TRANSMISSION CORPORATION OF ANDHRA PRADESH LTD

From To
Deputy Executive Engineer The Executive Engineer
400KV MRT 400KV MRT
Sattenapalli. Vijayawada.

Lr.No: DEE/MRT/400KV/Sattenapalli/F.No: 40/D.No:121/23/Date: 25-08-2023

Sir,
Sub:-APTransco –400KV SS Sattenapalli, MRT Sub-division - New OVR (Over Voltage
Relay) Stage-I settings are adopted for 400KV feeders of 400KV SS Sattenapalli–Report-
submitted – regarding.

***
Ref:-1) Lr.No.SRPC/SE (P, C & SS)/2023/3423-57 Dated:-11th August 2023.
2)Lr.No.CE/Plg, PS/VS/VJA/SP.12/F.64/D.No.143/2023, Dt.11-08-2023.

As per the general recommendations of SRPC cited in above references, New OVR
(Over Voltage Relay) Stage-1 settings are adopted on 400KV feeders at 400KV SS Sattenapalli as
shown below:-
From Bus To Bus No./ New Feeder Main 1 Main 2 Remarks
No./ Name OVR Name Exist Adopt Exist Adopt
Name grading ed ed ed ed
to be
implemen
ted
(@From
Bus end)
414021/ 414013/ A 400KV 122 V 122 V 111 111% 1) Since all
STNP4_AT VTS44_AG Sattenapalli Ph-Ph Ph-Ph % & & the Micom
– VTS 1 & 10 & 10 10 10 sec relays have
sec sec sec a voltage
414021/ 414013/ E 400KV 121 V 121 V 110 110% resolution of
STNP4_AT VTS44_AG Sattenapalli Ph-Ph Ph-Ph % & & 1volt. They
– VTS 2 &6 &7 6sec 7 sec are adopted
sec sec with VPh-
414021/ 424005/ D 400KV 121 V 121 V 110 110% Ph instead
STNP4_AT SLML4_A Sattenapalli Ph-Ph Ph-Ph % & & of VPh-N in
G – Srisailam &9 &8 9 sec 8 sec settings tab.
I sec sec
414021/ 424005/ H 400KV 120 V 120 V 109 109% 2) All
STNP4_AT SLML4_A Sattenapalli Ph-Ph Ph-Ph %& & numerical
G – Srisailam &5 &5 5 sec 5 sec relays
II sec sec existing at
414021/ 414043/ B 400KV 122 V 122 V 111% 111% 400 KV
STNP4_AT PDLI4_AT Sattenapalli Ph-Ph Ph-Ph & 9 & Sattenapalli
– Podili I &9 &9 sec 9 sec has drop-off
sec sec to pickup
414021/ 414043/ F 400KV 120 V 121 V 109% 110% ratio > 0.97
STNP4_AT PDLI4_AT Sattenapalli Ph-Ph Ph-Ph & 6 & only.
– Podili II &6 &6 sec 6 sec
sec sec
414021/ 414014/ C 400KV 121 V 121 V 110% 110%
STNP4_AT VMGR4_A Sattenapalli Ph-Ph Ph-Ph & &
T – Vemagiri &8 &9 8 sec 9 sec
I sec sec 3) OVR_
414021/ 414014/ G 400KV 120 V 120 V 109 109% START
STNP4_AT VMGR4_A Sattenapalli Ph-Ph Ph-Ph % & & 6 signal is
T – Vemagiri &4 &6 4 sec sec configured
II sec sec for
414021/ 414049/ A 400KV 70.5 70.5 122 V 122 V triggering
STNP4_AT CPETA_PG Sattenapalli Ph-N Ph-N Ph-Ph Ph-Ph Event log &
– & 10 & 10 & 10 & 10 OVR-I
Chilakaluri sec sec sec sec TRIP signal
peta I is
414021/ 414049/ D 400KV 69.9V 69.9 V 121 V 121 V configured
STNP4_AT CPETA_PG Sattenapalli Ph-N Ph-N Ph-Ph Ph-Ph for
– &7 &8 &7 &8 triggering
Chilakaluri sec sec sec sec DR & EL.
peta II
4) Also,
Over
Voltage
Stage-II
protection of
all relays is
implemente
d with 140%
of nominal
voltage
pickup &
100 msec
time delay.
This is submitted for favour of information please.

Deputy Executive Engineer,


400 KV MRT, Sattenapalli.