HEALTH AND SAFETY INSPECTIONCORRECTIVE ACTION REPORT hjiij

NATIONAL
Contractor ALUMINIUM Client EMAAR
DUBAI MALL
ROOF TOP ACP
Project Name CLADDING Date of Visit 07/12/2023
REPLACMENT
37473930-
Date of close out 09/01/2024 WSP Report Reference No WSP-SR–
HSE-SIR-02
WSP Findings Action Taken (KMEP) Closeout Photograph
1. Observation: Utilities Walkways provided for
safe access above
Hazard/Risk: existing utility line to
Potential damage to the live utility protect it from damage.
line unprotected at the access
route.

Recommendations:
The contractor was notified and
advised to protect the utility line
immediately.

Prepared by JITU SURENDRAN Signature

Reviewed by FAIYAZ AHMED Signature

WSP Comments