Professional Documents
Culture Documents
Proposal For Septic Tank
Proposal For Septic Tank
Proposal For Septic Tank
UNIT COST
ITEM NO ITEM DESCRIPTION QTY. UNIT TOTAL UNIT COST TOTAL COST
MATERIAL LABOR
I. GENERAL REQUIREMENTS/PRELIMINARIES
2 Supervision and Engineering 1.00 lot 10,000.00 10,000.00
ERICKSON I. MARCOS
Design Architect