMED FORCES OFFICERS CLUB HOTEL - GANGWAYS, MILD STEEL
MARINETEK CONTRACTING LLC ABUDHABI Feb-21 Apr-21 COMPLETE
WATER TAXI BERTH PLATFORM, STAINLESS STEEL
LADDERS
SUPPLY OF ALUMINIUM
GANGWAYS, MILD STEEL
MARINETEK CONTRACTING LLC AL JAZIRA AL HAMRA FACILITY DEVELOPMENT RAS AL KHAIMAH Apr-21 Jun-21 COMPLETE
PLATFORM, STAINLESS STEEL
LADDERS, MEP WORKS
SUPPLY OF ALUMINIUM
GANGWAYS, STAINLESS STEEL
RUWAIS MARINE SERVICES WLL DEVELOPMENT OF QATAR PORT QATAR May-21 Sep-21 COMPLETE
PILE GUIDES, CONNECTION
BOXES
GANGWAYS, STAINLESS STEEL
KINGDOM OF
MARINETEK CONTRACTING LLC FORMULA 1 - JEDDAH Sep-21 Nov-21 PILE GUIDES, CONNECTION COMPLETE
SAUDI ARABIA
BOXES, SAFETY LADDERS
SUPPLY OF ALUMINIUM
MAJESTIC MARINE GANGWAYS, STAINLESS STEEL
AL YASSAT ISLAND - ABUDHABI UAE Nov-21 Dec-21 COMPLETE
ENGINEERING PILE GUIDES, CONNECTION
BOXES, SAFETY LADDERS

NMDC BAIT AL LOOZ VILLA- ABU DHABI UAE Dec-21 Jan-22 FULL ALUMINIUM MARINA COMPLETE

NMDC AL RUMAITHA VILLA - ABU DHABI UAE Jan-22 Feb-22 FULL ALUMINIUM MARINA COMPLETED

SUPPLY OF ALUMINIUM
GANGWAYS, STAINLESS STEEL
MARINETEK CONTRACTING LLC TRADITIONAL SOUQ 2 - ABU DHABI UAE Jan-22 Mar-22 COMPLETED
PILE GUIDES, CONNECTION
BOXES, SAFETY LADDERS

MAJESTIC MARINE ALUMINIUM GANGWAY, PILE


HAIL & GHASA ISLAND DEVELOPMENT - ABU DHABI UAE Feb-22 ONGOING
ENGINEERING GUIDE, LADDER &HANDRAILS

KOCHI WATER METRO LIMITED AUG-22 FULL ALUMINIUM MARINA


KOCHI WATER METRO TERMINALS INDIA JULY-22 COMPLETED

You might also like